Saturday, March 3, 2012

When Facility Executives Need HVAC Upgrades

You want to include a major HVAC renovation in the plan for this year. How do you convince an owner to complete a retrofit that the building needs? You need to demonstrate, first, how the upgrade will improve the building and, second, how this increases the value of the building for the owner.


Some managers may think it is simple to convince an owner to spend thousands of dollars on an upgrade. They assume that an owner will want to complete a project so the building remains state-of-the-art. However, most owners — institutions, for example — view the building as an asset similar to stocks or bonds. They need to see the value of the property increase as a result of their cash outlay.


A second reason commonly given by managers to owners is that the office building will operate more efficiently after the retrofit, thus reducing utility costs. However, tenants usually pay their share of the building’s operating costs based on the amount of space they occupy.


Therefore, the tenants, not the owner, will benefit from the reduced utility costs. The owner pays for the renovation at the time the work is done. The cost of the work is then amortized and passed through to the tenants over the lifetime or payback of the project. The owner will spend the money today and only recoup it over time while the tenants will experience the immediate benefit.


This is the challenge faced by a fictional facility manager we’ll call John Philips, who is responsible for the hypothetical Spencer Building. Built 10 years ago, The Spencer Building is a class A office building in a downtown market. Like many buildings in the marketplace, the 240,000 rentable square foot building is 100 percent occupied with no major leases rolling over for seven to 10 years. Philips is aware that the owner’s objective is to hold this building for at least two to five more years. Although only 10 years old, the building’s HVAC system has two problems. First, the energy management system is not state-of-the-art and does not provide the building with efficient operation and sufficient control. Second, the parts of the mechanical equipment are expensive to maintain.



Philips has recommended upgrading the EMS system and installing variable frequency drives (VFV) on major equipment motors. The upgrade of the EMS system will include new power supplies, bases, transducers, wiring and associated relays. The existing temperature sensors will be replaced and new direct digital controllers will be installed for the interior and exterior air handling units, 24 in all. Static pressure controllers, solar load sensors and control relays will also be added to the EMS, giving the operating engineers more control points to ensure tenant comfort levels and increased monitoring capability. All of the new sensors and relays will be linked by a networking cable in a user-friendly package to a desktop computer with a Pentium microprocessor, graphics card, high-speed modem, color monitor and color printer.


VFDs will be installed on all motors and pumps. VFDs provide a staged start-up of equipment, preventing “spikes,” or sharp increases in electric demand. Motor speed can also be controlled by a VFD to operate more efficiently when equipment is at part load. Other advantages to VFDs are increased equipment life, decreased maintenance costs and automatic restart of equipment after power failures.



The system upgrade was bid to five companies with the recommended vendor bidding on this work for $326,978. The vendor has also given the option of a lease of this system at $422,100 at 11 percent for 60 months. This cost includes energy accounting, bill auditing and benchmarking reports for the first year.


The economic analysis that follows is based on the upgrade package just described; however, a similar approach can be taken with any HVAC system upgrade.


Owner’s Plans

Because the building may be for sale in the next two to five years, Philips knows the owners will want an increase in value at time of sale and a quick return on investment. To prove the increase in value, Philips will rely on the income-capitalization method of appraisal. The income-capitalization method is based on the net operating income (NOI) — the result of subtracting the operating expenses from rents received. If rents go up or expenses go down, NOI increases; higher NOI means higher value.


What’s more, an HVAC retrofit may make a building more appealing to tenants than other buildings in the area, thus increasing rents. Further, a retrofit project usually decreases utility costs.


The income-capitalization method divides the income by a cap rate, defined by market conditions, to find value. Based on the NOI for the building and a cap rate of 9 percent, the current value of The Spencer Building is $50,666,666.



At the Spencer Building, occupancy is already 100 percent with no major leases expiring until the year 2015. Therefore, the upgrade will not attract new tenants so no increases in rent as a result of the project are expected.


