Friday, December 9, 2016

Marilyn Monroe: The FBI Files: Rare And Controversial FBI Files

https://images-na.ssl-images-amazon.com/images/I/51hpJjTW6CL._SX384_BO1,204,203,200_.jpg



https://www.amazon.com/Marilyn-Monroe-Files-Rare-Controversial/dp/1540514927/





Rare And Controversial FBI Files. Like many of the stars of her era, Marilyn Monroe's movements, relationships and comments weren't just devoured by fans they were followed closely by the Federal Bureau of Investigation (FBI). Records kept on Monroe, many of which were filed under "Foreign Counterintelligence," have intrigued many who have sought to learn more about the film star, including those who investigated her death. Monroe's star power and fears she might be recruited by the Communist Party during the tenure of longtime FBI Director J. Edgar Hoover led to reports being taken on her activities and relationships, including her marriage to playwright Arthur Miller. Monroe's file begins in 1955 and mostly focuses on her travels and associations, searching for signs of leftist views and possible ties to communism. The file continues up until the months before her death, and also includes several news stories and references to the biography of the actress, which focused on questions about whether Monroe was killed by the government. These are scanned copies of the actual FBI file in entirety. You'll even see the hand written notes. THIS BOOK WILL ABSOLUTELY BLOW YOUR MIND. A DEFINITE MUST READ! THE FBI NEVER WANTED THE PUBLIC TO SEE THIS FILE. GET YOUR COPY NOW!

Tuesday, November 8, 2016

Sample Roofing Contract

Specifications:
• Supply tools and equipment necessary to complete work.
• Supply nails required to complete all work.
• Keep job site and materials in an orderly fashion.
• Hoist all materials to roof levels.
• Color and type of shingle to be:_________________________________________________
Quality of shingle to be:_______________________________ year guaranteed by manufacturer.
Supply Install Inspected
______ ______ ______ Ice and water shield.
______ ______ ______ Metal Drip edge.
______ ______ ______ Metal drib edge on gables.
______ ______ ______ Shingles.
______ ______ ______ 50lb. Felt under valleys.
______ ______ ______ Metal valleys.
______ ______ ______ 15lb. Perforated felt.
______ ______ ______ All flashing.
______ ______ ______ Roof vents.
______ ______ ______ Skylights.
______ ______ ______ Caulk and seal where required.
Extra Charges if any
$______________.____ for _____________________________________
$______________.____ for _____________________________________
$______________.____ for _____________________________________
Sub total: $____________________._____
G.S.T.: $____________________._____
P.S.T: $____________________._____
TOTAL: $____________________._____
Obligations of owner to contractor:
Site preparation___________________________________________
Other___________________________________________________
Lead time required ________________________________________
Terms of payment:
Hold back of 10% for 30 days upon completion ($___________.____)
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
Contractors on site time to be:_______________________________________________



This is a DtiCorp.com document

Thursday, October 27, 2016

Sample Plumbing Contract



 

Specifications:
·
Install all components, as per
drawings, specifications and to the requirements of local building codes, and
plumbing codes.
·
All material to be C.S.A. approved.
·
Supply own tools and equipment
necessary to complete all work.
·
Arrange necessary inspections.
·
Layout locations of fixtures, taps
and drains on site with owner.
·
Arrange and co-ordinate delivery of
all materials.
·
Arrange for service layout and
connect service with local utility.

·
Repair any damage incurred from
installations.
·
Install separate shut offs to all
locations for both hot and cold potable water supply.
·
Obtain and pay for required permits.

·
Supply

Install

Inspected





______

______

_____

All rough in of water and drain
pipes.



______

______

_____

Kitchen sink and taps.



______

______

_____

Garbarator.



______

______

_____

Dishwasher.



______

______

_____

Refrigerator ice maker water line.



______

______

_____

Bathroom sinks and taps.



______

______

_____

Toilets and seats.



______

______

_____

Bathtubs and taps.



______

______

_____

Bidets and taps.



______

______

_____

Showers and taps.



______

______

_____

Spa.



______

______

_____

Laundry tubs and taps.



______

______

_____

Washing machine drain and taps.



______

______

_____

Exterior hosebibs.



______

______

_____

Plumbing traps.



______

______

_____

Sump pumps.



______

______

_____

Well pump.



______

______

_____

Sewage and/or greywater pump.



______

______

_____

Municipal sewer and water
connections.



______

______

_____

Septic and well connections.



______

______

_____

Stack gasket on roof.



______

______

_____

Trench for service connection's.



______

______

_____

Backfill for trench.



______

______

_____

Water softener.



______

______

_____

Water purification system, of
type;

_______________________

______

______

_____

Hot water heater, of type and size;

_______________________
Hot water heater to be rented
_______, or Purchased _______________, for $_______.__
Plumbing fixture allowance;
$_______________________________.______ Tap allowance;
$_______________________________.______
$______________.____ for
_____________________________________
$______________.____ for _____________________________________
Sub total:
$____________________._____
G.S.T.: $____________________._____
P.S.T: $____________________._____
TOTAL: $____________________._____
Obligations of owner to contractor:
Site
preparation___________________________________________
Other___________________________________________________
Lead time required
________________________________________
Terms of payment:
Hold back of 10% for 30 days upon
completion ($___________.____)
Contractors on site time to be: _______________________________________________
Service and rough
in:_______________________________________________
Connect and
finish:_______________________________________________
This is a DtiCorp.com document

Tuesday, October 25, 2016

Sample HVAC Contract

Specifications:
· 
Install all components, as per
drawings, specifications and to the requirements of local building codes.
· 
All material to be C.S.A. approved.
· 
Supply own tools and equipment
necessary to complete all work.
· 
Arrange necessary inspections.
· 
Layout locations of all ductwork and
vents on site with owner.
· 
Supply heat loss.
· 
Arrange and co-ordinate delivery of
all
HVAC materials.
· 
Arrange for service layout and
connect service with local utility.

· 
Repair any damage incurred from
installations.
· 
Obtain and pay for required permits.

· 
Supply

Install

Inspected



_____

_____

_____

Furnace, ductwork and air returns.

_____

_____

_____

Exhaust vents or chimney.

_____

_____

_____


_____

_____

_____

Gas lines and connections.

_____

_____

_____

Oil tank, fuel lines and
connections.

_____

_____

_____

Screws and duct tape.

_____

_____

_____

Ductwork insulation where
required.

_____

_____

_____

Range hood vent.

_____

_____

_____

Dryer vent.

_____

_____

_____


_____

_____

_____

Hot water heater if gas.

_____

_____

_____

Gas lines and connect for range
and dryer.

_____

_____

_____

Air conditioner or heat pump.

_____

_____

_____

Diffusers and grills.

_____

_____

_____

Trench for services.

_____

_____

_____

Backfill.
Gas hot water heater to be rented
_______, or Purchased _______________, for $_______.__
List all components of heating
system.
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________

Extra Charges if any
$______________.____ for
_____________________________________
$______________.____ for
_____________________________________
$______________.____ for
_____________________________________
Subtotal:
$____________________._____
G.S.T.: $____________________._____
P.S.T: $____________________._____
TOTAL: $____________________._____
Obligations of owner to contractor:
Site
preparation___________________________________________
Other___________________________________________________
Lead time required
________________________________________
Terms of payment:
Hold back of 10% for 30 days upon
completion ($___________.____)
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________

Contractors on site time to be:
Service and rough
in:_______________________________________________
Connect and
finish:_______________________________________________


This is a DtiCorp.com document