Geothermal Systems Heating, From the Ground Up

The demand on maintenance and engineering managers to provide comfortable temperatures and good indoor air quality while keeping a tight grip on the budget is among their greatest challenges. On top of the energy costs, there is a maintenance cost for HVAC, boilers, chillers and cooling towers, which can stretch staff skills and time in many directions.


Yet there is a way to provide a high level of comfort without taxing the budget or the staff. The geothermal heat pump systems can cut maintenance and energy costs in half.


How Geothermal Heat Pump Works

Geothermal heat pump systems rely on the temperature of the earth to heat and cool buildings. While there is a variety of designs, the most popular design relies on heat pumps and a closed-loop system of pipes laid under the ground or a body of water.



The efficiency and simplicity of the system is due to the closed-loop system that acts as a large heat exchanger. The loop is filled with a heat-transfer fluid, typically water or a water-antifreeze mix. When a facility requires cooling, heat is transferred from a building to the earth. When heating a facility, heat is absorbed from the earth and transferred to the building.


The system utilizes a heat pump that uses a refrigerant cycle to take low quality heat and concentrate it to high quality heat. Pumps and fans then move the heat.


The system is efficient and simple because it moves heat and does not create heat. In addition, while most mechanical cooling systems work under the same principles, geothermal systems gain efficiency because of the size of their primary heat exchanger — the loop.


At the heart of the process are two thermodynamic principles: Heat always flows from hot to cold, and the greater the difference in temperatures, the higher the rate of heat transfer.


Six to eight feet beneath the surface of the earth, the ground maintains a constant annual temperature from 45 in the north latitudes to 70 degrees in the south. Because the earth’s temperature is stable and the ambient air temperature is not, there is a seasonal differential in most climates that makes the geo-thermal process efficient.



Cost Savings

The relative simplicity of the systems is in part what makes them cost effective. Geothermal heat pump systems do not rely on boilers and cooling towers. Since reversing-cycle technology is deployed at the point of use, there are only two pipes to provide heating and cooling, not four like most conventional systems. And there are no large chillers in the mechanical room or an array of packaged units on the roof exposed to the elements and creating potential problems for the roofing system. All the critical equipment, except the ground loop — pumps, scroll compressors and fans — are inside the building, protected from the elements.


The heat pumps are generally small, which makes them more flexible in terms of design. While some manufacturers will produce 50-ton capacity pumps, most run from 2-10 tons for commercial and institutional markets. To achieve a higher tonnage capacity, multiple heat pumps are linked together. The heat pumps can be fixed in a zone distribution network that allows for point-of-use heating or cooling.


Cost Matters

There are other savings, too. Most of the piping in these systems is polyethylene plastic piping, like gas-line pipe, rather than copper or ferrous-based piping. Ductwork generally is not a part of the installation except for point of use distribution and fresh-air delivery.


There are also maintenance and operational savings. According to the American Society of Heating, Refrigeration and Air-conditioning Engineers (ASHRAE), the annual maintenance cost for a conventional boiler, chiller, cooling tower system is 65 cents per square foot. For a geothermal system that cost is 22-25 cents per square foot. The cost is lower because there is less equipment that needs attention.


Of the maintenance tasks necessary, changing filters was the highest. Less than half as many tasks involved lubrication and checking fan belts, the study notes. There are no water quality problems to worry about. You don’t have to clean or treat a cooling tower. There’s virtually no maintenance to the heat pump. About the only cost is to change filters and maybe check on the circulation pumps’ packings and on the fan belts.


The heat pumps themselves come as self-contained units that are tested at the factory. Even the refrigerant is in a sealed system that requires no checking.



Technology Evolves

Geothermal heat pump technology is energy efficient, offering energy costs about 25-50 percent less than those for a conventional system. Recent changes in the technology have made a significant difference.


The biggest change came when the industry switched from reciprocating compressors to scroll compressors. There was a sizable increase in efficiency there. Manufacturers also started using variable speed fans and compressors. There also have been improvements in reversing and expansion valves in pumps and evaporative coils.


Geothermal heat pump systems have lifespans of 22 years or more and in-ground piping can last 50 years or more. As a result of these and other changes, efficiency has improved. The coefficient of performance for these systems went from 3 to 4.5, and SEER ratings from 13-14 to 17-18. Additional changes in the technology and installation has made these systems better life-cycle investments. For instance, much of the joining of the ground pipe is done in the factory under controlled conditions, rather than in the field. When joints must be made in the field, the tools to do that have been improved. Leaks in the loop are practically unheard of.


Life-Cycle-Cost Advantage

Because a significant portion of the cost of these systems is in the installation of the buried loop, the costs for the whole system begin to decrease as the system gets bigger. Fifty tons is about the breaking point. At that point, the cost of digging more trenches or drilling more wells doesn’t continue to increase at the same rate because the contractor has already brought in his equipment and the work crews are at the site.



The first cost of the system depends on many local variables. Is there competition in the area for geothermal systems? Are well drillers readily available? What is the soil and geology of the area? These systems can more than pay for themselves over the years, avoiding costs on maintenance and roof repairs, and because equipment, principally the loop system, lasts so long, the energy efficiency is really the icing on the cake.

Friday, January 27, 2012

Boilers and HVAC Building Automation Systems

With the newest state-of-the-art sensors, direct digital controls and computer driven expert systems, buildings now can be completely automated and remotely controlled. This article will review what such systems and their operators can and cannot do, what new risks can be created for the boilers in such buildings, and how to reduce and control those risks.


Benefits of automation


Intelligent buildings today use a building automation system (BAS) and other systems to operate HVAC, boilers, chillers, lights, elevators, building access fire protection and other systems to achieve the twin goals of efficiency and comfort.


A BAS is defined here as a system of sensors, pilot devices, logic elements, controllers, peripheral computers, and monitoring equipment providing data to a central computer for energy-efficient control of a building’s internal environment while also providing maximum tenant comfort and equipment reliability.


BAS can deliver energy savings, comfort and maintenance/reliability benefits. These benefits cannot be achieved, however, unless the systems are properly integrated. The system designer must anticipate and overcome the risks outlined below.



Thermal shock


When boiler controls are improperly integrated with the BAS, thermal shock can occur in several ways.


The most common is low return water temperature. In a recent claim, a cast iron hot water boiler suffered a cracked section because of cold water returning from the system. The building was a single-story school, with portions of the building distant from the boiler room.


During the fall, the BAS was programmed to reduce the temperature setpoint on weekends. Water in the zones serving remote areas cooled, and when the BAS attempted to bring the building back to normal occupancy temperatures, a slug of cold water cracked the hot boiler sections.


The problem was solved by putting timers on the zone valves to prevent the simultaneous opening. Controls also were added to maintain a minimum floor through the longest loops during reduced temperature operations to maintain a minimum temperature.



In another case, a store chain reported damage to boilers and air conditioning equipment due to thermal shock when the BAS alternated between heating and cooling. This situation was made worse because all the store locations around the country were connected to a central BAS.


The central BAS computer did not adequately allow for transition from heating to cooling operation and vice versa, resulting in boiler damage and business interruption.


Another form of thermal shock can occur in systems that use a three-way bypass valve. When controlled by outdoor air temperature, these valves allow a high bypass, with reduced flow through the boiler. This reduces the temperature delivered to the loop, thereby saving energy.



The problem occurs when the control is so aggressive that the boiler water stratifies the same way water stratifies in a water heater. In situations where the boiler is called on to deliver only minimum input, the burner will cycle frequently. Since the overall temperature is low, the metal is subjected to much higher stresses than intended or designed for by the supplier.