However, if the building had vacant space and was located in a competitive market, it might have an edge in leasing over buildings with higher utility costs. A tenant pays operating expenses over a base year. A base year may be set at $10 per square foot. The tenant pays all operating expenses in excess of $10 per square foot; the owner bears the cost up to that amount. If the operating costs are $14 per square foot, the tenant is paying $4 per square foot. If the retrofit reduces costs by $0.50 per square foot, the tenants’ costs fall to $3.50 per square foot. The owner’s costs are not reduced. The benefit to the owner is that the tenant may be happy with the reduced costs and be more inclined to renew the lease.


Cutting Costs

The retrofit at the Spencer Building will reduce costs in several ways. The EMS will improve staging of equipment during start-up and shutdown schedules and increase detail of temperature sensing and automatic adjustment. The VFDs will reduce utility costs by operating at only the speed required to satisfy the comfort load; the current system provides constant volume and constant speed flow. Based on a review of the equipment and historical electrical data, energy savings are estimated at:




  • EMS base system utility savings: $96,154

  • VFD installation utility savings: $40,872

  • Total estimated annual utility savings: $137,026

  • Savings per square foot: $2.570


The system costs $326,978. As outlined above, the annual utility savings are $137,026, creating a payback period of 2.39 years. Annual utility savings will increase NOI by $137,026. This, in turn, produces an increase in value based on the income-cap method of $1,522,511. The new value of the building is $52,189,177.


Range of Benefits

Philips can present this project to the owner by citing the benefits of the upgrade. The physical improvements include:




  • Improved system control through installation of state-of-the-art equipment

  • Cost savings due to VFDs and improved response to temperature

  • Ease of operation by use of “point and click” methods

  • Reduction of engineering staff time required to program the system and to check concerns through the system rather than a physical site inspection

  • Reduced maintenance cost


More important are these financial benefits:




  • A payback period of less than 2.5 years

  • An increase in value in excess of $1.5 million dollars

  • Lower operating expenses for tenants


To win approval for capital projects, a facility manager must have two things: knowledge of the owner’s objectives and the ability to prove the improvements meet those goals. After this upgrade, the Spencer Building will have a state-of-the-art HVAC system and be worth more than before the renovation. This combination will make the building more attractive to potential purchasers. Based on the numerous benefits, the owner would probably approve this upgrade at the Spencer Building.

Friday, January 27, 2012

Boilers and HVAC Building Automation Systems

With the newest state-of-the-art sensors, direct digital controls and computer driven expert systems, buildings now can be completely automated and remotely controlled. This article will review what such systems and their operators can and cannot do, what new risks can be created for the boilers in such buildings, and how to reduce and control those risks.


Benefits of automation


Intelligent buildings today use a building automation system (BAS) and other systems to operate HVAC, boilers, chillers, lights, elevators, building access fire protection and other systems to achieve the twin goals of efficiency and comfort.


A BAS is defined here as a system of sensors, pilot devices, logic elements, controllers, peripheral computers, and monitoring equipment providing data to a central computer for energy-efficient control of a building’s internal environment while also providing maximum tenant comfort and equipment reliability.


BAS can deliver energy savings, comfort and maintenance/reliability benefits. These benefits cannot be achieved, however, unless the systems are properly integrated. The system designer must anticipate and overcome the risks outlined below.



Thermal shock


When boiler controls are improperly integrated with the BAS, thermal shock can occur in several ways.


The most common is low return water temperature. In a recent claim, a cast iron hot water boiler suffered a cracked section because of cold water returning from the system. The building was a single-story school, with portions of the building distant from the boiler room.


During the fall, the BAS was programmed to reduce the temperature setpoint on weekends. Water in the zones serving remote areas cooled, and when the BAS attempted to bring the building back to normal occupancy temperatures, a slug of cold water cracked the hot boiler sections.


The problem was solved by putting timers on the zone valves to prevent the simultaneous opening. Controls also were added to maintain a minimum floor through the longest loops during reduced temperature operations to maintain a minimum temperature.



In another case, a store chain reported damage to boilers and air conditioning equipment due to thermal shock when the BAS alternated between heating and cooling. This situation was made worse because all the store locations around the country were connected to a central BAS.


