Monday, January 9, 2012

An Energy Upgrade Can Do More Than Just Trim Energy Costs

An energy upgrade can do more than just trim energy costs. It can help boost productivity, reduce maintenance costs and improve overall facility performance. But success is far from assured. When planning and carrying out an energy project, the facility executive must avoid common pitfalls that can doom a project before it even gets under way.


Before doing anything else, the facility executive should understand the financial aspects of the project. Most finance departments view the facility group as spenders of money rather than producers of money. An energy upgrade project can reverse that perception. Seize the opportunity to communicate the idea to the chief financial executive.


First, determine if the contemplated project is being done on a “capital” or “performance” basis. A capital project entails spending company money and needs to be budgeted accordingly. Myriad financial hurdles need to be analyzed, including costs, benefits and return on investment. Will the project involve spending company cash or will some or all portions of the project be financed? If the latter, will it be traditional financing, a capital lease or an operating lease?


The facility executive should work closely with the organization’s financial group as the project is planned. That way, the facility executive is part of a team as the financing rationale is being formulated by the accounting department.


The facility executive can expect such comments as, “Why do we have to fix or replace the lights, boiler, or HVAC systems, etc.? They work just fine.” The reason is that the project will improve the bottom line and create positive cash flow with solid return on investment. Before saying this, however, the facility executive should be well aware of the financial hurdles and return-on-investment marks that the financial officer will be using to analyze the project.


The second financing model, being used more and more in recent years, is the performance-based energy upgrade project. In that approach, the contractor or energy service company (ESCO) is compensated based on performance (with performance being measured as energy and savings), in some cases guaranteeing that energy savings will result from the upgrade initiative. These guaranteed savings are then used to pay all project costs. Generally, these projects require a long-term service agreement with the contractor to be put in place, with the guarantee validated from year to year.



Performance-based financing mechanisms can take several forms. The project capitalization value can be either on balance sheet or off balance sheet.


Of course, in a performance-based upgrade with guaranteed savings, the contractor or ESCO will charge for taking on the risk that savings will not be as high as anticipated and will have its own overhead and margins to cover. As a result, projects of this nature will generally cost more over the long term than traditional capital projects; that is, the contractor or ESCO will keep a portion of the energy savings to cover those costs, as well as the costs of planning the upgrade and installing the new equipment. A company that can fund an upgrade itself will maximize savings; if funds are available, that’s clearly the best choice. Nevertheless, a performance-based approach is often a very effective way to get energy upgrades accomplished.


There are four basic kinds of performance contractors or ESCOs: those tied to utilities, equipment vendors, mechanical and electrical contractors, or independent engineering firms (consulting/developer based). Performance contracting is a highly competitive arena with marketing sizzle and aggressive savings offerings as the norm. A performance contract can serve an organization very well if critical details in contract negotiation and financing are handled carefully.


Of course, financing is only one element that has to be considered in planning. A good project plan includes a clear statement of vision, goals, objectives and methodology, along with a simple cost-benefit schedule that describes how much money will be spent and what benefits will be achieved.


Inviting Help

Initially, the plan should be packaged as an executive-summary type report for presentation to the financial group. By labeling the first version of the plan a draft, the facility executive invites the finance department to help shape the project — a good way to build an alliance and gain buy-in before requesting formal project approval and financing.


A clear, concise plan, approximately three pages, will illustrate and highlight the financial return or savings associated to the project. In the first version, don’t include any cost-benefit analysis or return-on-investment schedules — the idea is to solicit help from the financial officer in this process and, in the best scenario, get his or her help with the project.


Because the goal is to present energy savings as revenue rather than expense, be sure to capture operational savings beyond energy costs. The project will have an operations budget that will likely be established from a previous year’s expenditure; from the perspective of a financial officer, that baseline operational budget is somewhat fixed or a given. If the facility executive can show that an upgrade will reduce this baseline operational budget, the financial reality is that the savings will go directly to the bottom line or will minimally go into an “other income” category on the balance sheet.


The secret is to not give away all of the potential savings: Some should be reserved or scheduled into an incentive or reserve fund to be used for other project initiatives that may not necessarily reduce energy costs, but may improve the business environment or facility portfolio.



