Elevating The Facility Manager To The Role Of Asset Manager

The past practice of reacting to emergencies, breakages, and anecdotal information is being replaced with proven capital planning business solutions. A new strategic approach integrates high quality defensible data, rational allocation methodologies, and enterprise-level decision support software, which not only addresses the physical conditions of facilities, but also the suitability of the building portfolio to support the organization’s mission.


Removing old barriers


Historically, the profession of FM was hindered by inconsistent practices and faulty data. No method existed to establish a baseline of current facilities issues, whether physical conditions or functional and programmatic needs. The professionals recommended repairs, demolitions, and new construction projects based simply on the severity of the current crisis and the availability of funds. Analysis was based on crude, over-simplistic data or the relatively limited experience of the professional compiling the information. Inconsistent facility condition assessment methods and multiple building types or locations combined to create erroneous data and poor decision-making that negatively impacted the credibility of FMs. Assessment methods varied greatly from one consultant to the next. Even individuals working at the same consulting firm often had no established criteria to ensure consistency in assessment results.


Lacking sophisticated tools and analysis methods, the professional development of many in the facility management field was inherently limited. Attempts at capital planning were flawed. FMs were forced into the cycle of build-neglect-rebuild, which was costly in terms of their career advancement as well as to the company’s net earnings.



A new era in facility management


In the past several years, substantial strides were made to further the facility management profession and establish both its credibility and its critical role in capital planning within organizations. One development that sparked a significant shift in the professionalism of facility management is the industry‘s move toward a more thorough understanding of capital planning and assessment methodology.


Developing and demonstrating scenarios that visualize the impact of various programs and budgets begins to attract the attention of senior management and key constituencies. Best-practice, based on advanced methodologies, assures a baseline foundation of indisputable facts, including accurate and defensible facility condition information and cost data. FMs are now empowered with metrics, such as the Facility Condition Index (FCI), which begin to define targets and create benchmarks for building readiness. As a description of the building, FCI requires detailed cost data and transcends the traditionally used qualifiers of “good” and “poor” to provide a quantitative benchmark or metric.


An equally important development in the practice of management is the growing role technology plays in enabling capital planning scenarios and reliably forecasting future requirements. Today’s fully web architected applications gather and maintain a repository of building information, estimate costs related to building renewal and replacement, and develop various budgeting scenarios.


Capital Planning and Management Solutions (CPMS) enables CEOs, CFOs, FMs, and stewards of large building portfolios to manage their portfolios proactively over time. CPMS provides the enterprise-level tools to track needs, calculate costs, create budgets, and group remedial projects optimally.



Role of certification


Many professional organizations are focused on helping FMs develop the skills and the underlying knowledge needed for success. The International Facility Management Association (IFMA) sponsors several professional development opportunities and manages a certification program that fosters continued learning and skill development across a spectrum of relevant topics. IFMA certification tests are offered in several languages and the credentials are honored in several countries around the world. Competency areas covered by IFMA’s certification include finance, project management, quality assessment, technology, real estate, and communication.



The management requires a very good organizational mind, a strong sense of commitment to the organization and its mission, and an understanding of what you need to do to achieve success.


The professional development is the only way to ensure that FMs maintain the wide knowledge base necessary to make difficult decisions. And in an era where building and safety codes are constantly being revised, where technology changes rapidly, and outsourced experts are relied on in greater frequency, certification is growing in importance.


Another organization pushing the facility management industry toward greater heights is the Association of Higher Education Facilities Officers (APPA), which has introduced its Strategic Assessment Model to its membership. Based on two commonly accepted models of continuous improvement in higher education, APPA’s Strategic Assessment Model provides FMs with the foundation to begin developing long-range strategic plans and creating the related action items that will enable FMs to take a leadership role in driving their organizations toward greater excellence.


VFA’s Facilities/Infrastructure Certification Program (F/ICP) transfers proven, scalable facility condition assessment methodology to both facilities owners and third-party architectural and engineering firms in a controlled manner. The program trains facilities professionals on the tools necessary to work in today’s information-based and technology enhanced environment. F/ICP provides a higher level of flexibility to large portfolio owners such as school districts, government, and large corporations, by allowing an optimal combination of third-party consultants and in-house staff to gather and work with key data. By using certified professionals for facility assessments, an organization is assured consistent core information from which to validate capital planning initiatives and project future requirements.