Thermal shock also has occurred in boiler rooms having outside air inlet louvers controlled by the BAS. Cold outside air entering the boiler or equipment room will chill the boiler. If inadequate precautions are provided, thermal shock, freezing or condensation will occur.


Single-pipe heating and cooling systems area also subject to thermal shock. Single-pipe systems — one piping system for heating and cooling — sometimes are selected for low initial cost. Should both heating and cooling be called for within a short period of time, there is a good chance that chilled water will be admitted into the boiler. Serious thermal shock will result.


Two-pipe systems — using separate piping circuits for heating and cooling — do not completely eliminate this risk. If the BAS incorrectly sequences air handling units and if both heating and cooling coils are in the same unit, air cooled by the refrigeration coils will cool the heating coils. This also will cause cold water to return to the boiler.


Another more common event occurs when the BAS calls for 100 percent outside air to save cooling or heating energy. This usually occurs in shared spaces of buildings that do not require heating or cooling for comfort. Spaces such as foyers, lobbies, hallways or large conference rooms frequently receive 100 percent outside air to address indoor air quality concerns.



The heating coils in the air handling units can be subjected to low temperature. When the boiler starts or the local zone calls for heat, the cold water will shock the boiler.


In spaces requiring very strict temperature and humidity controls, simultaneous operation of the heating — temperature control — and cooling systems — to reduce humidity — is needed. Careful attention to the programming of such heat/cool operation is necessary to avoid the potential for cold water return to a hot boiler.


Condensation


When boilers cool below the dew point temperature of the combustion products, flue gas condensation will occur during the boiler warm-up, causing corrosion on fireside surfaces, breeching and stacks.


Corrosion is another leading cause of boiler accidents. Much of the corrosion can be avoided if the BAS is programmed to maintain boiler temperature at or slightly above the flue gas dew point.


Boiler start-up


When a boiler is first started from a cold condition, both the metal and water are cold. If the boiler is designed to adjust firing rates in response to load changes, it is very important to heat the boiler slowly.


The metal structure must be allowed to gradually absorb the stresses that develop as the metal expands with temperature. Most boiler manufacturers include low fire hold into their boiler controls to provide boiler warm-up. BAS programming must not compromise this protection by premature transfer to high firing.


Multiple boilers (Modular)



For buildings with multiple or modular boilers, the hazards discussed above are more difficult to handle. In such cases, BAS programming must recognize the practical limits of boiler operation for all units.


Other concerns


In addition to the mechanical aspects already discussed, there can be other concerns with control system integrity. A BAS is comprised of sensors, pilot devices, logic elements, controllers, peripheral computers and monitoring equipment. All of these devices are sensitive to some of the following conditions.


Electrical transients


A number of claims have recently been reported involving failure of electrical and electronic devices caused by electrical transients. Common disruptions stem from lighting, internal power fluctuations, harmonics and electric utility problems. Without proper protection, an otherwise harmless power fluctuation can result in damage to the boilers if the BAS fails.


Major utility power problems are infrequent. Lighting arresters, surge protection and current controls have made power in the United States very reliable. One source of localized disturbances is not uncommon, however.


Short duration voltage collapse — a few cycles — can occur when utilities attempt to regulate power factors by compensating for inductive loads with large capacitor banks. When the capacitor bank is engaged, the current inrush causes the voltage to sag, which can cause localized disturbances in the power system.


Boiler/BAS Solutions


CONSIDER THESE RECOMMENDATIONS to address common boiler problems related to BAS:



Thermal shock



  • Prevent cold water return by installing three-way mixing valves as a way of limiting the boiler inlet water temperature.

  • Consider a small blending pump to prevent temperature stratification in the boiler.

  • Control the low fire hold to warm the boiler according to boiler manufacturer guidelines.

  • Avoid high fire cut-off when zones are satisfied to avoid rapid temperature change.

  • Don’t overlook the air side as a potential source of thermal shock.



Condensation



  • Avoid control logic that will increase the frequency of boiler cycling.

  • Avoid contact of humid outside air on cool boiler surfaces, or keep the boiler warm.

  • Maintain minimum boiler temperature at or above flue gas dew point.


Electrical transients



  • Properly ground not only the BAS but also all other equipment. Follow the manufacturer’s instructions.

  • Isolate AC power connection to electronics using isolation transformers or equivalent devices.


  • Maintain minimum boiler temperature at or above flue gas dew point.



Recommendations


This article has covered areas of concern when integrating heating and cooling equipment with automatic building controls. BAS control programs must recognize the operating limitations of all controlled equipment, as well as the customary energy optimization, HVAC comfort, and building security objectives.



Building designers and owners and maintenance and engineering managers should always follow the recommended practice of the equipment manufacturers. BAS have the ability to control and monitor equipment and alarms from remote locations. Many states have laws requiring boiler operators to be on site in certain situations.


The ability of the BAS to sound alarms based on preset conditions with actions implemented from a remote location should not replace the actions taken by qualified operators on the scene.

Tuesday, January 24, 2012

What Are The Rooftop HVAC Units?

When rooftop units were first introduced some 40 years ago, they were considered by system designers and building owners to be a bare bones, low cost, simple solution to low-rise building HVAC needs. Low cost was the primary driving force for both manufacturers and users. But while they were popular with designers and owners, many maintenance managers considered them nightmares: difficult to service, prone to breakdowns, inadequately protected from the elements.


Today, everything has changed. Gone is the concept of one size fits all. Buyers have more options, including practically all of the same features found in other types of building HVAC systems, from economizers for energy conservation and prewired interfaces for building automation systems to heat wheels and other heat recovery devices. No longer can the systems be labeled as bare bones.


What has contributed to this change has been a shift in focus from first costs to life-cycle costs by both manufacturers and users. The result has been the development of new rooftop systems that include features to make them more efficient and easier to maintain.


The typical rooftop unit today comes in one of two configurations: single-zone or VAV. Single-zone systems remain the more widely used. They are low-pressure systems that provide a constant volume of airflow to a single zone controlled by a single thermostat. Since they do not include controls for multiple zones, this type of rooftop unit is best suited for use in the areas with fairly uniform heating and cooling loads.



The VAV configuration is gaining popularity, primarily as a result of its ability to serve multiple areas, each with different heating and cooling loads. The typical VAV rooftop unit supplies air at a constant temperature to a distribution system that includes VAV boxes to regulate airflow into each different area. The VAV configuration makes the units more flexible while improving their operating efficiency.


Rooftop units are available today in a wide range of capacities and configurations. The most common cooling configuration uses a DX system, with air or water cooling. Operating efficiencies for air-cooled units range between 1.0 and 1.5 kW per ton, and between 0.80 and 1.0 kW per ton for water-cooled units, including all fan and pump energy use. Units can also be configured to use externally generated chilled water. Today’s typical rooftop unit is 30 percent more efficient than those of earlier generations.


Rooftop units can use hot water, steam, natural gas or propane for heating, with capacities ranging from 40,000 to more than 2 million Btu for natural gas and propane units, and up to 4 million Btu for steam units.


Some of the most common complaints about rooftop units have come from maintenance personnel. Early generation systems simply were not easy to maintain. Access panels were held in place with sheet metal screws. Panels often were not replaced properly and screws were lost, exposing the interior of the unit to the elements. With time, the protective finishes on the exposed panels broke down, resulting in rusting and further exposure of unit components to the elements. Removable panels were often dropped during removal or reinstallation, resulting in damage to the building’s roof. But perhaps the most serious drawback was that the units were not designed to make maintenance easy. As a result, proper maintenance was rarely performed.