There’s another reason not to build the maximum proposal savings into a proposal: Projects rarely achieve the greatest savings that seem possible on paper. If the facility executive promises that maximum level of savings — and the financial officer builds it into the budget — any shortfall could make the project a failure from a financial perspective, no matter how much money it actually saves. And the financial department will be skeptical of future proposals for energy upgrades; that will help build a bridge between the facility and finance departments, not a wall. Far better to be conservative in estimating savings, and look like a hero if the project actually does better than budgeted.


In discussions about the financial justification for an energy project, it’s important to keep life-cycle costs in a prominent place on the agenda. Many times, a good project is turned down because the financial study is based solely on first cost rather than long-term costs, including operations and maintenance expenses.


Often, a higher first cost will result in lower operating and maintenance expenses; the added expense is recouped over a very short period of time when the cost of operations and maintenance is factored in. This analysis is very easy to assemble; most equipment vendors and contractors are able to produce it.


When doing performance-based energy upgrades, the contractor will most likely promote a more efficient system that may have a higher first cost because of superior return on investment and cash flow impact. An energy project analysis that does not study the long-term operating and maintenance aspects of the improvement may very well leave money on the table. It makes good business sense to look at the project both ways, even if the final decision is to go with lower initial cost.


Because energy upgrade projects don’t happen often, it is worthwhile to consider getting an experienced outside firm involved.


A long-term perspective is also important in preparing an upgrade strategy to present to the finance department. A long-term outlook might help prevent this all-too-familiar refrain: “I did a large lighting retrofit project last year that produced great results — now if I could only get management to approve fixing my boilers, chillers, HVAC or control problems. I wish they had returns like the lighting project.”


Many energy upgrade projects focus strictly on lighting. While this approach certainly will result in a winning project, many times a great opportunity is lost because the lighting initiative isn’t integrated with other energy upgrade projects. The facility executive should consider bundling the lighting upgrade with other measures and build a larger project.



One reason this integrated approach isn’t taken, say many facility executives, is that management won’t approve more money for the other projects. But companies are sometimes willing to expand the budget if a good plan is presented with the budget ramifications for bundling, or if both a capital and performance-based budget are presented. Facility executives who do lighting work as a stand alone and then undertake other energy upgrades afterwards risk being seen by the financial side of the organization as a constant drain on capital reserves or budgets.


Control and Monitoring

When energy upgrades are not monitored and tracked, the initial savings often dwindle over time. In most cases, it’s a combination of small things: temperature set points that are overridden and never reset, or lights that are left on longer. But whatever the causes, the end results are too often the same: The absence of a verification mechanism and lack of interest in validating economies means that costs creep up.


The control and automation system in place is the most effective process for validating and monitoring performance. But that system has an even more important role: turning things off.


In simple terms, a control system comprises two types of points. Monitoring points — inputs — supply critical information regarding status and values associated with measurements; control points — outputs — signal the on-off mechanism of devices. The best way to save energy is to turn things off: shutting off lights when no one is in the room, for example, or turning air handling equipment off at proper times. While there will always be more inputs than outputs, it is important to make sure that there are enough outputs. As a rule of thumb, if less than 25 percent of the points are outputs, it’s worth taking a close look at the whole proposal to assure that it is really capable of producing significant savings.


Reshaping Perceptions

A successful energy upgrade project can bring benefits beyond energy savings. One of those benefits can be a change in the way the facility department is perceived by top management.


More and more, the facility department is expected to be a business unit as opposed to a service unit. That seems completely appropriate, given the range of contributions the facility can make to the bottom line. No matter what the title, the time has clearly come for the facility executive to be part of the top management team. But the facility executive has to take the initiative. An energy upgrade is a good place to start.




Julian Arhire is a Manager with http://DtiCorp.com – http://DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Monday, November 21, 2011

Elevating The Facility Manager To The Role Of Asset Manager

The past practice of reacting to emergencies, breakages, and anecdotal information is being replaced with proven capital planning business solutions. A new strategic approach integrates high quality defensible data, rational allocation methodologies, and enterprise-level decision support software, which not only addresses the physical conditions of facilities, but also the suitability of the building portfolio to support the organization’s mission.


Removing old barriers


Historically, the profession of FM was hindered by inconsistent practices and faulty data. No method existed to establish a baseline of current facilities issues, whether physical conditions or functional and programmatic needs. The professionals recommended repairs, demolitions, and new construction projects based simply on the severity of the current crisis and the availability of funds. Analysis was based on crude, over-simplistic data or the relatively limited experience of the professional compiling the information. Inconsistent facility condition assessment methods and multiple building types or locations combined to create erroneous data and poor decision-making that negatively impacted the credibility of FMs. Assessment methods varied greatly from one consultant to the next. Even individuals working at the same consulting firm often had no established criteria to ensure consistency in assessment results.