Certification programs were recently adopted by many organizations, thus demonstrating the importance of comparative, accurate data to the overall success of their extensive facilities capital planning process.


Empowering facilities executives with functional knowledge of CPMS expands the opportunity for everyone involved in facilities management from third-party architectural and engineering firms to talented in-house staff who want to extend the value they deliver to their organizations.


Training to raise the level of expertise


For many facilities management divisions, learning to speak in a sophisticated vocabulary that is equally meaningful to budget makers, maintenance supervisors, and top executives is key to gaining professional credibility. FMs have been left behind in budget negotiations because they often lacked the vocabulary or the data to back up their claims and budget requests.


We are all being asked to do more with less. The people in an organization who actually accomplish that will prove their value to others in an organization. For those folks, professional development is a very cost-effective way of meeting those goals.



Most importantly, working with professionals who have completed the Facilities/Infrastructure Certification Program ensures that assessments are performed accurately and the resulting data is consistent across the board. This is a tall order, given the extraordinary mix of experience and expertise of many district managers, and the involvement of several different third-party firms. Without the strong foundation the training provides, it’s conceivable that the results of any audit would vary widely from district to district or vendor to vendor. Even single-vendor assessments, which may promise consistency, can vary in quality if outmoded methods and assumptions are employed.


We are trying to give facilities managers hard data with which to go to the budget table. There is a heavy emphasis on standardizing facility assessments. We are raising the level of interest and expertise raising the standards of the profession of facility management.


FMs must look beyond day-to-day building needs and invest in their own careers and professional growth. Certified facility management professionals support life-cycle management practices that improve productivity, maximize the use of properties, and increase their organization’s return on investments. Certification programs extend the common-knowledge base that FMs share and enhance data integrity, validating the long-term capital planning process by empowering FMs with consistent, quality information. Ultimately, certified facility management professionals have the necessary knowledge to communicate with budget makers and senior executives in their organizations to successfully support the mission of the institution.




Julian Arhire is a Manager with DtiCorp.com – DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Tuesday, November 15, 2011

Home Automation: It Is Worth The Investment

In a recent survey, more than two-thirds of the 400 U.S. builders queried offer computer networking, structured wiring and central vacuum systems with their homes. Programmable thermostats, security systems and zoned HVAC (heating, ventilation, and air conditioning) systems top the list of most frequently offered products.


The signs about home automation are seemingly everywhere. Today’s home builders seek to include at least some advanced technology in their homes. As a result, programmable thermostats, security systems and zoned HVAC (heating, ventilation, and air conditioning) systems top the list of most frequently offered products. When considering which amenities are most important in selling a home, builders rate a large kitchen, spacious master bath and architectural elements the highest – with security systems and computer networking not far behind.


Technological capacity built into the developments even before actual home construction begins, so a digital lifestyle is assured for the eventual homeowner. Home automation has become all the rage. Initially, years ago, a smattering of builders began to focus on the digital infrastructure in homes by adding basic structured wiring and entertainment systems. Today, multi-room sound systems, computer networking and home automation have become must-have appliances, just like washers and dryers were decades ago. Increasingly, homeowners now want to be able to do more – program lights, control shades, monitor the front door, activate the sprinkler system, turn on the central vacuum and chlorinate the swimming pool – from anywhere in the house.



The trend toward increased home automation is spreading rapidly across the country, as homeowners become more aware of its benefits. Homeowner education has risen, and there’s greater awareness to consumer electronics. There is definitely a convergence happening among the different residential disciplines – meaning security, phone, cable TV, satellite, audio, home theater, home automation, personal computer networking. The origins of this technological trend can be traced to the existence of multiple PCs in the home. Essentially, this created the need for computer networking, with structured cabling as the foundation, which started the techno revolution in the home. The revolution is in full effect.