The central BAS computer did not adequately allow for transition from heating to cooling operation and vice versa, resulting in boiler damage and business interruption.


Another form of thermal shock can occur in systems that use a three-way bypass valve. When controlled by outdoor air temperature, these valves allow a high bypass, with reduced flow through the boiler. This reduces the temperature delivered to the loop, thereby saving energy.



The problem occurs when the control is so aggressive that the boiler water stratifies the same way water stratifies in a water heater. In situations where the boiler is called on to deliver only minimum input, the burner will cycle frequently. Since the overall temperature is low, the metal is subjected to much higher stresses than intended or designed for by the supplier.


Thermal shock also has occurred in boiler rooms having outside air inlet louvers controlled by the BAS. Cold outside air entering the boiler or equipment room will chill the boiler. If inadequate precautions are provided, thermal shock, freezing or condensation will occur.


Single-pipe heating and cooling systems area also subject to thermal shock. Single-pipe systems — one piping system for heating and cooling — sometimes are selected for low initial cost. Should both heating and cooling be called for within a short period of time, there is a good chance that chilled water will be admitted into the boiler. Serious thermal shock will result.


Two-pipe systems — using separate piping circuits for heating and cooling — do not completely eliminate this risk. If the BAS incorrectly sequences air handling units and if both heating and cooling coils are in the same unit, air cooled by the refrigeration coils will cool the heating coils. This also will cause cold water to return to the boiler.


Another more common event occurs when the BAS calls for 100 percent outside air to save cooling or heating energy. This usually occurs in shared spaces of buildings that do not require heating or cooling for comfort. Spaces such as foyers, lobbies, hallways or large conference rooms frequently receive 100 percent outside air to address indoor air quality concerns.



The heating coils in the air handling units can be subjected to low temperature. When the boiler starts or the local zone calls for heat, the cold water will shock the boiler.


In spaces requiring very strict temperature and humidity controls, simultaneous operation of the heating — temperature control — and cooling systems — to reduce humidity — is needed. Careful attention to the programming of such heat/cool operation is necessary to avoid the potential for cold water return to a hot boiler.


Condensation


When boilers cool below the dew point temperature of the combustion products, flue gas condensation will occur during the boiler warm-up, causing corrosion on fireside surfaces, breeching and stacks.


Corrosion is another leading cause of boiler accidents. Much of the corrosion can be avoided if the BAS is programmed to maintain boiler temperature at or slightly above the flue gas dew point.


Boiler start-up


When a boiler is first started from a cold condition, both the metal and water are cold. If the boiler is designed to adjust firing rates in response to load changes, it is very important to heat the boiler slowly.


The metal structure must be allowed to gradually absorb the stresses that develop as the metal expands with temperature. Most boiler manufacturers include low fire hold into their boiler controls to provide boiler warm-up. BAS programming must not compromise this protection by premature transfer to high firing.


Multiple boilers (Modular)



For buildings with multiple or modular boilers, the hazards discussed above are more difficult to handle. In such cases, BAS programming must recognize the practical limits of boiler operation for all units.


Other concerns


In addition to the mechanical aspects already discussed, there can be other concerns with control system integrity. A BAS is comprised of sensors, pilot devices, logic elements, controllers, peripheral computers and monitoring equipment. All of these devices are sensitive to some of the following conditions.


Electrical transients


A number of claims have recently been reported involving failure of electrical and electronic devices caused by electrical transients. Common disruptions stem from lighting, internal power fluctuations, harmonics and electric utility problems. Without proper protection, an otherwise harmless power fluctuation can result in damage to the boilers if the BAS fails.


Major utility power problems are infrequent. Lighting arresters, surge protection and current controls have made power in the United States very reliable. One source of localized disturbances is not uncommon, however.


Short duration voltage collapse — a few cycles — can occur when utilities attempt to regulate power factors by compensating for inductive loads with large capacitor banks. When the capacitor bank is engaged, the current inrush causes the voltage to sag, which can cause localized disturbances in the power system.