Lacking sophisticated tools and analysis methods, the professional development of many in the facility management field was inherently limited. Attempts at capital planning were flawed. FMs were forced into the cycle of build-neglect-rebuild, which was costly in terms of their career advancement as well as to the company’s net earnings.



A new era in facility management


In the past several years, substantial strides were made to further the facility management profession and establish both its credibility and its critical role in capital planning within organizations. One development that sparked a significant shift in the professionalism of facility management is the industry‘s move toward a more thorough understanding of capital planning and assessment methodology.


Developing and demonstrating scenarios that visualize the impact of various programs and budgets begins to attract the attention of senior management and key constituencies. Best-practice, based on advanced methodologies, assures a baseline foundation of indisputable facts, including accurate and defensible facility condition information and cost data. FMs are now empowered with metrics, such as the Facility Condition Index (FCI), which begin to define targets and create benchmarks for building readiness. As a description of the building, FCI requires detailed cost data and transcends the traditionally used qualifiers of “good” and “poor” to provide a quantitative benchmark or metric.


An equally important development in the practice of management is the growing role technology plays in enabling capital planning scenarios and reliably forecasting future requirements. Today’s fully web architected applications gather and maintain a repository of building information, estimate costs related to building renewal and replacement, and develop various budgeting scenarios.


Capital Planning and Management Solutions (CPMS) enables CEOs, CFOs, FMs, and stewards of large building portfolios to manage their portfolios proactively over time. CPMS provides the enterprise-level tools to track needs, calculate costs, create budgets, and group remedial projects optimally.



Role of certification


Many professional organizations are focused on helping FMs develop the skills and the underlying knowledge needed for success. The International Facility Management Association (IFMA) sponsors several professional development opportunities and manages a certification program that fosters continued learning and skill development across a spectrum of relevant topics. IFMA certification tests are offered in several languages and the credentials are honored in several countries around the world. Competency areas covered by IFMA’s certification include finance, project management, quality assessment, technology, real estate, and communication.



The management requires a very good organizational mind, a strong sense of commitment to the organization and its mission, and an understanding of what you need to do to achieve success.


The professional development is the only way to ensure that FMs maintain the wide knowledge base necessary to make difficult decisions. And in an era where building and safety codes are constantly being revised, where technology changes rapidly, and outsourced experts are relied on in greater frequency, certification is growing in importance.


Another organization pushing the facility management industry toward greater heights is the Association of Higher Education Facilities Officers (APPA), which has introduced its Strategic Assessment Model to its membership. Based on two commonly accepted models of continuous improvement in higher education, APPA’s Strategic Assessment Model provides FMs with the foundation to begin developing long-range strategic plans and creating the related action items that will enable FMs to take a leadership role in driving their organizations toward greater excellence.


VFA’s Facilities/Infrastructure Certification Program (F/ICP) transfers proven, scalable facility condition assessment methodology to both facilities owners and third-party architectural and engineering firms in a controlled manner. The program trains facilities professionals on the tools necessary to work in today’s information-based and technology enhanced environment. F/ICP provides a higher level of flexibility to large portfolio owners such as school districts, government, and large corporations, by allowing an optimal combination of third-party consultants and in-house staff to gather and work with key data. By using certified professionals for facility assessments, an organization is assured consistent core information from which to validate capital planning initiatives and project future requirements.



Certification programs were recently adopted by many organizations, thus demonstrating the importance of comparative, accurate data to the overall success of their extensive facilities capital planning process.


Empowering facilities executives with functional knowledge of CPMS expands the opportunity for everyone involved in facilities management from third-party architectural and engineering firms to talented in-house staff who want to extend the value they deliver to their organizations.


Training to raise the level of expertise


For many facilities management divisions, learning to speak in a sophisticated vocabulary that is equally meaningful to budget makers, maintenance supervisors, and top executives is key to gaining professional credibility. FMs have been left behind in budget negotiations because they often lacked the vocabulary or the data to back up their claims and budget requests.


We are all being asked to do more with less. The people in an organization who actually accomplish that will prove their value to others in an organization. For those folks, professional development is a very cost-effective way of meeting those goals.