With structured cabling in place, a home entertainment server can direct many of the functions in a house, such as opening and closing draperies or shutters, and operating air conditioning/heating controls and smart appliances. Consumers are going to be demanding – just as you have plumbing and heating in your house, a structured cabling system is going to be a standard subsystem of the house.


In response to consumer demands, contractors are becoming savvier about the new installation and configuration sides of their business. The groundwork has to be laid in the home for all of the various bells and whistles. Once you start making consumers aware of some of the products and the things hey can do in their home, and once they realize the cost isn’t significant to at least pre-wire, they usually go for it.


Honeywell Thermostats for Home Automation


Honeywell International Inc.’s VisionPRO 8000 programmable thermostat has been lauded for its ease of operation and innovation. VisionPRO is the winner of the 2005 Building Technologies Product of the Year award, presented by global growth consulting firm Frost & Sullivan. Its design guides homeowners through the programming process with a user-friendly, on-screen menu and flashing touch screen, reducing the need for an owner’s manual. The product also features a 10-square-inch, clear touch screen display with easy-to-read current temperature, set temperature and current time programming. Back lighting makes the display even more readable in any lighting condition. In addition, a real-time clock maintains time during power failures and automatically updates for daylight savings, and universal compatibility enables configuration for use on virtually any application.

Wednesday, July 13, 2011

Benchmarking Energy Use And Management Opportunities

Before managers can develop a program to cut energy use, they must determine their facility's potential energy savings. One method of assessing that potential is to benchmark energy requirements against those of similar facilities. Before undertaking benchmarking, however, they must determine the energy use levels in their facility.

Determining energy use

Facilities use energy in a number of different forms. Managers should review energy use records and add them by fuel type for a one-year period. To determine total facility energy use, convert each annual fuel use total to its Btu equivalent, then add them up.

It is important to include all fuel - electricity, natural gas, propane and oil - in the calculations. Once the total energy use has been determined, managers should normalize it to allow for comparisons with use in other facilities.

Managers can use several techniques to compare facility energy use, but a widely accepted measure is the energy use index (EUI). The EUI, expressed in Btu per square foot per year, is the total energy use of a facility divided by its total occupied or conditioned square footage. Unconditioned spaces are generally excluded.

The EUI has drawbacks. It doesn't normalize energy use for climate changes. Also, the EUI doesn't account for variations in the use of similar facilities. For example, two office buildings may have different EUI values, due to different occupancy schedules. One may be occupied for 10 hours each day, while the other is occupied for 24 hours a day.

Benchmarking energy use

The key to successful benchmarking using the EUI is careful selection of facilities. There are two sources for benchmarking EUI data: published data and other maintenance managers.

There are a number of different sources for published EUI data, including government publications, trade association reports and energy management handbooks. One of the most comprehensive sources for such data is Commercial Buildings Energy Consumption and Expenditures from the U.S. the Department of Energy.

The publication lists average EUI values for a range of building types differentiated by such factors as age, size, climate, occupancy schedules, construction and energy source. By selecting the most appropriate building category from the data, maintenance managers can estimate their potential for energy savings in their facility.

Selecting conservation targets

Once a manager has determined a facility's energy savings potential, the next step is deciding on areas of focus. The key to successful reductions is concentrating efforts on areas that offer the greatest potential and highest rates of return on the investment. Once those measures are implemented, managers can look elsewhere. The greatest potential for greater energy efficiency in many facilities lies in the major energy-using systems: chillers, cooling towers, boilers and lights.

Lighting systems offer potential energy savings through changes in operations and maintenance. Before considering major lighting replacement or upgrade programs, though, make certain the existing system operates efficiently and effectively.

Tour the facility. In how many areas are lights left on when nobody is in the space? What controls are installed on lighting systems? If you find more than a few cases in which lights are operating in unoccupied spaces, consider installing automatic lighting controls, such as occupancy sensors. Energy savings achieved by automatic controls typically pay for their installation in one to two years.

Next, review fluorescent lighting system maintenance. In spite of the lower labor costs and higher efficiency associated with group relamping, many facilities continue to replace burnt out lamps on a spot basis. By group relamping when lamps reach 70-80 percent of rated life, labor costs are cut by 90 percent. Average lighting levels also improve, as lamps are replaced before light output has deteriorated.