New rooftop unit designs facilitate maintenance. Exterior panels are protected by an epoxy finish that resists the elements, practically eliminating rusting problems. Machine screws have been replaced with hinged panels and latches, allowing easier access and more secure fastening of panels. Electronic diagnostic panels have been included in some system designs to ease system setup and troubleshooting. The net result is that rooftop systems offer the same advantages as earlier generation systems — including low first costs, factory assembly and ease of installation — without sacrificing performance or efficiency.


Rooftop units are suited for use in practically any low-rise application, such as in retail and institutional facilities. They are particularly well suited for applications where flexibility is required, such as frequent reconfiguration of interior spaces and functions.

Wednesday, January 18, 2012

Fresh Look At Ductless HVAC Systems

While many types of HVAC systems are advancing, some advances are overlooked because they have occurred in some of the less glamorous types of HVAC systems: rooftop units, split ductless systems and portable AC units. The result of these gains is that facility executives have more options today when it comes to selecting systems and components to meet building needs. But having more options is good only if the most appropriate option is selected for a particular application. Simply rushing into using new HVAC technology without first understanding the appropriateness of that technology for a given application is a recipe for disaster. Inappropriate system selection can result in poor IAQ, poor system performance, high energy use, increased user complaints and maintenance headaches.


Ductless HVAC Systems


Ductless HVAC systems, like rooftop systems, have been widely promoted by some for their low first costs and their ability to provide a quick and easy solution to building HVAC problems. And like rooftop units, they have been widely criticized by maintenance personnel as being difficult to maintain. Ductless HVAC systems, like all other HVAC systems, have their applications and their limitations. Properly applied, they can provide flexibility and improve comfort in a cost-effective way. Improperly applied, they can cause maintenance headaches, contribute to IAQ problems and cause comfort problems for building occupants.


Ductless HVAC systems come in a number of different configurations. Most are two- or four-pipe fan coil units that can provide both heating and cooling. More recently, units have been introduced that are essentially ductless heat pumps, with one portion of the unit mounted in the conditioned space, and the other mounted outside the facility.



The systems offer several advantages that go beyond low first costs. With no central air handler, less mechanical equipment space is required. Lower ceilings can be used since the units require no ductwork. With individual thermostats controlling each unit, spaces can be easily zoned. With all operating components, such as the fan, the thermostat, and the heating and cooling coils located in a single unit, modifications can be readily made to the HVAC system to match changes made in space configuration or use. For these reasons, split ductless systems are frequently found in educational and healthcare facilities, computer rooms, lobbies and building entryways.


The biggest drawback of ductless systems is their inability to supply the occupied space with fresh air. Some fan coil system designs did include a small outdoor air intake, but ongoing problems with the freezing of coils led many maintenance departments to block off these intakes. Split ductless systems do not supply the conditioned space with fresh air. Fresh air to these areas must be provided by a separate system.


Maintenance requirements are an important issue with ductless systems. Because the systems are so simple in their design, and the components so relatively small, maintenance requirements can easily be overlooked. But in spite of their simple design, ductless systems require regular maintenance. Filters must be changed. Condensate pans must be checked and cleaned. Fans and belts must be inspected. Controls must be tested. The problem for many maintenance managers is that the cost of performing the required maintenance may offset any cost advantage offered by the system. But overlooking the maintenance requirements will decrease system performance, shorten equipment life and adversely impact indoor air quality.


Nevertheless, there are good applications for ductless HVAC systems. Because each ductless unit is controlled by its own thermostat, conventional fan-coil-based ductless systems provide an unlimited level of zone control, ideal for applications where individual room control is required. Split ductless systems are also suitable for meeting the HVAC needs of spaces having unusually high cooling loads, such as rooms housing telecommunications or computer equipment.

Thursday, December 22, 2011

Introducing BigHVAC.com – The HVAC Directory

Miami, FL – BigHVAC.com (http://www.bighvac.com) is the leading HVAC business search engine and directory network serving all local HVAC business users and advertisers. BigHVAC.com helps business decision makers quickly find what they need to manage and grow their businesses, and enables advertisers to reach these users wherever they are across the country.


BigHVAC.com is a place for consumers, contractors and manufactures to locate HVAC services and products. A place for consumers to make an informed purchasing decision. A place for everyone to better understand their HVAC system and what they can do to improve system efficiency.


The HVAC Directory offers both free and paid listings under a number of categories. BigHVAC.com will simplify the way the HVAC industry is searched for relevant results.



Why register your business on BigHVAC.com?


1. Because you can build your HVAC listing the way you want it and edit your listing as you need to.

2. Because it’s free.

3. It’s a great way to help build or promote your HVAC company & brand.

4. Because it’s a way to generate HVAC leads and referrals and you owe nothing for these.

5. Because more and more people are going to the Internet for resources and referrals.

6. Because more links pointing to your website are good for Search Engine Optimization (SEO).

7. Because BigHVAC.com is a dedicated and focused Directory for HVAC contractors.


8. Because promotes Local HVAC contractors and services.


You can check the Directory (using the Zip code search) to verify that your business is not already listed in BigHVAC.com. If you have a business listed on the directory and want to manage it, click on the link at the bottom of your listing, then click on the link to upgrade your account. This will save time in getting your account created. You may then decide when you login to keep the free account and add your content, or upgrade to the enhanced listing service.  You will receive an email verification to the email address you registered; you must click on it and then you’ll be able to add content to your listing. If you do not get the email verification you need to check your spam folder.


This form must be filled out for all free and paid listings in which after the account is created you can then choose which type of listing you’ll be interested in. The mandatory fields are marked with the asterisk.


Who should be listed on HeatingGuide.com?


-   HVAC Contractors

-   Air Conditioning Contractors

-   Geothermal Heating and Cooling Contractors

-   Heating and Cooling Contractors

-   HVAC Equipment and Supplies Contractors

-   HVAC Suppliers

-   Solar Heating and Cooling Contractors

-   Plumbing Contractors

-   Heating Companies

-   Air Conditioning Companies

-  Distributors of HVAC Supplies


About us: The BigHVAC.com (http://www.bighvac.com) Directory is the premier resource for finding local professional HVAC contractors online. The website offers the nation’s buyers a source where they can find the HVAC products and services that they need. The website access information from over 35,000 North American companies, and has over 2 million listings included in different categories. The website also serves as an ad network, and is one of North America’s leading business to business locations. A search will allow users to find specific HVAC companies or services. The homepage features a list of HVAC categories that users can select from. If you are an HVAC residential, commercial or industrial contractor we invite you to include your profile for free in the HVAC Directory.

Monday, August 1, 2011

What is HVAC? HVAC Information For Home Owners

HVAC, or heating, ventilating, and air conditioning, is a term that deals with the climate control of a structure. In some regions of the world, HVAC will also be used to refer to electrical issues and plumbing. The heat, ventilation, and air conditioning of a structure are all interconnected. The goal of HVAC is to provide an architectural structure with a high quality of indoor air, as well as excellent thermal properties and competitive installation costs. A system that is built with HVAC properties can also reduce the amount of infiltration that is present in a structure. In most modern buildings, either one or multiple HVAC systems will be used. If the building is fairly small, the construction company will generally select specific HVAC systems that can be efficiently used with it.

