Specifications:
·
Install all components, as per
drawings, specifications and to the requirements of local building codes, and
plumbing codes.
Install all components, as per
drawings, specifications and to the requirements of local building codes, and
plumbing codes.
·
All material to be C.S.A. approved.
All material to be C.S.A. approved.
·
Arrange necessary inspections.
Arrange necessary inspections.
·
Layout locations of fixtures, taps
and drains on site with owner.
Layout locations of fixtures, taps
and drains on site with owner.
·
Arrange and co-ordinate delivery of
all materials.
Arrange and co-ordinate delivery of
all materials.
·
Arrange for service layout and
connect service with local utility.
Arrange for service layout and
connect service with local utility.
·
Repair any damage incurred from
installations.
Repair any damage incurred from
installations.
·
Install separate shut offs to all
locations for both hot and cold potable water supply.
Install separate shut offs to all
locations for both hot and cold potable water supply.
·
Obtain and pay for required permits.
Obtain and pay for required permits.
·
Supply |
Install
|
Inspected
|
||
______
|
______
|
_____
|
All rough in of water and drain
pipes. |
|
______
|
______
|
_____
|
Kitchen sink and taps.
|
|
______
|
______
|
_____
|
Garbarator.
|
|
______
|
______
|
_____
|
Dishwasher.
|
|
______
|
______
|
_____
|
Refrigerator ice maker water line.
|
|
______
|
______
|
_____
|
Bathroom sinks and taps.
|
|
______
|
______
|
_____
|
Toilets and seats.
|
|
______
|
______
|
_____
|
Bathtubs and taps.
|
|
______
|
______
|
_____
|
Bidets and taps.
|
|
______
|
______
|
_____
|
Showers and taps.
|
|
______
|
______
|
_____
|
Spa.
|
|
______
|
______
|
_____
|
Laundry tubs and taps.
|
|
______
|
______
|
_____
|
Washing machine drain and taps.
|
|
______
|
______
|
_____
|
Exterior hosebibs.
|
|
______
|
______
|
_____
|
Plumbing traps.
|
|
______
|
______
|
_____
|
||
______
|
______
|
_____
|
Well pump.
|
|
______
|
______
|
_____
|
Sewage and/or greywater pump.
|
|
______
|
______
|
_____
|
Municipal sewer and water
connections. |
|
______
|
______
|
_____
|
Septic and well connections.
|
|
______
|
______
|
_____
|
Stack gasket on roof.
|
|
______
|
______
|
_____
|
Trench for service connection's.
|
|
______
|
______
|
_____
|
Backfill for trench.
|
|
______
|
______
|
_____
|
Water softener.
|
|
______
|
______
|
_____
|
Water purification system, of
type; |
_______________________
|
______
|
______
|
_____
|
Hot water heater, of type and size;
|
_______________________
|
Hot water heater to be rented
_______, or Purchased _______________, for $_______.__
_______, or Purchased _______________, for $_______.__
Plumbing fixture allowance;
$_______________________________.______ Tap allowance;
$_______________________________.______
$_______________________________.______ Tap allowance;
$_______________________________.______
$______________.____ for
_____________________________________
_____________________________________
$______________.____ for _____________________________________
Sub total:
$____________________._____
$____________________._____
G.S.T.: $____________________._____
P.S.T: $____________________._____
TOTAL: $____________________._____
Obligations of owner to contractor:
Site
preparation___________________________________________
preparation___________________________________________
Other___________________________________________________
Lead time required
________________________________________
________________________________________
Terms of payment:
Hold back of 10% for 30 days upon
completion ($___________.____)
completion ($___________.____)
Contractors on site time to be: _______________________________________________
Service and rough
in:_______________________________________________
in:_______________________________________________
Connect and
finish:_______________________________________________
finish:_______________________________________________