Most importantly, working with professionals who have completed the Facilities/Infrastructure Certification Program ensures that assessments are performed accurately and the resulting data is consistent across the board. This is a tall order, given the extraordinary mix of experience and expertise of many district managers, and the involvement of several different third-party firms. Without the strong foundation the training provides, it’s conceivable that the results of any audit would vary widely from district to district or vendor to vendor. Even single-vendor assessments, which may promise consistency, can vary in quality if outmoded methods and assumptions are employed.


We are trying to give facilities managers hard data with which to go to the budget table. There is a heavy emphasis on standardizing facility assessments. We are raising the level of interest and expertise raising the standards of the profession of facility management.


FMs must look beyond day-to-day building needs and invest in their own careers and professional growth. Certified facility management professionals support life-cycle management practices that improve productivity, maximize the use of properties, and increase their organization’s return on investments. Certification programs extend the common-knowledge base that FMs share and enhance data integrity, validating the long-term capital planning process by empowering FMs with consistent, quality information. Ultimately, certified facility management professionals have the necessary knowledge to communicate with budget makers and senior executives in their organizations to successfully support the mission of the institution.




Julian Arhire is a Manager with DtiCorp.com – DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Tuesday, August 16, 2011

8 Better Ways To Cut Costs In Business

As food for thought, consider the following eight tips for reducing expenses, offered by business specialists from around the nation:

1. Watch that inventory. Supply and demand isn't important only in product or service pricing. It's also critical when it comes to inventory levels. Nothing kills profit like ordering more than you need. One option is inventory-tracking software, which can do the job for you automatically.

2. Don't take financial statements for granted. On a regular basis, review your company's accounts receivable, accounts payable, phone bills, and bank and charge account statements. You might be surprised at what you find, such as simple clerical errors that can add up.

3. Modify marketing. Getting the word out, of course, is important. Yet, the cost-effectiveness of that marketing must be periodically evaluated. And don't just take the word of a sales rep. Do some research yourself. There also are no-cost promotional activities that warrant consideration, such as cultivating local/regional media contacts.

4. Try partnerships. Chances are, your company isn't the only one with a limited budget for things such as promotions. So find a company with similar needs and forge a partnership that will benefit both parties. Local business associations are a fertile ground for those types of relationships.

5. Conduct salary surveys. Just maybe, you are paying your employees too little, which means they continually leave, resulting in the expenses of hiring new workers. At least annually, scan your industry to see where you stand. Paying a fair rate, or even slightly higher, could save you money in the long run.

6. Outsource work. Free employees from mundane tasks. This can be achieved by reviewing employees' secondary duties for tasks that can be completed by temporary help. This could include payroll, updating Web sites and other jobs that perhaps can be done more efficiently by someone else.

7. Offer profit sharing. This might cost the company some money initially, but workers will learn to care more about a company's bottom line. If the company makes more money, they make more money. The incentive to save money becomes greater when your own pocket is affected.

8. Forget about 411. Replace the idea of dialing directory assistance with the requirement to instead use a phone directory. The directories are free and can be obtained for frequently called areas. The point here is that although directory-assistance charges, like other "small" expenditures around the office, don't amount to much by themselves, collectively their costs are significant. Again, a penny saved is a penny earned.



Julian Arhire is a Manager with DtiCorp.com - DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Thursday, August 4, 2011

Success Of The Office Place Revolution

Teaming has been applied to everything from the formation of strategic alliances to the creation of facilities designed specifically to help reduce product cycles and bring goods to market faster. Reducing the product cycle has obvious corporate benefits since the cost of development is reduced. A major pharmaceutical company notes that every day that can be saved in getting a drug on the market saves the corporation $60 million dollars in operating expenses.

Corporations are also using teams to create learning organizations. When we work with others and open ourselves up to a variety of viewpoints and ideas, we learn from one another. The mutual interdependence required of team structures promotes a natural give and take of ideas, methods and processes, promoting an environment for an exchange of knowledge and understanding.

Statistics support the benefits of teaming. A recent survey of corporate managers found that 76% felt teams improved employee morale and 62% said teams improved management morale. As many as 80% thought teams contributed to increased profits, while 90% felt that teams improved the quality of the product or service. Significantly, 81% of those surveyed believed that teams contributed to improved productivity.

Team Types

A team is defined by Webster as "a group of people formed around a common goal" and possessing three attributes: a purpose (defined goal); a duration (a pre-conceived notion of how long the team will exist); and membership (a sense of belonging). Although many groups traditionally have a purpose and membership, the key to defining a team is duration. Without duration, the necessity to work interdependently loses priority.