For a building that is large, the construction company may need to use engineers who work in the building services field. Engineers who specialize in a number of fields may be used for these tasks, and they may be responsible for dealing with mechanical or structural issues. The engineers will play an important role in the design of the HVAC system. When an HVAC system is installed, it is mandatory for construction companies and engineers to make sure they are following the building codes, and they must also have the proper permits. There are a number of units that are comprised within HVAC. Some of them are fan coil units, air handling units, and makeup air units. The fan coil unit is a small structure that acts as a blower, and it will commonly be used in hotels.

Our Top ten list of HVAC products:

o HONEYWELL T7350H1017 Programmable Commercial Thermostat

o HONEYWELL T6574B1004 Digital Fan Coil Thermostat

o HONEYWELL M9164A1005 120V Non-SpringReturn Foot Mounted Actuator

o HONEYWELL V8944N1061 Diaphragm Gas Valve

o HONEYWELL DM7600B1103 14 inch Single Blade Round Damper

o HONEYWELL ML4115B1008 Fast-Acting,Two-Position Actuator

o HONEYWELL EMM-3U Universal Electronic Mini-Zone 3-Zone Panel

o HONEYWELL SV9502H2522 SmartValve System Control

o HONEYWELL W7751H2025 SMART VAV ACTUATOR

o HONEYWELL MS8120A1007 Two-position, SPST Actuator



Julian Arhire is a Manager with DtiCorp.com - DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Wednesday, July 6, 2011

The Best Path To Lighting And HVAC Efficiency

The building's chiller is the single biggest user of electricity in a typical facility. Add in the heating system, and the energy used to distribute the heating and cooling to the building, and it is no surprise that most successful energy management programs have focused on lighting and HVAC.

Fortunately, facility executives have many options when it comes to conserving energy in lighting and HVAC systems. By applying new lighting technology, facility executives can cut lighting energy use by an average of 30 to 50 percent, while improving the performance of the lighting system. Lamps with electronic ballasts, lighting controls, high efficiency replacements for incandescent lamps - all are being widely used in lighting system upgrade programs.

Similar improvements are being made in the operation of HVAC systems. New technologies allow facility executives to reduce the energy use of their HVAC systems by 25 to 50 percent, without sacrificing comfort or indoor air quality. High efficiency chillers, direct digital controls, energy management systems - these and other new technologies are being widely applied in building HVAC system upgrades.

Individual Projects or an Integrated Plan?

One of the biggest questions facility executives face when looking at upgrading lighting and HVAC systems is how much should they do. Some technologies offer a fast payback. Other technologies, while reducing energy use and improving the quality of the services provided to the facility, have much longer paybacks, often two or three times longer. Should facility executives focus only on those items that offer a rapid payback, or should they only be concerned with the payback for the overall upgrade program? While the available level of funding can be a limiting factor, other factors must also be considered.

Start with the reasons why the upgrade program is being implemented. Energy conservation, while a driving factor, is not the only issue. The primary purpose of any lighting or HVAC system is to meet the needs of building occupants. When looking to upgrade existing systems, facility executives must focus on the quantity and quality of light and space conditioning needed to meet those needs. Unfortunately, limiting system upgrades to items with a quick payback usually fails to take into account occupant needs. And when occupant needs are overlooked, facility executives risk jeopardizing productivity and morale to the point where tenants may move or the energy management measures that were implemented may be defeated by the occupants.

Another problem with limiting system upgrades to components with quick paybacks is the effect it has on overall system performance. Implementing quick payback projects tends to produce a series of upgrade patches.

But simply replacing the lamps does not address the issue of how much light is actually needed in the space. If the space is overlit, additional energy could have been saved by examining the lighting requirements, changing the number of fixtures installed, using a ballast with a lower ballast factor or installing lighting controls. Similarly, the original chiller may have been oversized for normal operation. Additional savings could have been achieved by installing a smaller chiller, or two smaller chillers whose operation can be staged to match the building load, or by installing a variable speed drive on the new chiller. Even more energy could have been saved by installing a high efficiency cooling tower.

Finally, programs that are implemented in a patchwork fashion are more expensive and more disruptive to building occupants. When the entire system is upgraded, all work in a given area can be performed at the same time. When the system upgrade is implemented as separate components at different times, occupants will be disrupted and finishes disturbed each time a new project is initiated.

For these reasons industry experts recommend that lighting and HVAC upgrades be implemented on a system-wide basis rather than on an individual project basis.

One at a Time?

The next question that the facility executive faces is how to implement the upgrade. Should the lighting system be upgraded before or after the HVAC system, or should those systems be upgraded at the same time? Again, funding may dictate how the program is implemented, but the close interconnections between lighting and HVAC systems suggest that the best approach to upgrading is to upgrade both at the same time.

The strongest interconnection between lighting and HVAC systems is energy use. Lighting systems introduce heat into the conditioned space. For every kilowatt of energy used by the lighting system during the air conditioning season, the HVAC system must remove one kilowatt of heat, or slightly more than 3,400 Btu. The higher the lighting load, the higher the load on the building's chillers.

Not only does this increase the cooling energy requirement for the building, but also it increases the size of the chiller required to cool the building.

A comprehensive lighting upgrade program will reduce the load on the building's chiller, lowering its energy use. If the load reduction is large enough and if the HVAC system is being upgraded at the same time, it may be possible to replace the chiller with a smaller unit, saving both installation and operating costs.

A second link between the lighting and HVAC systems is a result of the type of work that must be performed during the system upgrade construction. During a lighting system upgrade, ceilings are removed and replaced, and overhead wiring is installed and connected to new wall- mounted controls. During an HVAC system upgrade, ceilings are removed and replaced, overhead ductwork and distribution units are installed, and control wiring is run between overhead units and wall-mounted thermostats. If lighting and HVAC system upgrades are not performed at the same time, many of the construction demolition and replacement tasks must be performed twice.

A third interconnection is relatively new and is increasing in importance as facility executives move towards interoperability in building automation systems. In the past, lighting and HVAC systems were treated as independent systems despite their energy connection. Neither system could communicate with or share operating information with the other.

New building automation system designs are replacing these independent control systems with ones that are fully interoperable. In an interoperable system, conditions and control actions in one system can be shared with other components in the building automation system. For example, when the lighting system's occupancy sensors determine that a space is unoccupied and turn off the lighting system, a signal can be sent to the HVAC system directing it to reduce the airflow to that space to a minimum setting.

By performing the upgrades to the lighting and HVAC systems at the same time, facility executives can take advantage of opportunities arising from these interconnections, opportunities to further improve system performance while reducing energy use. Unfortunately, when upgraded separately, many of these opportunities are not available.

Paying for Upgrades

Upgrading lighting and HVAC systems generally is an expensive undertaking. While most well-designed and properly implemented system upgrades will pay for themselves through energy savings in five to eight years, depending on the scope of the upgrade, not all organizations can afford to pay for the upgrades up front. Rather than cut back the scope of the upgrade project, facility executives have the option of entering into a performance contract with an energy service organization.

The concept of an energy performance contract is straightforward. An outside contractor, vendor or utility pays for the energy upgrade up front, and recovers its investment over a set period of time by being paid back from the energy cost savings generated by the upgrade. There are two basic types of energy performance contracts: guaranteed savings and shared savings.

