Friday, December 9, 2016
Marilyn Monroe: The FBI Files: Rare And Controversial FBI Files
https://www.amazon.com/Marilyn-Monroe-Files-Rare-Controversial/dp/1540514927/
Rare And Controversial FBI Files. Like many of the stars of her era, Marilyn Monroe's movements, relationships and comments weren't just devoured by fans they were followed closely by the Federal Bureau of Investigation (FBI). Records kept on Monroe, many of which were filed under "Foreign Counterintelligence," have intrigued many who have sought to learn more about the film star, including those who investigated her death. Monroe's star power and fears she might be recruited by the Communist Party during the tenure of longtime FBI Director J. Edgar Hoover led to reports being taken on her activities and relationships, including her marriage to playwright Arthur Miller. Monroe's file begins in 1955 and mostly focuses on her travels and associations, searching for signs of leftist views and possible ties to communism. The file continues up until the months before her death, and also includes several news stories and references to the biography of the actress, which focused on questions about whether Monroe was killed by the government. These are scanned copies of the actual FBI file in entirety. You'll even see the hand written notes. THIS BOOK WILL ABSOLUTELY BLOW YOUR MIND. A DEFINITE MUST READ! THE FBI NEVER WANTED THE PUBLIC TO SEE THIS FILE. GET YOUR COPY NOW!
Tuesday, November 8, 2016
Sample Roofing Contract
Specifications:
• Supply tools and equipment necessary to complete work.
• Supply nails required to complete all work.
• Keep job site and materials in an orderly fashion.
• Hoist all materials to roof levels.
• Color and type of shingle to be:_________________________________________________
Quality of shingle to be:_______________________________ year guaranteed by manufacturer.
Supply Install Inspected
______ ______ ______ Ice and water shield.
______ ______ ______ Metal Drip edge.
______ ______ ______ Metal drib edge on gables.
______ ______ ______ Shingles.
______ ______ ______ 50lb. Felt under valleys.
______ ______ ______ Metal valleys.
______ ______ ______ 15lb. Perforated felt.
______ ______ ______ All flashing.
______ ______ ______ Roof vents.
______ ______ ______ Skylights.
______ ______ ______ Caulk and seal where required.
Extra Charges if any
$______________.____ for _____________________________________
$______________.____ for _____________________________________
$______________.____ for _____________________________________
Sub total: $____________________._____
G.S.T.: $____________________._____
P.S.T: $____________________._____
TOTAL: $____________________._____
Obligations of owner to contractor:
Site preparation___________________________________________
Other___________________________________________________
Lead time required ________________________________________
Terms of payment:
Hold back of 10% for 30 days upon completion ($___________.____)
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
Contractors on site time to be:_______________________________________________
This is a DtiCorp.com document
• Supply tools and equipment necessary to complete work.
• Supply nails required to complete all work.
• Keep job site and materials in an orderly fashion.
• Hoist all materials to roof levels.
• Color and type of shingle to be:_________________________________________________
Quality of shingle to be:_______________________________ year guaranteed by manufacturer.
Supply Install Inspected
______ ______ ______ Ice and water shield.
______ ______ ______ Metal Drip edge.
______ ______ ______ Metal drib edge on gables.
______ ______ ______ Shingles.
______ ______ ______ 50lb. Felt under valleys.
______ ______ ______ Metal valleys.
______ ______ ______ 15lb. Perforated felt.
______ ______ ______ All flashing.
______ ______ ______ Roof vents.
______ ______ ______ Skylights.
______ ______ ______ Caulk and seal where required.
Extra Charges if any
$______________.____ for _____________________________________
$______________.____ for _____________________________________
$______________.____ for _____________________________________
Sub total: $____________________._____
G.S.T.: $____________________._____
P.S.T: $____________________._____
TOTAL: $____________________._____
Obligations of owner to contractor:
Site preparation___________________________________________
Other___________________________________________________
Lead time required ________________________________________
Terms of payment:
Hold back of 10% for 30 days upon completion ($___________.____)
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
Contractors on site time to be:_______________________________________________
This is a DtiCorp.com document
Thursday, October 27, 2016
Sample Plumbing Contract
Specifications:
·
Install all components, as per
drawings, specifications and to the requirements of local building codes, and
plumbing codes.
Install all components, as per
drawings, specifications and to the requirements of local building codes, and
plumbing codes.
·
All material to be C.S.A. approved.
All material to be C.S.A. approved.
·
Arrange necessary inspections.
Arrange necessary inspections.
·
Layout locations of fixtures, taps
and drains on site with owner.
Layout locations of fixtures, taps
and drains on site with owner.
·
Arrange and co-ordinate delivery of
all materials.
Arrange and co-ordinate delivery of
all materials.
·
Arrange for service layout and
connect service with local utility.
Arrange for service layout and
connect service with local utility.
·
Repair any damage incurred from
installations.
Repair any damage incurred from
installations.
·
Install separate shut offs to all
locations for both hot and cold potable water supply.
Install separate shut offs to all
locations for both hot and cold potable water supply.
·
Obtain and pay for required permits.
Obtain and pay for required permits.