Today's corporation may have many different types of teams, each varied in organizational structure, membership and tangibility. We can identify certain attributes that allow us to categorize teams into generalized groupings. These are sequential, matrixed and enabled.

A sequential team is linear in nature. The team members work on a process and each person works on one part of the whole. In many situations, team members are cross-trained and switch roles during the week. However, the entire process requires information to be "handed-off" in a sequential manner.

The matrixed team consists of members who belong primarily to another department or group but join forces at defined moments to accomplish a specified task. The key identifiers of matrixed teams are that they are cross-functional, multi-disciplinary and typically decentralized when not meeting as a team. They are most evident in organizations that have undergone reorganization or re-engineering to create what is often referred to as product lines or service lines of business.

The third distinct team formation is the enabled team. This team, like the matrixed team, is multidisciplinary but possesses a greater intensity. The enabled team member is almost always co-located (within the department and in the defined team space) and may be recognized more within the organization as a member of the team than as a component of his or her discipline. The focus is primarily to get a given task accomplished utilizing the best of the combined brain power on the team.

Organizations today are made up of combinations of these teams, which are created and aligned in accordance with staffing resources and business needs-the primary goal being to make the most of the collective brain power available. For this reason, team structures, in terms of both people and place, are elastic. Effective core team size does have boundaries, however. Research indicates that the ideal team size is eight people for the most effective communication and interaction to take place. Four to six-person teams are seen as the most efficient and 10 to 12-person teams have been shown to represent the high-end of any productive spectrum.

Physical Environment

If a team is viewed as an entity of collaboration, learning and increased communication among a group of empowered individuals, then the team must be together in a common physical setting. A live meeting is still the most effective way to communicate and engage in problem-solving and the physical environment will be a manifestation of the team members' need to be together.

The environment must be designed to foster interaction. Although we cannot design a space that guarantees team members will develop the best and brightest ideas, we can influence a pattern of experiences over time, therefore increasing the possibility that new ideas or connections will occur to people who can do something with them that becomes productive. Through provisions such as punctuated corridors, carefully placed casual meeting areas and magnet amenities like coffee pantries and reference areas, the physical layout of the team space can promote opportunities for chance meetings.

Variety is a key to designing the team area, to support a variety of work styles and structures. Workspaces should be both enclosed and open to accommodate quiet thinking time as well as opportunities for communication during more ordinary task functions. They may be a combination of dedicated areas for permanent residents and hoteling or shared spaces for more transient team members. Workspaces also need to be supported by multifunctional and specialty areas, such as war rooms and project rooms.

Team communication relies on the visual information members exchange with one another, a need referred as "displayed thinking". By displaying both individual and team ideas, a message is sent that concepts are acknowledged and under discussion. Displayed thinking not only airs the message within the team but advertises the team's purpose to the rest of the organization.

In concert to the need for displayed thinking, there is also a need for boundary management, the physical and social demarcation between the group and the organization. In our communities we know these as neighborhoods. These boundaries help to define team ownership and communicate to the rest the organization the value of the team structure. A team space that is surrounded by high walled elements, demarcated by ceiling soffits or flooring and highlighted through signage and reception cues is much easier for everyone to define than an arrangement of continuous open plan workstations.

In addition to information type, the size of the team may have a direct correlation to the amount of enclosure required. Work with many organizations has revealed that open area meeting spaces function best when groups meeting within them number four persons or less. Greater numbers seem to cause distraction to those occupying space around the team area; consequently team members meeting in those spaces do not feel they have as much freedom to communicate freely.

Above all, flexibility is one of the most important attributes. Users need to be able to adapt the environment to the needs they have at the moment. This isn't just a meeting, it's a team and this team is rewriting the rules of the game on a daily basis. Issues in flexibility range from designing buildings with large grid sizes, column-free space and adequate telecommunications data infrastructure to having the ability to just pick up and move the furniture.

Conclusion

At some point, we will all work in teams because there is value to interacting with each other and with our clients, because we are more productive and creative, and because, quite possibly, we like it! By acknowledging that teamspace is different from traditional workspace, we can recognize different team types within our organization, create environments that nourish teamwork and support this "new yet old" way of working.



Julian Arhire is a Manager with DtiCorp.com - DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Thursday, July 14, 2011

What Does Internet-Enabled Mean To The Average Construction Professional?