Types of Contracts

The guaranteed savings contract establishes a fixed level of energy savings from which the contractor will be reimbursed for expenses. If the energy modifications fail to achieve this guaranteed level of energy savings, the contractor absorbs the loss. If the level of savings exceeds the guaranteed level, the facility keeps the difference. Guaranteed savings contracts tend to be used more on long-term, high-dollar projects when the facility executives wants to minimize risks to the facility.

The shared savings contract establishes how the energy savings produced by the system upgrades will be divided between the contractor and the facility. How the savings are split between the contractor and facility varies from contract to contract, but most set the split at a given rate, such as 50-50 or 30-70. Shared savings contracts are more commonly used in short-term, low-dollar projects.

Energy performance contracts offer a number of advantages. Facilities do not have to invest capital up front to implement system upgrades. Regardless of the initial cost, entire upgrade programs can be implemented quickly. Both the guaranteed savings and the shared savings contracts generate a positive cash flow from their initiation. Facilities do not have to carry debt as a result of the upgrade.

They do, however, have their challenges. Energy performance contracts are more complex than other contracts, particularly if the process is being bid. All will include early termination penalties that levy costs against the facility in the event that the contract is terminated early. But the biggest challenge and the biggest risk of performance contracts comes from projecting future energy use for the facility based on its historical use. To do this, a baseline must be established. Energy use data must be collected for a three- to five-year period and normalized to correct for such factors as variations in weather, area changes within the facility, changes in use of the facility and past energy conservation efforts. Without this normalized baseline data, facility executives would not be able to determine the savings that are the result of contractor's upgrades.

Finally, facility executives must carefully evaluate both the contractor and the upgrades the contractor is proposing to perform to determine that the energy savings will not come at the expense of a quality working environment for building occupants or the long-term health of the facility and its systems.




Julian Arhire is a Manager with DtiCorp.com - DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Tuesday, June 21, 2011

The Elements Of An Efficient HVAC System

Today's systems are designed to meet stricter environmental, indoor air quality and user requirements. Many of the gains in HVAC system efficiency have come as the result of improvements in the operating efficiency of key system components. Other gains are the result of the use of technologies that are either new, or new to the HVAC field. Even the use of computer-aided design tools have helped system engineers design HVAC systems that perform more efficiently.

Although there are many individual advances that have helped to improve HVAC system operating efficiency, much of the overall improvement can be attributed to five key factors:

- The development of low kW/ton chillers;

- The use of high-efficiency boiler control systems;

- The application of direct digital control (DDC) systems;

- The use of energy-efficient motors; and,

- The matching of variable frequency drives to pump, fan and chiller motors.

For years, building owners were satisfied with the performance and efficiencies of chillers that operated in the range of 0.8 to 0.9 kW/ton when new. As they age, actual operating efficiencies fall to more than 1.0 kW/ton at full load.

Today, new chillers are being installed with full load-rated efficiencies of 0.50 kW/ton, a near 50 percent increase. Equally impressive are the part-load efficiencies of the new generation of chillers. Although the operating efficiency of nearly all older chillers rapidly falls off with decreased load, the operating efficiency of new chillers does not drop off nearly as quickly.

Chiller design changes

Several design and operation changes have helped improve chiller performance. To improve the heat transfer characteristics of the chillers, manufacturers have increased the size of the units' heat exchangers. Electromechanical control systems have been replaced by microprocessor-based electronic controls that provide greater precision, reliability and flexibility. Variable frequency drives control the speed of the compressor, resulting in an increase in part-load performance.

Increased energy efficiency is not the only benefit of the new generation of building chillers; these chillers offer better refrigerant containment. Although older chillers routinely may have lost 10 percent to 15 percent of the refrigerant charge per year, new chillers can limit losses to less than 0.5 percent. Lower leak rates and better purge systems reduce the quantity of non-condensable gasses found in the refrigerant system -- a key factor in maintaining chiller performance over time.

Another significant development is in boiler operation: the replacement of pneumatic and manual controls with microprocessor-based systems. As a rule of thumb, the systems can be expected to achieve energy savings of 5 percent to 7 percent over conventional pneumatic-based systems.

Microprocessor-based control systems achieve their savings primarily as the result of their ability to modulate the boiler's operation more accurately than pneumatic-based systems. By modulating the boiler's operation accurately, the systems help to maintain the proper fuel-to-air ratio and track the load placed on the boiler by the HVAC system.

Microprocessor-based systems offer several additional advantages, including remote monitoring and operating capabilities, automated control sequences, monitoring of steam flow, and reduced maintenance costs. One way the systems can help reduce maintenance costs is through their ability to maintain proper fuel-to-air ratio. By maintaining the proper ratio, the systems reduce the rate at which soot collects on boiler tubes, thus decreasing the frequency of required tear down and cleaning. Keeping the boiler tubes clean of soot also helps to improve the thermal efficiency of the boiler.

Direct digital controls

A major change in the HVAC field is the widespread implementation of direct digital controls (DDC). Introduced more than 15 years ago, DDC systems have become the industry standard for control systems design today. With the ability to provide accurate and precise control of temperature and air and water flows, the systems have widely replaced pneumatic and electric control systems.

DDC systems help building owners save energy in several ways. Their accuracy and precision nearly eliminate the control problems of offset, overshoot, and hunting commonly found in pneumatic systems, resulting in better regulation of the system. Their ability to respond to a nearly unlimited range of sensors results in better coordinated control activities. This also allows the systems to perform more complex control strategies than could be performed with pneumatic controls. Finally, their simple or automatic calibration ensures that the control systems will perform as designed over time, with little or no loss of accuracy.

DDC systems also offer several other advantages. Because the control strategies are software-based, the systems can be easily modified to match changes in occupant requirements without costly hardware changes. DDC systems also are ideal for applications that benefit from remote monitoring and operation.

Energy-efficient motors

Today's HVAC systems are making use of energy-efficient motors. Energy-efficient motors offer a moderate but significant increase in full-load operating efficiency over standard motor designs. For example, an energy-efficient 10 hp motor operates at about 93 percent efficiency; a standard motor of the same size is typically rated at 88 percent. Similarly, a 50 hp energy-efficient motor is rated at approximately 94 percent efficiency in contrast to the 90 percent efficiency rating of a 50 hp standard motor.

This increase in operating efficiency accompanies a first-cost increase for the motors. How rapidly this additional first cost is recovered depends on two factors: the loading of the motor, and the number of hours the motor is operated per year.

The closer the motor is operated to its full-load rating and the greater the number of hours per year the motor is operated, the quicker the first-cost differential is recovered. For most applications where the motor is run continuously at or near full load, the payback period for the additional first cost is typically between three and six months.

The combination of constant loading and long hours of operation have made HVAC applications well-suited for the use of energy-efficient motors. Energy-efficient motors commonly are found driving centrifugal circulation pumps and system fans. With these loads, the 4 percent or 5 percent increase in the electrical efficiency of the drive motor translates to a significant energy savings, particularly when the systems operate 24 hours per day, year round.

A side benefit of energy-efficient motor design is its higher power factor. Increasing the power factor of a drive motor reduces the current draw on the electrical system, frees additional distribution capacity and reduces distribution losses in the system. Although increasing the power factor isn't enough of a benefit to justify the cost differential of the higher efficiency motor, it's an important consideration, particularly for large users of electricity where system capacity is limited.

Although the motors have demonstrated themselves to be very cost-effective in new applications, their use in existing applications is a little more difficult to justify. In most instances, the cost to replace an existing, operating motor with one of higher efficiency will not be recovered for five to 10 years or longer.