Finally, consider the efficiency of light sources. Consider replacing incandescent bulbs with fluorescent or compact fluorescent lamps. Upgrade standard fluorescent lamps to lamps with high-efficiency electronic ballasts.

Managers continue the efforts by examining maintenance records for other primary energy-using systems:

• When were they installed?


• Have they experienced significant maintenance problems?

• Do boilers, cooling towers and chillers have an effective water treatment program?

• Are chillers opened every one-two years for inspection/cleaning?

• How often are cooling towers inspected and cleaned?

• Are boilers inspected and cleaned annually?

If maintenance has been deferred for even a few years, large potential energy savings lie in performing required maintenance. The systems may be operating, but not operating efficiently unless maintenance tasks are performed regularly.

Before looking into replacing units with higher-efficiency models or installing energy-efficient controls or variable frequency drives, make sure in-place systems operate efficiently. If existing systems are not properly maintained, the same can happen to new systems.

Replacements and upgrades

Additional savings can be found upgrading or replacing systems with new technology. Direct digital controls, variable-speed drives and automatic combustion controls all can be retrofit to provide additional energy savings, provided existing systems operate efficiently.

In some cases, to gain major energy efficiency improvements, systems must be replaced. If systems are approaching the end of performance life or if they cause major maintenance problems, it may be more cost-effective to replace them than to overhaul them.

Whatever systems are installed today to improve energy efficiency, however, must be properly maintained or efficiency improvements will rapidly disappear.

For managers to deliver energy efficiency gains, they need a program that identifies opportunities for improving performance through proper maintenance of energy-using systems, application of new technologies to existing systems and replacement of inefficient systems with new, high-efficiency ones. By following these steps, managers can make their facilities benchmarks for others.


Julian Arhire is a Manager with DtiCorp.com - DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Tuesday, July 5, 2011

HVAC Improvements For Existing Buildings – HVAC Retrofits

One way to identify tenant needs in existing buildings is to note what architects and designers are trying to create for clients in new buildings. The objective for a new building is to provide the ideal office space. Tenants are often looking for space that can address such issues as flexibility, modular space planning, environmental considerations and individual temperature comfort. A particular hot spot for many national tenants is to gain the highest level of productivity from their employees. This usually means the building will need plenty of HVAC zones, flexible office hours and point-of-use supplemental systems. These factors point to a flexible and often programmable HVAC system that can meet tenants' needs.

Architectural trends can also create new loads and requirements for an HVAC system in an existing facility. More natural light can increase heat loads; atrium designs can obstruct air distribution; additional zones can increase the overall volume of ventilated air needed, the quantity of heat to be rejected and the amount of outdoor air required. If a building doesn't have a flexible HVAC plant, then modifications or upgrades to the HVAC system will be necessary to compete with new building design and technology.

One factor that must be considered in any analysis of a possible retrofit is that an HVAC upgrade usually means that the building has to be brought into compliance with current codes. Some codes are based on prescriptive regulations; however, the trend to create a safer and healthier indoor environment can also bring new performance requirements. For example, over time, the percentage of outdoor air has gradually been increased, and current requirements may call for more outdoor air than many buildings have the capacity to condition. Bringing the building up to code may require a significant investment in upgrades beyond those originally planned.

Making Retrofit Decisions

HVAC systems are major energy users, and new HVAC technology is far more efficient than 15 to 20-year-old systems in place in buildings. In some cases, the energy savings alone are so substantial that they justify the upgrade investment. But in many commercial office buildings it can be difficult to justify an HVAC upgrade. Perhaps some upgrades have been performed over the years, reducing the energy savings now available. Or perhaps the owner has a too short a payback-period requirement for energy upgrades.

When energy savings alone do not clearly justify an upgrade, how does the facility executive responsible for a commercial office building determine whether and how to upgrade the HVAC system? It is best to start with the building profile. A relatively small or mid-sized building (less than 200,000 square feet) may present marketing opportunities not available to larger facilities. For instance, instead of converting a constant-volume system to variable-air-volume (VAV), it might be possible to make each floor a separate zone. The marketing plan could then be changed to focus on larger, whole-floor users with large bullpen work areas that do not require multi-zone improvements.