Expanding your usage of Internet tools, like intranets, will bring your business new opportunities to work smarter, and in certain cases, generate new revenue streams.

Is it something that must be provided for and demanded from software providers?

Not necessarily. Software providers can pre-package solutions only within certain parameters. Three parameters that stand out are value, scope and time.

The first parameter, the perception of value, means if you can get Internet software for free that is developed for the masses, will a vertical market like the AEC (architecture, engineering, and construction) industry be willing to pay for AEC focused Internet tools? This is a tough question for software providers to answer as the perception in the AEC market is that Internet software should remain free, no matter what the added value. Large software vendors like are addressing this issue by integrating Internet technologies within their traditional software offerings. As for fully developed solutions that you can purchase off the shelf, they do not exist yet.

Internet technologies are not just about software. So software providers that claim total solutions are not telling the entire story. The second, and more important element, of integrating Internet technologies within your business is Cultural. The ease of use and low initial cost of implementation make the cultural shift into the Information Age (aka: Internet-enabled) an easier shift than any previous Information Technology phase we have gone through as an industry. But just because it's easier, does not mean that it's without its difficulties. Getting your business to adopt to performing their traditional jobs electronically can be a daunting task. Add into the issues that the majority of AEC work is performed remotely outside the office, and you have a huge challenge.

Another parameter is scope. The Internet and its associated technologies are best implemented when you combine business goals (ie: communicating more effectively to the field) with the proper level of technology (ie: an Internet connection to the field). This brings a difficult level of detail to the software vendors. If there is no one way that all businesses perform tasks, than how do you write computer code to handle all possible scenarios? The Internet allows you to quickly and easily perform functions of your job without the need for proprietary software. But it does make sense that certain tasks, like CAD production, become Internet-enabled by your existing software.

An additional parameter is time. If Internet technologies change on the average of every 12 weeks, how can an established software vendor react to the changing technologies in a timely manner. Getting AEC-specific Internet products to market is a major hurdle that our existing AEC software manufacturers are struggling with. One solution that is being considered is software distribution over the Internet as a download. The complex issues of traditional software and other software team members will have to be addressed before this means of getting tools to the AEC community can be addressed in earnest.
Are there different levels of Internet-enabled that a contractor should look for?

There are three distinct levels of Internet-enabled that a contractor can benchmark themselves to.

One: Computer-Aided Business

Our industry began its integration of Information technology by embracing computers to automate manual tasks. We began to use computers to write letters, compose specifications, electronically draft through Computer Assisted Drafting (CAD) and numerous other tasks that we used to do manually. This period of technology expansion has been known as Computer-Aided Business. While a necessary first period of evolution, the Computer-Aided Business model has limitations. During this period, individual's create digital information available to only themselves on individual computers. This has lead to "Islands of Automation" within our business environment. In the Internet environment, this can be related to a company putting up a Website that acts as an electronic brochure.

Two: Computer Integrated Business

The next evolutionary step can be called connections. We bring our "Island's of Automation" together by allowing computers to communicate with each other through computer networks. By connecting our different computer hardware, different software programs, and different locations, we pull together a collective knowledge that we could not have had using traditional methods. We are beginning to see computer integration's infinite power and value by connecting different locations through the Internet. As we, and the technology, mature through time we ask the technology to perform tasks that can not be accomplished manually. Technology brings with it new ideas and thoughts on how we can perform our tasks more productively and efficiently. As we become more comfortable with technology, we allow it to integrate into our businesses. We begin to utilize the potential of technology beyond traditional methods. This period of growth is known as Computer Integrated Business. No longer are we held captive to traditional manual solutions to problems within our business. We begin to expect that the technology will provide a solution.

Three: Information Based Business

The final phase is when technology becomes transparent to the business. During this period, it's no longer a strategic competitive advantage to have the latest and greatest computer hardware and software. It's expected as a natural fact. The use of technology and information during this phase becomes as transparent and factual as the four walls that define the office. This final goal is known as the Information Based Business. The simplification of hardware, software and connectivity brings to you and your business the true power of information technology in a cost and time effective way. Applied technologies such as Intranets and Extranets are the forerunners of this concept. Web-enabled Construction Documents are an outgrowth of this concept. The implications of "live" specifications and drawings by linking information in your computer, on your network and on the Internet are already being utilized by firms worldwide. Implementation of Virtual Private Networks (VPN's), Virtual Job Trailer's and Electronic Plan Rooms are also the results of an Information Based Business.