Boiler/BAS Solutions


CONSIDER THESE RECOMMENDATIONS to address common boiler problems related to BAS:



Thermal shock



  • Prevent cold water return by installing three-way mixing valves as a way of limiting the boiler inlet water temperature.

  • Consider a small blending pump to prevent temperature stratification in the boiler.

  • Control the low fire hold to warm the boiler according to boiler manufacturer guidelines.

  • Avoid high fire cut-off when zones are satisfied to avoid rapid temperature change.

  • Don’t overlook the air side as a potential source of thermal shock.



Condensation



  • Avoid control logic that will increase the frequency of boiler cycling.

  • Avoid contact of humid outside air on cool boiler surfaces, or keep the boiler warm.

  • Maintain minimum boiler temperature at or above flue gas dew point.


Electrical transients



  • Properly ground not only the BAS but also all other equipment. Follow the manufacturer’s instructions.

  • Isolate AC power connection to electronics using isolation transformers or equivalent devices.


  • Maintain minimum boiler temperature at or above flue gas dew point.



Recommendations


This article has covered areas of concern when integrating heating and cooling equipment with automatic building controls. BAS control programs must recognize the operating limitations of all controlled equipment, as well as the customary energy optimization, HVAC comfort, and building security objectives.



Building designers and owners and maintenance and engineering managers should always follow the recommended practice of the equipment manufacturers. BAS have the ability to control and monitor equipment and alarms from remote locations. Many states have laws requiring boiler operators to be on site in certain situations.


The ability of the BAS to sound alarms based on preset conditions with actions implemented from a remote location should not replace the actions taken by qualified operators on the scene.

Friday, January 6, 2012

DtiCorp.com is Introducing the New Honeywell PP905B1008 Static Pressure Sensor

Fort Lauderdale, FL – Popular Honeywell online retailer DtiCorp.com (http://www.DtiCorp.com) is introducing the brand new Honeywell PP905B1008 static pressure sensor. One-pipe, direct-or reverse-acting pressure sensor used with RP908/RP920 Controllers to provide control of duct static, velocity, or differential pressure in airflow applications. Replacement devices available for Johnson, Powers, Robertshaw, Barber-Colman, and older Honeywell devices.




Features:


- Three-diaphragm design minimizes calibration shift with static pressure changes in velocity pressure applications.


- Not sensitive to normal supply air variations.


- Continuous static, total, velocity, or differential pressure indication available by using differential pressure gage.



Specifications:



- Description: Static Pressure Sensor used with RP920/RP908


- Application Type: Static Pressure



- Pressure Range (psi): 2 in. wc


- Pressure Range (kPa): 0.5 kPa


- Maximum Safe Operating Pressure (psi): 25 psi


- Maximum Safe Operating Pressure (kPa): 172 kPa


- Output Pressure Range (psi): 3 psi to 15 psi


- Output Pressure Range (kPa): 21 kPa to 103 kPa


- Connections: Push-on barb for 1/4 in (6 mm) Diameter tubing


- Temperature Range (F): 40 F to 120 F


- Temperature Range (C): 4 C to 50 C



- Setpoint Range (in. wc): 0 in. wc. to 7 in. wc. (Adjustable)


- Setpoint Range (kPa): 0 kPa to 1.7 kPa (Adjustable)


- Mounting: Duct mount


- Dimensions (in.): 8 in high, 9 in wide, 4 1/8 in deep


- Dimensions (mm): 203 mm high, 228 mm wide, 105 mm deep


- Airflow Usage: 0.021 cfm (9.9 ml/s)


- Action: Can be set for Direct Acting or Reverse Acting


- Mainline Air Pressure (max.) (psi): 25 psi


- Mainline Air Pressure (max.) (kPa): 175 kPa



- Mainline Air Pressure (min.) (kPa): 112 kPa


- Span (Non-Adjustable) (in. wc): 2 in. wc.


- Span (Non-Adjustable) (kPa): 0.5 kPa


- Mainline Air Pressure (min) (psi): 16 psi


- Maximum Safe Static Pressure (in. wc): 28 in. wc


- Maximum Safe Static Pressure (kPa): 7 kPa


- Comments: The setpoint determines the midpoint of the span.