In a medium or large-sized building, upgrade options will depend more on the type of system already in place. If the base building system is a constant volume system, with the main fans delivering varied air temperatures to large sectors of the building, there isn't much choice. To serve the varied needs of today's tenants, the facility executive will need, at a minimum, to increase the zoning abilities. How this is accomplished depends on the building's design and business plan.

For example, new speculative office buildings sometimes install heat pumps, which can deliver heating or cooling to small or large zones, are easily programmable, and operate at about 50 cents a ton per hour. But is the first cost for installing heat pumps a good value for retrofits? Probably not if the building was configured as a constant-volume or multi-zone system. Using heat pumps would require running condenser piping throughout the building and changing the fresh air distribution; what's more, the actual conversion could not run parallel to the old system if this retrofit was attempted in the summer because the cooling tower would be reused.

In this case, options for conversion should be limited to a VAV conversion or to individual zone diffusing that does not reduce energy costs but does create comfort zones similar to VAV systems. VAV systems provide a constant temperature to the space, but the air volume varies with the comfort setting. If the building was constructed after 1975, it probably has some type of VAV system installed. The earlier systems did provide easy zone creation; however, after-hour and flexible operation were usually not part of the operating system.

The most difficult VAV retrofit decisions are the ones where the payback related to energy reduction has already been captured by vortex dampers or by the later addition of variable frequency drives. If the facility will not receive an initial influx of energy savings, HVAC retrofits will have to be justified based on increased flexibility, after-hour operation and supplemental cooling. The facility executive must spend the time necessary to understand the overall value to the asset from a marketing standpoint.

It is important that all values are considered when making the decision. More is involved than just the cost of energy. There will be other gains that are not so obvious. A new cooling tower or new chiller not only operates with less kilowatts per ton, it also has new heat transfer surfaces, better part-load abilities and generally reduces maintenance requirements. The amount of labor and maintenance required to service a temperamental HVAC system can be quite a surprise once it is segregated from general operating costs.

The facility executive must also look at the useful life of the existing system. Will there be parts available next year? Is there a service company that will be willing to support the system? If a decision is made to sell the building will the system be flagged as unserviceable? Can the system still be used when a big block of space comes up in two years? These are all questions to ask when a system is facing obsolescence and when reliability of building systems becomes a factor in the marketplace.

There are other building details that sophisticated tenants are aware of or will become aware of if they enlist a good tenant representative or broker. Consider a broker with a client that is considering an existing building over the brand-new building across the street. The potential tenant is concerned with the condition of the HVAC system and requests the following information:

• Is the ductwork and distribution system clean? Please offer some verification.


• How is the insulation attached? Is it interior or exterior fiberglass?

• Is sound batting provided?

• What is the zoning per terminal?

• What are the temperature setpoints of the zones? How many zones are in my space?

• What is the noise level of the terminals?

• Can we control the perimeter zones of the offices separately?

• Is there any asbestos on the HVAC system, piping or ceiling?

• How can I operate after hours and what is the cost per hour?

• If I want to add some additional servers, is there a tenant tower for condenser water?


• What are the watts per square foot and the cubic feet per minute of ventilation air?

• What am I guaranteed in the future?

• How will I be billed for use of my after-hour heating and cooling?

In the last few years, tenants have been even more concerned with the office IAQ (Indoor air quality) environment. The more important the staff is to the operation, the more concern for the users' welfare. Tenants are asking more questions like these:

• What is the outside air ratio?

• Where does the outside air for my area originate and can you achieve 100 percent economizing?

• Do you have a proactive plan for indoor air quality complaints?

• Do you allow smoking?

• Do you have pressurization, smoke tower, stairway pressurization or smoke exhaust system?


• Are there any negative air situations in this building and does any of the air come from infiltration?

• Is there any redundancy to the heating and cooling systems?

• What is the origin, quality and reliability of the electrical service supplying the building HVAC system?