Of the improvements in HVAC systems that have helped to increase operating efficiency, variable frequency drives have had the most dramatic results. Applied to system components ranging from fans to chillers, the drives have demonstrated themselves to be very successful in reducing system energy requirements during part-load operation. And with most systems operating at part-load capacities 90 percent or more of the time, the energy savings produced by variable frequency drives rapidly recover their investment, typically within one to two years.

In general, the larger the motor, the greater the savings. As a rule of thumb, nearly any HVAC system motor 20 hp and larger can benefit from the installation of a variable frequency drive.

Variable frequency drive applications

Variable frequency drives produce their savings by varying the frequency and voltage of the motor's electrical supply. This variation is used to reduce the operating speed of the equipment it controls to match the load requirements. At reduced operating speed, the power draw of the drive motor drops off rapidly.


For example, a centrifugal fan, when operated at 75 percent flow, draws only about 40 percent of full-load power. At 50 percent flow, the power requirement for the fan decreases to less than 15 percent of full-load power. While conventional control systems, such as damper or vane control, also reduce the energy requirements at partial flow, the savings are significantly less.

Another area where variable frequency drives have improved the operating efficiency of an HVAC system is with centrifugal pumps found in hot and chilled water circulation systems. Typically, these pumps supply a constant flow of water to terminal units. As the demand for heating or cooling water decreases, the control valves at the terminal units throttle back. To keep the pressure in the system constant, a bypass valve between the supply and return systems opens. With the flow rate remaining nearly constant, the load on the pump's electric drive also remains nearly constant.

Variable frequency drives regulate the pressure in the system in response to varying demands by slowing the pump. As with centrifugal fans, the power required by the pumps falls off as the load and speed are decreased. Again, because most systems operate well below design capacity 90 percent of the time, the savings produced by reduced speed operation are significant, typically recovering the cost of the unit in one to two years.

Chiller loads

A third application for variable frequency drives is centrifugal chillers. Chillers are sized for peak cooling loads, although these loads occur only a few hours per year.

With conventional control systems that close vanes on the chiller inlet, chiller efficiency falls off significantly during part-load operation. When variable frequency drives are applied to these chillers, they regulate the operation of the chiller by reducing the speed of the compressor. The result is near full-load operating efficiency over a very wide range of cooling loads. This increase in part-load efficiency translates into a 15 percent to 20 percent increase in the chiller's seasonal efficiency.

Energy conservation isn't the only benefit of variable frequency drives. A strain is placed on an electric motor and the mechanical system it drives every time a pump, fan or chiller is started at full-line voltage: Motor winding becomes heated, belts slip, drive chains stretch and high-pressure is developed in circulation systems. Variable frequency drives reduce these stresses by starting systems at reduced voltages and frequencies in a soft start, resulting in increased motor and equipment life.

Finally, the most important element in an energy-efficient HVAC system is how the system is operated. No matter how sophisticated the system, or how extensive its energy-conserving features, the system's performance depends upon the way in which it's operated and maintained. Operating personnel must be properly trained in how best to use the system and its features. Maintenance personnel must be trained and equipped with the proper tools to keep the system operating in the way it was designed. Maintenance cannot be deferred.

Energy-efficient HVAC systems offer the facility manager the ability to improve system performance while reducing energy requirements. But they benefit building owners only as long as they are taken care of. If facility managers choose to ignore maintenance requirements, they may soon find systems malfunctioning to the point where they have actually increased the requirement for energy.



Julian Arhire is a Manager with DtiCorp.com - DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Wednesday, June 8, 2011

Travaux de Construction de plancher comment Accueil

Parfois, un recouvrement de béton est installé sur le sous-plancher, afin de permettre l'installation de carreaux ou de tuyaux de chauffage par rayonnement du plancher. C'est grâce à cette Assemblée que les conduits de système à air pulsé seront installés, ainsi que divers plomberie et des lignes électriques.

Structure de plancher


Il y a trois principaux types de structures de plancher, généralement utilisés dans les constructions modernes. Citons encadrée, planchers de treillis et fabriqué des systèmes solive.


De tous, le plus souvent installé flooring system sont encadrées de planchers. Elles se composent de bois accèdes, portant sur la charge intérieure et extérieure portant les murs ou les poutres appelés « solives de plancher ». Généralement, les solives de plancher sont installés, espacées de 16 “apart. Installation de rim et régleur solives, dont les solives de plancher sont clouées, termine le périmètre. Calage, habituellement sous la forme de transition, mais souvent installé comme feuillard, empêche les solives de tourner en place. Une autre méthode utilisée pour prévenir ce type de tournage est pour coller le sub-flooring aux solives, comme le sous-plancher est placé. Tous les solives doivent s’étendre au moins 1-1/2 “à un ensemble de palier, d’un faisceau ou mur pleine hauteur, à moins que des cintres métalliques sont installés de fournir un soutien de roulement appropriée contre les autres composants structuraux. Poutres, qui prend en charge les solives de plancher pendant plus longues, sont construites dans la forme des solives feuilletés souvent appelés bâtie de poutres ou un morceau de charge solide portant des poutres, coupé de billes ou fabriqué. Électriciens et plombier peuvent souvent coupés ou percer le travail de solives pour installer les utilitaires, et cela est accepté, pour autant qu’ils ne retirez pas le matériau plus que ce qui est requis par les codes. Ce type de système de plancher est habituellement le moins cher à installer.


Poutrelle planchers sont simplement que. Ils sont construits à partir de petit bois accèdes, reliés entre eux selon un schéma webwork par l’utilisation de plaques de métalliques ou de bois. Parfois, les fermes seront construits sur le site, utilisant des plaques de contreplaqué à connecter le webwork ensemble. Généralement ils sont installés à part, de 24 “soit suspendue sur portant les murs ou les poutres, soit installé avec garniture de contreplaqué ou solives de rim autour du périmètre. Feuillard est installé sur le côté de fond, pour éviter de tourner en place, qui est une maladie courante pour les composants de la poutrelle profonde. Dans le cas des travaux de poutrelle longtemps span, roulement longueurs d’au moins 3 “sont monnaie courantes. Fermes s’étendent sur plus grandes distances que les assemblys étage encadrée et peuvent être conçus pour couvrir tout le bâtiment, éliminant les supports de charge center. Sont modérément plus chers que les assemblys étage encadrée, ils fournissent un plancher remarquablement solide avec peu de déviation ou « bounce » à elle. Un autre avantage de ce type de système structurel, est que les installations de l’utilitaire peuvent être exécutées entre les composantes webwork. Ne laissez jamais les métiers de couper ou de percer les membres d’une poutrelle, car ils sont fabriqués avec précision pour les conditions de chargement ils subiront durant la vie du bâtiment.



La solive manufacturée, qui est un produit relativement nouveau, est souvent fabriquée à partir de matériaux faible coût sous la forme d’un I faisceau, semblable à poutres d’acier en grands bâtiments. Ce que cela signifie, c’est que la solive est construite avec un haut plus épais et le bord inférieur et l’aspenite généralement entrelacé verticalement couvrant entre les deux. Ces systèmes sont très forts, souvent capables de s’étendant sur toute la largeur du bâtiment. Un inconvénient est que ce type de sol nécessite des systèmes hanger spécial conçus pour les solives, pour leur permettre d’être accrochés les uns des autres ou à l’encontre des poutres/roulement murs. Solives manufacturés deviennent un système de planchers populaire, car ils sont relativement bon marchés, de réduire le temps de travail et fournir un soutien adéquat. Cependant, constructeurs ont besoin de se familiariser avec ses installations, pour mauvaise installation peut causer de graves dommages structurels aux solives. Un bon exemple est un point, le centre portant solives, à gauche avec la membrure supérieure non coupée, qui peuvent potentiellement échouer ou déchirer, au-dessus du Centre portant le point trois.