About Us: DtiCorp.Com (http://www.DtiCorp.com) carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more. Our online catalog is easy to navigate and search, and all products have a picture and a description. If a customer has any questions about a product, they can call 800-757-5999 and speak with one of our product experts. Our mission is to offer the best prices anywhere to our customers.


Julian Arhire

Manager DtiCorp.com

Phone: 954.484.2929

Fax: 954.484.5155

Web: http://www.DtiCorp.com




###

Tuesday, November 22, 2011

DtiCorp.com Is Introducing The New Honeywell Q7770A1001 RapidLink Network Adapter

Fort Lauderdale, FL – Popular Honeywell online retailer DtiCorp.com (http://www.DtiCorp.com) is introducing the brand new Honeywell Q7770A1001 RapidLink Network Adapter. The Q7770A uses 9 to 24 Vac or Vdc, 9 Vdc power supply using removable screw terminals or a 9 Vdc barrel connector to perform network operations. A connector cable attaches the Q7770A to the LonWorks-Bus port on Excel 10 controllers or wall modules. RapidLink has LEDs that indicate activity on the serial, modem, and E-Bus. RapidLink has an LED indicating that the device is powered and an LED indicating that the E-Bus Service switch, located on the front panel, is being pressed. RapidLink also provides a Reset switch on the front panel. The RapidLink enclosure has provisions for both wall mounting and tabletop operation.



Features:



- High performance communications protocol provides for faster communication of data to your LONWORKS network.


- Serial EIA-232 interface connects host processors to LONWORKS networks.


- A fixed 115,200 baud rate is supported on serial the EIA-232 port to support direct local connections.


- On-board modem support with baud rate up to 56K bps to support remote dial-up connections.


- Uses LONWORKS network protocol.


- Integral FT-3150® smart transceiver.


- LONWORKS communicates through a 78-kilo-baudtransformer-coupled transceiver.


- 9 to 24 Vac or Vdc Class 2 power input using a mating connector with removable screw terminals.


- Automatic dial-out using on-board modem for transferring alarm information to a central station (When used in conjunction with XL15A Building Manager).



- Easy migration for existing systems through one to one replacement of existing LON® transceiver and external modem with RapidLink and upgrading LONSPEC, LONSTATION and XL15A firmware to 4.6.5, 4.6.0 and 2.4.61 (or later versions) respectively.


- Easy wall mounting or tabletop operation.


- Fast installation – No switches to configure.


- Easy to read labels to guide installation of wiring.



Specifications:


- Model Number: Q7770A1001


- Supported Application(s):



- LonSpec Version 4.6.5 and above.


- LonStation Multi-Site version 4.6.0 and above.


- RapidZone Version 3.0.0 and above.


- System Processor: Ubicom IP2022 RISC Processor.


- Neuron Transceiver: Echelon, Neuron FT-3150 Smart Transceiver.


- Transceiver Type: Transformer isolated, differential Manchester transceiver Display Two service LEDs indicate service request information for each segment; Status LED indicates when network traffic is occurring;


- Modem Connection: On-board Modem supports remote


connection with connection speeds of up to 56 Kbps.


- Modem Connector Type: RJ-11.



- Network (E-Bus) Connector: Weidmuller – 2-conductor BLA.


- Bus Polarity: Polarity insensitive.


- E-Bus Service Interface: Service Switch and LED.


- Serial Port EIA-232 (Formerly RS-232).


- Serial Port Bit Rate: 115200 bps.


- Serial Connector Type: Female DB-9.


- Power Polarity: Polarity insensitive.


- Input Operating Voltage: 9 to 24 Vac or Vdc.



 


About Us: DtiCorp.Com (http://www.DtiCorp.com) carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more. Our online catalog is easy to navigate and search, and all products have a picture and a description. If a customer has any questions about a product, they can call 800-757-5999 and speak with one of our product experts. Our mission is to offer the best prices anywhere to our customers.