Competing for Tenants

Potential tenants may also want to see the property's preventive/predictive maintenance program, or to review the energy or computerized maintenance program to determine what occurs when the building operates outside its design parameters. This is when a facility executive must know the market. Can the property afford not to retrofit? Very often an energy payback exercise will show the project being way off the owner's target. But the analysis must also take into account lease-up value, tenant retention, cash flow and ultimately overall asset value. If a property is competing with a state-of-the-art VAV building with lower operating costs and greater flexibility, where are the tenants most likely to go?

In a landlord's market, a building with an outdated HVAC system may do all right. In a tight market, with a lot of available space, that property may either have to reduce rent, offer concessions or decide to give tenants what they really want: An HVAC system that is flexible, usable, efficient and able to provide comfort and good indoor air quality for employees.



Julian Arhire is a Manager with DtiCorp.com - DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Monday, June 27, 2011

How To Find Big Savings In Construction Projects

Knowing what to expect - including the places costs typically "hide" - provides an edge for efficiently managing the construction process.

Step one

A well-defined interview process will assist you in selecting the best construction manager (CM) for the job. Be thorough; replacing the CM once the job has begun is costly and raises serious questions of liability.

For renovation work, invite only CMs with considerable related experience. Interview previous clients to determine the CM's ability to handle change orders, unforeseen elements and client decisions.

Insist that the project executive, project manager and project superintendent assigned to the job be present at the interview. (The executive represents the company, the manager spends the owner's money and the superintendent is the on-site contact.) Closely observe the interaction between these people. A successful project can hinge on the working relationship between them.

Require all interviewing CMs to submit a detailed account of what they heard and agreed to at the interview. This important document will reflect the CM's understanding of your conditions and form the basis for contract negotiations. This document will also serve to suppress potential disputes arising from construction contract issues.

Where costs hide

The construction contract between the owner and CM is a legally binding contract but its terms are not universal. The owner should negotiate the specifics of the contract requirements and the particular needs of the project.

The more knowledgeable the owner - often represented by the facility executive - is about the nature of the terms of the contract, the greater the awareness of the potential for hidden costs. Uninformed owners can unwittingly agree to pay more money for a longer period of time than necessary.

Demonstrate your understanding of the construction process by first knowing the unit prices and labor costs of every item you agree to purchase and negotiating the following standard construction contract line items.

• General Conditions. General Conditions should only be those non-construction costs that are necessary to get the job done and are directly applicable to the project. All general conditions should be a line item amount agreed to and guaranteed before the start of construction. Typical components of general conditions include funds for a site office, on-site project administration labor and necessary office equipment. Do not accept an amount that is expressed as a percentage of the cost.

Substantial savings can be realized by asking the right questions about general conditions. For example, question the site office requirements presented by the CM, including how much new equipment is necessary. Who should assume the cost of purchasing and installing the computer equipment and software the CM lists as a site office requirement?

• Overhead. Overhead is the CM's cost of doing business. Should the owner be responsible for that cost? An argument can be made that the owner need only pay for costs directly applicable to this specific project, and not for costs the CM incurs on other jobs. This line item in particular is often the subject of legal disputes. Do not be afraid to eliminate elements of cost contained in this category and, again, do not accept an amount that is expressed as a percentage of the work.

• Hourly Wages. Agree to pay only the wages for work on your project. The actual hourly wages, taxes and benefits (not a multiple of these) are the owner's responsibility. Time off and educational seminars are not. Avoid a situation where you are asked to pay wages for a general superintendent or any other part-time supervisory personnel.

• Construction Fees. To determine a fair construction fee, negotiate a percentage based only on the cost of the work. Be careful of the language of the contract. All fees are a direct percentage of the cost of the work, before the contingency and general conditions are added. A fair 4 percent construction fee could be 4.5 percent if taken as a percentage of a cumulative total. On multi-million dollar jobs, this can represent a substantial amount of money.

Insist that the fee be converted from a percentage to a fixed amount before construction starts. Once construction starts and the potential for change orders (that can increase the cost of the work) exists, the fee will continue to rise without limit. Don't allow the construction budget to be compromised in this way.