What industry trends will make the use of Internet-like media critical to the majority of the construction profession?

The integration and coordination of distributed, digital project information is one of the great challenges to our industry. This has been exacerbated by the growing use of the design/build method of project delivery where timely information is critical to the overall success of the project and its team. The Internet brings a cost-effective and powerful solution to every person on the project team, no matter what level of computer-literacy one may have.

Just competition?

Competition is always a driver to adoption of concepts into action. Of course, if your main competition has found a competitive advantage by using Internet technologies, you will adopt these technologies yourself. But a more important driver is Internet usage as a requirement by owners and clients.

Owner/operator involvement?

A remarkable trend that has come to the forefront in the past few years are the announcements from major corporate clients that knowledge of how to use the Internet is now considered a requirement to continue to do business with them.

The only team member that will directly benefit from implementing Internet technologies on a project is the owner. The time saved by using these technologies directly affects the overall production of the building. In other words, the quicker the owner can occupy the building, the more aggressively the solution will be implemented. The different ways you can implement Internet technologies within your own business will be the differentiating factor between you and your competition.

What are the limitations of the Internet today and how will those be resolved in the near future?

Two major limitations are perception of The Internet's capabilities and bandwidth.

Too much hype and not enough AEC business adaptation have hurt the image of the Internet. Having a Website doe not guarantee business growth. Only through a carefully planned strategic Internet/Information Technology plan can a business hope to leverage the power of the Internet. It will not be leveraged by "Brochure-ware" Web sites, but by implementation into the everyday process of each AEC business. This problem is being addressed and led by owner/clients who are requiring these technologies, just to remain doing business with them. It's remarkable how fast a technology will be adopted and cultural issues go away when a client requires a technology.

What are some other ideas regarding the implementation of the Internet?

There are 10 powerful emerging trends on our industry that the Internet is having a direct effect:

1. Client IT Demands/ Project Extranets
2. Value Migration
3. Construction Information Management (CIM): Systems Integration
4. Powerful Remote Devices
5. Paper Is Not Going Away
6. Virtual Private Networks
7. Architectural Information Systems (IS) as Profit Centers
8. IP Addressable Objects
9. Franchised AEC Service & Information Centers
10. Wireless access



Julian Arhire is a Manager with DtiCorp.com - DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Thursday, July 7, 2011

For Facility Executives, The Bottom Line Can’t Be Measured Only In Dollars And Cents

When it comes to the bottom line, there are two ways that organizations can look at the facilities they occupy. The traditional approach is to see facilities as a cost. This focus on the inputs to a business process leads naturally to cost control and expense cuts as organizations strive to reduce expenditures, cut staff, economize and minimize. Many real estate and facility executives report that their organizational culture and priorities drive them to this exclusive focus on cost containment.

But there is another way of looking at facilities, and it gets back to the reason organizations have buildings in the first place: to get work done as efficiently and effectively as possible. Seen from this perspective, the facility can have a positive bottom-line impact by helping improve employee productivity.

We might call the older approach an input-oriented perspective: Corporate real estate and facility executives are simply suppliers of workplaces, providing complex products - buildings, furnishings, technology - and services. These executives have little direct concern about the ultimate impact of their products and services on the organization as a whole.

Contrast that worldview with a newer outlook - output-oriented, if you will. These facilities organizations focus on helping the core business to be more effective and competitive by helping employees to be more productive. To them, the buildings, with their furnishings and support services, are means, not ends. Economy, efficiency and skillful management of physical assets are still necessary, but will no longer suffice. These workplace service providers are committed to outcomes such as improved productivity, rather than inputs such as desks and chairs. Top priority goes to meeting the needs of the occupants, by adding value to core business processes, and responding to changes in the core business workforce, all to best contribute to organizational success.

Top facility executives have only recently started to think about how to increase the added value to the primary process, or core business, of their organization. These executives realize that they must not only address the issues of cost control and income, but also must develop and implement a strategy to support the core business.

What kinds of facility and real estate departments seem to be focusing most on productivity? Interestingly, the move toward productivity generally began in centralized facilities and real estate departments, not departments that are part of individual business units. That's the opposite of what one would have expected: Decentralized departments should, in theory, be closer to their customers and have a better sense of the real needs of the organization. But, in reality, these executives typically focused on cutting costs or on increasing the value of the real estate portfolio.