Sub-Floors


Il existe trois types principaux de sub-flooring installé à couvrir et s’étendent sur la structure de la parole. C’est sur ce que la parole finie sera placée. Les types de sub-flooring comprennent revêtement raw, complémentaires et bande. Il est utilisé non seulement de fournir qu’une surface pour l’intérieur se termine à figurer sur, mais aussi pour empêcher la torsion ou couple forces placé sur le bâtiment. Le sous-plancher autorise également la charge partage au sein du système de cadrage solive. Souvent le sub-flooring est collé à le Å“uvre de solives pour éliminer les planchers vieillotte et d’empêcher les solives de plancher de tournage.



Revêtement RAW vient en 4 « x 8 » feuilles, plus souvent installés comme 3/4 “panneaux de contreplaqué épais. Ce type de revêtement est suffisant pour s’étendant sur solives travail espacées jusqu’à 24 “d’apart. Le revêtement est lain avec les articulations décalées dans une telle affaire, qu’aucun joints deux edge n’aligner avec des feuilles adjacentes. Il est très facile à installer, nécessitant le moins de travail. Les feuilles sont attachées avec soit 1-1/2 “vis de revêtements de sol, ou 2-1/2″ clous, espacés environ 8 “d’apart. Bien que non requis, c’est une bonne idée de fournir des bailleurs de fonds ou prend en charge sous les articulations, entre les feuilles qui vont perpendiculaires à l’Assemblée de l’étage encadrée.



Plus couramment installé sont emboîtement des panneaux de revêtement. Ce type de revêtement est généralement 5/8 “épais et fabriqué en contreplaqué ou aspenite (communément appelé « agglomérés ») en 4 « x 8 » feuilles. Les feuilles sont livrés avec les arêtes longues conçus pour de verrouillage avec une langue sur un côté et un bosquet sur le bord opposé. Ils sont installés par simplement poussant ou bat la chamade ensemble, les feuilles et clouer ou leur vissage des travaux des solives, de la même manière comme revêtement raw. C’est souvent le moins cher à installer.
Dépouiller les planchers, étaient autrefois le type le plus populaire de sous-plancher installé. Mais avec l’introduction de produits manufacturés de revêtement, elle a devenir moins utilisé. Planchers de bande se composent de 1 “par les conseils” de 6 ou 8 “, placés en diagonale sur le système de cadrage solive étage. Il est légèrement plus cher à installer et nécessite des artisans chevronnés. Pour installer correctement ces étages, le bois doit être non-four séché, avec une teneur en humidité relativement élevé. Cela peut sembler étrange, mais en réalité, comme le bois s’assèche, qu’elle va se réduire. Cette action qui rétrécit rassemble la parole, ajout de résistance à l’ensemble du système. Les avantages de ce type de sous-plancher sont sa force et la durabilité. Un important à noter, les propriétaires sont souvent perturbés par les petits 1/4 “lacunes large, généralement laissé entre les planches individuelles après que le bois s’assèche. Bien que troublant de voir pendant la construction, à la fin, les espaces ne sont pas perceptibles et vraiment n’ont aucun impact sur les composants de sous-plancher du tout. Les planchers de bande sont conçus pour être interverrouillage, par le biais de tours de piste ou de l’espacement des articulations.



Fini les planchers


Ah la parole finie, ce que nous voyons et marcher sur tous les jours. Pour les propriétaires, cela tend à être l’un des aspects plus importants du système étage. Oui, la structure est un examen, mais l’apparence et la texture de la parole est ce que tout cela sera visible après l’achevée de la construction. Le plus souvent installé étage comprennent des finitions : feuille de vinyle, carreaux de vinyle, carreaux de céramique, bande de bois, parquet bois et tapis.


Plus communément utilisé dans les salles de bains, cuisines, les buanderies et les entrées sont feuille de vinyle ou de revêtements de sol de linoléum.Ce type de revêtement de sol cônes dans une vaste gamme de couleurs, de textures et de patrons, en tailles de feuille de 12 pieds de largeur avec diverses longueurs et fabriqué à partir d’un composite de vinyle, recouvert d’un revêtement de surface. Il est installé en appliquant plus de sous-plancher, habituellement acajou ou particule core feuilles 4 « x 4 » en taille, à laquelle le vinyle est collé à le. Il peut également être installé directement sur les planchers en béton, dans des domaines tels que les sous-sols. Se réunissant les deux feuilles est une pratique standard lorsque la largeur de la pièce dépasse 12′, ou sous les portes. Vinyle feuille est un revêtement de sol bon dans les régions où l’eau a tendance à s’accumuler, comme autour de luminaires de salle de bain ou moyens d’entrée. Il est assez durable et souvent entretien gratuit. Linoléum est un des types de revêtement de sol pour installer moins chers.


Une autre bonne planchers pour les zones humides est le carreaux de vinyle. Généralement il est fabriqué de la même manière comme vinyle de la feuille, mais est beaucoup plus rigide et vient comme 12 « x 12 » carré unités. Ils sont installés dans beaucoup de la même façon, mais exigent des hommes de métier qualifiés, familiers avec installation appropriée. Un bon programme d’installation commencera à partir du milieu de la salle pour s’assurer que tous les carreaux coupés est égaux en largeur à s’opposer les murs. Un des avantages de ce type de revêtement de sol, sur vinyle de feuille, sont qu’il est peut être installé sans danger de séparation conjointe, sur de grandes surfaces. Pour cette raison, il est souvent utilisé dans les bâtiments commerciaux où les grandes chambres sont la norme. Carreaux de vinyle peut être facilement installé directement sur les planchers en béton. Comme les feuilles de vinyle, il trop est résistant à l’eau et tend à être installés dans les zones d’un bâtiment, sujets à l’accumulation de l’eau. Tuile, peuvent être facilement nettoyées, est relativement libre de maintenance, et un de la moins chère fini planchers pour installer.



Carreaux de céramique est probablement les plus durables types de revêtement de sol et est généralement installé dans les zones d’entrée, où le sables accumulations effleurage et l’eau sont la norme. Salles de bains et cuisines souvent obtenir ce type de traitement de plancher ainsi, mais en raison de la cherté de l’installation, les propriétaires ont tendance à ne pas de ces domaines. Carreaux de céramique sont généralement une tuile carrée, bien que les unités imbriquées sont sur le marché, dans les mesures standards de carrés de 4 “, 6″, “de 8 ou 12″. Ils sont installés par l’une des deux méthodes principales, soit définie dans un mortier mince lit (appelé « thinset adhésif »), qui agit également comme colle ou un lit corpulence de mortier normal de 1-1/2 “base. Pour tous les carreaux de céramique, la parole doit être construite à afin d’assurer la solidité nécessaire pour empêcher les tuiles ou craquage conjointe. Souvent, les installateurs mater un matériau appelé « ciment Conseil », qui s’apparente de cloisons sèches, mais est faite de ciment et de fibres de verre. En tout cas, s’assurer que votre installateur vous offrira une garantie contre la fissuration future ou de soulèvement de tuiles. Carreaux de céramique exigent peu d’entretien, mais attention, de l’eau sur plancher sur papier glacé tuiles peuvent être très glissantes, et nombreux un temps, un propriétaire a ressentiment l’installation d’un carreau de haute brillance, sur une superficie de plancher de salle de bain.



