Friday, July 28, 2017
Biomechanical Basis of Human Movement 4th Edition - PDF eBook
http://dticorp.ecrater.com/p/26999971/biomechanical-basis-of-human-movement-4th - Biomechanical Basis of Human Movement 4th Edition - PDF eBook
Microbiology with Diseases by Body System 4th Edition - PDF eBook
http://dticorp.ecrater.com/p/27000040/microbiology-with-diseases-by-body-system - Microbiology with Diseases by Body System 4th Edition - PDF eBook
Petroleum Engineering Handbook: Indexes and standards Vol 7 by Larry W. Lake-PDF
http://dticorp.ecrater.com/p/27003829/petroleum-engineering-handbook-indexes-and-standards - Petroleum Engineering Handbook: Indexes and standards Vol 7 by Larry W. Lake-PDF
Principles of Health Interoperability 3rd Edition by Tim Benson - PDF eBook
http://dticorp.ecrater.com/p/26993020/principles-of-health-interoperability-3rd-edition - Principles of Health Interoperability 3rd Edition by Tim Benson - PDF eBook
Nutrition and Metabolism: Underlying Mechanisms and Clinical Consequences - PDF eBook
http://dticorp.ecrater.com/p/26992566/nutrition-and-metabolism-underlying-mechanisms-clinical - Nutrition and Metabolism: Underlying Mechanisms and Clinical Consequences - PDF eBook
Friday, December 9, 2016
Marilyn Monroe: The FBI Files: Rare And Controversial FBI Files
https://www.amazon.com/Marilyn-Monroe-Files-Rare-Controversial/dp/1540514927/
Rare And Controversial FBI Files. Like many of the stars of her era, Marilyn Monroe's movements, relationships and comments weren't just devoured by fans they were followed closely by the Federal Bureau of Investigation (FBI). Records kept on Monroe, many of which were filed under "Foreign Counterintelligence," have intrigued many who have sought to learn more about the film star, including those who investigated her death. Monroe's star power and fears she might be recruited by the Communist Party during the tenure of longtime FBI Director J. Edgar Hoover led to reports being taken on her activities and relationships, including her marriage to playwright Arthur Miller. Monroe's file begins in 1955 and mostly focuses on her travels and associations, searching for signs of leftist views and possible ties to communism. The file continues up until the months before her death, and also includes several news stories and references to the biography of the actress, which focused on questions about whether Monroe was killed by the government. These are scanned copies of the actual FBI file in entirety. You'll even see the hand written notes. THIS BOOK WILL ABSOLUTELY BLOW YOUR MIND. A DEFINITE MUST READ! THE FBI NEVER WANTED THE PUBLIC TO SEE THIS FILE. GET YOUR COPY NOW!
Tuesday, November 8, 2016
Sample Roofing Contract
Specifications:
• Supply tools and equipment necessary to complete work.
• Supply nails required to complete all work.
• Keep job site and materials in an orderly fashion.
• Hoist all materials to roof levels.
• Color and type of shingle to be:_________________________________________________
Quality of shingle to be:_______________________________ year guaranteed by manufacturer.
Supply Install Inspected
______ ______ ______ Ice and water shield.
______ ______ ______ Metal Drip edge.
______ ______ ______ Metal drib edge on gables.
______ ______ ______ Shingles.
______ ______ ______ 50lb. Felt under valleys.
______ ______ ______ Metal valleys.
______ ______ ______ 15lb. Perforated felt.
______ ______ ______ All flashing.
______ ______ ______ Roof vents.
______ ______ ______ Skylights.
______ ______ ______ Caulk and seal where required.
Extra Charges if any
$______________.____ for _____________________________________
$______________.____ for _____________________________________
$______________.____ for _____________________________________
Sub total: $____________________._____
G.S.T.: $____________________._____
P.S.T: $____________________._____
TOTAL: $____________________._____
Obligations of owner to contractor:
Site preparation___________________________________________
Other___________________________________________________
Lead time required ________________________________________
Terms of payment:
Hold back of 10% for 30 days upon completion ($___________.____)
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
Contractors on site time to be:_______________________________________________
This is a DtiCorp.com document
• Supply tools and equipment necessary to complete work.
• Supply nails required to complete all work.
• Keep job site and materials in an orderly fashion.
• Hoist all materials to roof levels.
• Color and type of shingle to be:_________________________________________________
Quality of shingle to be:_______________________________ year guaranteed by manufacturer.
Supply Install Inspected
______ ______ ______ Ice and water shield.
______ ______ ______ Metal Drip edge.
______ ______ ______ Metal drib edge on gables.
______ ______ ______ Shingles.
______ ______ ______ 50lb. Felt under valleys.
______ ______ ______ Metal valleys.
______ ______ ______ 15lb. Perforated felt.
______ ______ ______ All flashing.
______ ______ ______ Roof vents.
______ ______ ______ Skylights.
______ ______ ______ Caulk and seal where required.
Extra Charges if any
$______________.____ for _____________________________________
$______________.____ for _____________________________________
$______________.____ for _____________________________________
Sub total: $____________________._____
G.S.T.: $____________________._____
P.S.T: $____________________._____
TOTAL: $____________________._____
Obligations of owner to contractor:
Site preparation___________________________________________
Other___________________________________________________
Lead time required ________________________________________
Terms of payment:
Hold back of 10% for 30 days upon completion ($___________.____)
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
____________________________________________________________________________________________________________________________
Contractors on site time to be:_______________________________________________
This is a DtiCorp.com document
Subscribe to:
Posts (Atom)