By contrast, adding value to the core business, or optimizing the core business, became a top priority for a surprising number of centralized facility and real estate departments. This was true even though, in traditional corporate organizations, the central units are the least integrated with specific processes of the business units.

Why did this role reversal happen? Perhaps because the centralized departments saw that their internal customers - the core business units - might decide at some point to buy workplace services and support direct from the marketplace, i.e. not from or through an in-house facilities department. That meant the facilities department had to see itself as competing with firms already in the marketplace - powerful discipline to focus on the customer.

In any case, over the last few years, there have been signs that the decentralized departments have also begun to focus on productivity. To the extent that this trend continues, decentralized departments should be well-positioned to add significant value to their organizations.

Of course, not all organizations - centralized or decentralized - walk the talk when it comes to management priorities. Some do indeed give first priority to serving occupants; for years their management has been building this perspective into their group culture. For the rest, the focus on the customer is the destination, but not yet the achievement, at the hands-on staff levels.

Satisfaction Plus Delight

Adding value to the core business includes meeting the needs of work processes as well as of people; it also includes going beyond what is recognized as necessary and is explicitly asked for. Economy and efficiency are of course necessary but not sufficient. This is periodically confirmed by an ongoing survey of true facility end-users: hundreds of thousands of occupants of facilities provided by the U.S. General Services Administration's Public Buildings Service. The survey has found that good service and good technical performance are expected, even taken for granted. They only become an issue for occupants if significant deficiencies exist.

PBS established a goal of increasing customer satisfaction to a specified level. It found from the survey that a huge increase in effort to upgrade basic technical performance, such as HVAC or cleaning, in thousands of smaller buildings would not bring occupant satisfaction up to target. Nationally, the top driver of overall satisfaction was "responsiveness with regard to procedures for obtaining services" and that was more of an issue in large buildings than small.

The added value, expressed as delight, comes when workplace innovations make it easier for people to do the new necessary tasks that are being invented at the same time. Workplace changes must keep pace with changes in work processes and people while respecting the workers' priorities for quality of life.

Integrating Facilities

To be fully effective, workplace improvements need to be integrated with appropriate technology and work processes. As time goes on, the management of workplaces will be integrated into the management of business processes. Consider the history of corporate management information systems (MIS) over the last two decades. MIS was once a stand-alone department. CEOs relied on their MIS managers to oversee the corporate computerized business systems and the mainframe hardware on which they ran. Business units and headquarters each identified information technology (IT) requirements and relied on the MIS department to develop application programs and deliver information. CEOs and line managers delegated to the MIS people the role of identifying needed IT investments and of recommending priorities in MIS support for the business.

That is no longer good enough for companies that use IT to gain strategic advantage. IT has become a core element of their business plans. It can make viable a widespread empowerment of managers and staff by giving them access to the information they need for decision-making. It can be the core of new products and services. IT is integrated into almost every work process of retailers and petroleum, pharmaceutical, airline and trucking companies.

CEOs are recognizing that strategic management of IT is at the heart of companies' business processes. These processes, such as the order fulfillment cycle or the product delivery process, bridge divisions or departments of the organization. Today, some CEOs are former senior executives of MIS, and many have sufficient expertise to manage IT as an integral part of their role. Further, they are distributing IT expertise and leadership in support of business processes instead of delegating IT responsibilities to a central, separate support group.

As IT becomes pervasive, it enables a transformation of the workplace. Much work that a decade ago could only be done on corporate or government premises has become location-independent. New processes made practicable by IT happen in places chosen for convenience of the buyer, not the seller. For instance, making a bank deposit or transfer was once done by going to a branch bank or mailing paper to the bank; now it is done by the customer, whether at an ATM in a shopping mall or on the street, over the telephone, or from a desktop computer in the customer's office or a notebook computer anywhere.

As with IT a decade ago, workplaces are starting to become an identified component of business competitiveness. They are becoming key to emerging business processes. To some companies, the automobile has already graduated from a transportation vehicle to a primary workplace. A field engineer who has the tools to operate anywhere, anytime, may need an office desk, not a private, permanent office. Indeed, small cubicles in an open-plan office might be shared among several engineers on a part time, as-needed basis.

The corporate paradigm is shifting from command-and-control hierarchies to teams that drive processes. Expertise in providing and supporting workplace facilities and services will be a necessary and accepted component of those teams, as today's CEOs recognize the corporate advantage in their interconnected information processes.