• Contingency Fee. Most CMs require that a contingency fee be built into the guaranteed maximum price. The only responsible way to manage the necessary contingency fee is to insist that it be jointly controlled by the owner and the CM. Neither the design nor the construction process is a perfect science; CMs will insist that they need to "manage their risk" with the contingency fee. Maintaining some control over the allocation of funds will enable the owner to best justify the expenses.

When negotiating the contract, the owner must "buy the schedule" with the cost of construction and guard against it slipping. Extending the construction phase is a costly decision.

Agree on the completion date of the project and insist that a penalty be levied if the project is delayed. Do not agree, however, to a bonus if the project is finished before the scheduled delivery date. The CM might deserve a bonus for early delivery if extraordinary problems were overcome, but does not necessarily deserve bonus dollars for performing the job you hired them to do.

Change orders and substitutions

In negotiating the change order procedure in the construction contract, the owner should demand a "no work stoppage" clause. Too much time can be wasted if work ceases in anticipation of a general agreement of change order amounts and schedule implications.

When presented with a change order, the architect should consider both the money and time the CM is looking to add to the job. Each is open for discussion. Don't wonder why construction isn't finished and then discover the architect has authorized an additional week of accumulated change orders.

While the CM should aggressively pursue reasonable substitutions on your behalf, be sure you or your architect knows the cost of the originally specified product and the cost of the alternative. The construction contract should state clearly that cost savings realized by the substitution for a specified product go directly to the owner. Here, too, substantial savings can be realized.

As your architect's last element of control over the quality of the project, the punch list must be a thorough process. Accompany the architect to look at the job. Try to anticipate any problems that may arise once the space is occupied. If a fault is discovered after the owner has released the CM, the issue will be more difficult, time consuming, and expensive to remedy.

Secrets of a successful renovation

To successfully manage a renovation process while the facility remains in operation, consider the following ways to minimize cost and disruption:

• What you see is not what you get. In most cases, the older the building you are occupying and renovating, the greater the potential discrepancy between the budgeted and actual costs of the renovation. Work with an architect and a CM who have enough renovation experience to anticipate potential unforeseen elements (electrical, mechanical, environmental and code compliance) and to quantify the cost of the work before the construction contract is signed.

• Designating a "swing space." If your project requires renovating existing spaces while you are occupying them, provide a "swing space" for temporary use by each displaced department as its permanent space is modified. To determine the order in which the areas are renovated, consult with department managers and the CM to minimize the disruption to company productivity and maximize the efficiency of the renovating and moving processes.

• Building a "smart" addition. If your renovation includes building an addition onto the space you are occupying, minimize traffic, dust and noise by building as much of the addition as possible before breaking through to connect with the existing spaces.

• Establishing a presence. As the facility manager, your knowledge of the facility and daily operations makes your presence in the process invaluable. Attend weekly construction meetings and address issues before they become magnified and more costly. Often, because of your vast knowledge of the building and its systems, you will understand the issues and can offer a workable solution more readily than the construction team.

Opening the lines of communication

Precise communication with all of the individuals involved in the process, especially the clients you service and the employees who must be accommodated, is essential. One extreme case - the renovation of a hospital emergency room - demanded the cooperation of the local police, ambulance services, and other area hospitals to reroute and accept patients.

Common scenarios involve notifying staff of an activity or a move (start date, duration, specifics), discussing the arrangement for temporary facilities, ensuring safety and security, and providing additional signs to redirect visitors. The more accurate the construction schedule and the more open the lines of communication, the more efficient and less expensive the process.

Weekly progress coordination meetings should be attended by building administrators, maintenance and engineering staffs, and each subcontractor to review progress. Detailed meeting minutes should be distributed both internally and to the appropriate regulatory officials. These minutes will be the core documentation vehicle for the project.

Not every owner or facility manager has the time, interest or expertise to devote to project management.

The owner can still protect his or her interests by hiring an advocate to coordinate and oversee the construction process. As the owner's representative, this individual defines the development process, negotiates project contracts, schedules and monitors all stages of the construction process, and coordinates communication between participants.

The fee for this service can be offset by substantial savings in construction costs. Many clients hire these experts to "fix" a project that is already in trouble, but an advocate is most valuable if consulted from the start.




Julian Arhire is a Manager with DtiCorp.com - DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.