·
Supply |
Install
|
Inspected
|
||
______
|
______
|
_____
|
All rough in of water and drain
pipes. |
|
______
|
______
|
_____
|
Kitchen sink and taps.
|
|
______
|
______
|
_____
|
Garbarator.
|
|
______
|
______
|
_____
|
Dishwasher.
|
|
______
|
______
|
_____
|
Refrigerator ice maker water line.
|
|
______
|
______
|
_____
|
Bathroom sinks and taps.
|
|
______
|
______
|
_____
|
Toilets and seats.
|
|
______
|
______
|
_____
|
Bathtubs and taps.
|
|
______
|
______
|
_____
|
Bidets and taps.
|
|
______
|
______
|
_____
|
Showers and taps.
|
|
______
|
______
|
_____
|
Spa.
|
|
______
|
______
|
_____
|
Laundry tubs and taps.
|
|
______
|
______
|
_____
|
Washing machine drain and taps.
|
|
______
|
______
|
_____
|
Exterior hosebibs.
|
|
______
|
______
|
_____
|
Plumbing traps.
|
|
______
|
______
|
_____
|
||
______
|
______
|
_____
|
Well pump.
|
|
______
|
______
|
_____
|
Sewage and/or greywater pump.
|
|
______
|
______
|
_____
|
Municipal sewer and water
connections. |
|
______
|
______
|
_____
|
Septic and well connections.
|
|
______
|
______
|
_____
|
Stack gasket on roof.
|
|
______
|
______
|
_____
|
Trench for service connection's.
|
|
______
|
______
|
_____
|
Backfill for trench.
|
|
______
|
______
|
_____
|
Water softener.
|
|
______
|
______
|
_____
|
Water purification system, of
type; |
_______________________
|
______
|
______
|
_____
|
Hot water heater, of type and size;
|
_______________________
|
Hot water heater to be rented
_______, or Purchased _______________, for $_______.__
_______, or Purchased _______________, for $_______.__
Plumbing fixture allowance;
$_______________________________.______ Tap allowance;
$_______________________________.______
$_______________________________.______ Tap allowance;
$_______________________________.______
$______________.____ for
_____________________________________
_____________________________________
$______________.____ for _____________________________________
Sub total:
$____________________._____
$____________________._____
G.S.T.: $____________________._____
P.S.T: $____________________._____
TOTAL: $____________________._____
Obligations of owner to contractor:
Site
preparation___________________________________________
preparation___________________________________________
Other___________________________________________________
Lead time required
________________________________________
________________________________________
Terms of payment:
Hold back of 10% for 30 days upon
completion ($___________.____)
completion ($___________.____)
Contractors on site time to be: _______________________________________________
Service and rough
in:_______________________________________________
in:_______________________________________________
Connect and
finish:_______________________________________________
finish:_______________________________________________
This is a DtiCorp.com document
Tuesday, October 25, 2016
Sample HVAC Contract
Specifications:
·
Install all components, as per
drawings, specifications and to the requirements of local building codes.
Install all components, as per
drawings, specifications and to the requirements of local building codes.
·
All material to be C.S.A. approved.
All material to be C.S.A. approved.
·
Supply own tools and equipment
necessary to complete all work.
Supply own tools and equipment
necessary to complete all work.
·
Arrange necessary inspections.
Arrange necessary inspections.
·
Layout locations of all ductwork and
vents on site with owner.
Layout locations of all ductwork and
vents on site with owner.
·
Supply heat loss.
Supply heat loss.
·
Arrange for service layout and
connect service with local utility.
Arrange for service layout and
connect service with local utility.
·
Repair any damage incurred from
installations.
Repair any damage incurred from
installations.
·
Obtain and pay for required permits.
Obtain and pay for required permits.
· Supply |
Install |
Inspected |
|
_____ |
_____ |
_____ |
Furnace, ductwork and air returns. |
_____ |
_____ |
_____ |
Exhaust vents or chimney. |
_____ |
_____ |
_____ |
|
_____ |
_____ |
_____ |
Gas lines and connections. |
_____ |
_____ |
_____ |
Oil tank, fuel lines and connections. |
_____ |
_____ |
_____ |
Screws and duct tape. |
_____ |
_____ |
_____ |
Ductwork insulation where required. |
_____ |
_____ |
_____ |
Range hood vent. |
_____ |
_____ |
_____ |
Dryer vent. |
_____ |
_____ |
_____ |
|
_____ |
_____ |
_____ |
Hot water heater if gas. |
_____ |
_____ |
_____ |
Gas lines and connect for range and dryer. |
_____ |
_____ |
_____ |
Air conditioner or heat pump. |
_____ |
_____ |
_____ |
Diffusers and grills. |
_____ |
_____ |
_____ |
Trench for services. |
_____ |
_____ |
_____ |
Backfill. |
Gas hot water heater to be rented
_______, or Purchased _______________, for $_______.__
_______, or Purchased _______________, for $_______.__
List all components of heating
system.
system.
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
Extra Charges if any
$______________.____ for
_____________________________________
_____________________________________
$______________.____ for
_____________________________________
_____________________________________
$______________.____ for
_____________________________________
_____________________________________
Subtotal:
$____________________._____
$____________________._____
G.S.T.: $____________________._____
P.S.T: $____________________._____
TOTAL: $____________________._____
Obligations of owner to contractor:
Site
preparation___________________________________________
preparation___________________________________________
Other___________________________________________________
Lead time required
________________________________________
________________________________________
Terms of payment:
Hold back of 10% for 30 days upon
completion ($___________.____)
completion ($___________.____)
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
Contractors on site time to be:
Service and rough
in:_______________________________________________
in:_______________________________________________
Connect and
finish:_______________________________________________
finish:_______________________________________________
This is a DtiCorp.com document
Subscribe to:
Posts (Atom)