Plancher de bois nu est un des plus anciens types de planchers toujours populaire dans l’ère moderne. Il se compose de bandes de bois, habituellement interverrouillage, qui sont clouées ou collés sur le sous-plancher. Souvent, les bandes seront préfinis, n’exigeant aucune demande de poste de chasseurs de phoques ou de vernis. Ce type de revêtement de sol est très main-d’Å“uvre pour l’installation, ainsi qu’étant assez cher à l’achat. Cependant, les résultats sont une surface de plancher chaud, durable, nécessitant peu de maintenance ou d’entretien. Plancher de bois nu significativement ajoute à la résistance du système de soutien, réduisant la déflexion (”bounce”) et donne la parole une sensation très solide pour elle.
De tous les planchers de bois, le plus souvent installé est la tuile de parquet. Elles se composent de carrés imbriqués bandes bois, maintenues ensemble avec les colles ou de fils métalliques. Ils viennent souvent comme unique 6 « x 6 », ou multiples 12 « x 12 » carreaux carrés, environ 1/4 po d’épaisseur. Ils sont collés directement à la sub-flooring et sont assez forts pour s’étendent sur petites déviations dedans. Le bois est souvent préfini et nécessite peu d’entretien. Parquets sont une alternative moins chère à dépouiller les planchers, offrant la même surface chaude et durable.


Tapis est probablement la parole plus commune couvrant qui est utilisée dans les habitations résidentielles. Il s’agit dans une grande variété de couleurs et de textures. Tapis se compose de fibres tissées, qui font saillie vers le haut, collés ou tissé une mousse ou le support en jute. Souvent une thibaude de mousse pressé est installé en dessous ou le soutien peut être intégral avec le tapis, ajoutant à la douceur et prévoyant la marche sur une surface beaucoup plus confortable. Tapis est installé en soit collant le tapis pour le sous-plancher, ou l’utilisation de tapis tack autour du périmètre. Un bon tapis sera a une armure étroite, qui ne montrera pas le matériel de soutien lorsque séparées. Pour réduire les coûts de projet, certains entrepreneurs optera pour installer une sous-couche de haute qualité, avec un tapis de qualité faible ou moyen. Ceci fournit la surface molle, durabilité égale, donnant au propriétaire les avantages d’un tapis de haute qualité, à un prix réduit.



Julian Arhire est un gestionnaire de DtiCorp.com – http://www.DtiCorp.com transporte plus de 35,000 produits de CVC, y compris les pièces industrielles, commerciales et résidentielles et du matériel de Honeywell, Johnson Controls, multidisciplinaire, Luijben, Grundfos, Armstrong et plus encore.

Sanitär-Installationen vereinfacht

Utility services


Es gibt zwei Unterteilungen in moderne Sanitärtechnik erforderlichen Dienstprogramm Dienstleistungen. Sie umfassen die Lieferung von Süßwasser (genannt “Trinkwasser”), und die Beseitigung von Abwasser.


Die Lieferung von frischem Wasser kommt aus zwei primären Diensttypen. Wenn Sie in einem lokalen befinden, Wasserleitungen installiert sind, würden Sie eine direkte Verbindung zu den Townships Wasser Linien installieren. In ländlichen Orten jedoch müssen Sie ein gut Typsystem verwenden. In beiden Fällen ist es wichtig, Sie exterior Versorgungsleitungen mindestens 4′ unterhalb der Grundlinie auszuführen. Dadurch wird sichergestellt, dass das Wasser in den Rohren bei kalten Wetter nicht einfrieren wird. Die meisten Installationen mit kupferner Röhre abgeschlossen sind, aber mehr und mehr Häuser entscheiden sich für die Installation von CPVC Rohrleitungen, da die Kosten für die Installation ist stetig nach unten.


Um eine direkte Verbindung herstellen, der Wasser-Linie unter der Stiftung Wand herausgebracht, und mit verbunden ist eine Abschaltung, durch die lokale Bereitstellung Gemeinde installiert. Einige Townships erfordert die Installation von einem Meter Wasser zur präzisen Bestimmung die Menge des Wassers, die Sie, für die Abrechnung nutzen.


Nun gibt Typsysteme einfach ein Loch, gegraben oder gebohrt in die Erde, in denen Wasser sammelt. Dieser Systeme erfordert der Verwendung einer Wasser-Pumpe Wasser vom unteren Rand der gut, in das Haus zu verschieben. Im Inneren des Hauses ist eine automatisierte Steuerelement, das den Druck des bereitgestellten Wassers regelt. Mit diesem System verbunden ist auch ein Drucktank, das Wasser unter Druck, für sofortig Gebrauch zu halten soll. Es ist wichtig, beachten, dass je größer der Drucktank, die weniger Datenmenge Druck Differential oder “wogende”, die Versorgung haben werden.



Zitze-Brunnen sind nicht eine der beliebtesten Arten von Systemen. Zwar billiger zu installieren und zu betreiben, sie tendenziell anfällig für austrocknen, und haben oft höhere bakterielle. Sie sind einfach ein Loch, gegraben unten unter dem Wasser-Tisch, mit der Unterseite mit etwa 12 “von Schotter und Wänden Fertigbeton, konkrete gut Rohrleitungen gefüllt.


Gebohrte Brunnen sind ziemlich viel teurer und erfordern besondere Ausrüstung zu installieren. Sie sind eine mehr konstante Versorgung mit gratis Wasser frisch Bakterien. Sie sind mit großen Bohren Ausrüstung, installiert, die in den Boden unter dem Wasser-Tisch von etwa zwanzig Meter bohrt. Das Loch, das was übrig bleibt hat dann eine lange Stahl-Leitung eingefügt, die Oberfläche Run off und Höhlenforschung in der obersten Böden zu verhindern.


Wasser Abfall ist das Abwasser, das von der senken, Toiletten, Badewannen, Wäscherei-Möglichkeiten und andere Abflüsse befindet sich in ein Heim ins Meer gelangt ist. Diese Arten von Rohrleitungen Installationen werden die Linien “Sanitär Abfälle” genannt. Wenn Sie in eine Gemeinde sind die Kanalisation Dienstleistungen anbietet, werden Sie wahrscheinlich eine direkte Verbindung installieren. In ländlichen Gebieten, wo die Kanal-Linien nicht verfügbar sind, ist eine septische oder halten die einzige Option. In beiden Fällen wird eine große Durchmesser-Leitung, in der Regel 4 “bis 6″ Durchmesser, zwei bis vier Meter unter Grade, es verhindern, Einfrieren installiert. Diese Pfeife verläuft von der Stiftung nach der septischen System oder Kanalisation Linie. In den meisten Fällen das Abwasser fließt die Abfälle handling-Systeme durch die Schwerkraft, aber manchmal eine Pumpe möglicherweise erforderlich, es wird erwartet, dass die Abfälle bergauf ausführen.


Direkte Verbindungen zu kommunalem bereitgestellten Kanal-Linien sind relativ einfach. Das Abflußrohr installiert ist die Menge an, die die Gemeinde den bereitgestellten Dienst in der Regel bis zu holen. Diese Verbindung ist Meerenge nach vorn, als es installiert ist, indem unterhalb der Frostgrenze Graben, und neigen die Pipe auf die Verbindung.


Im ländlichen Raum ist die häufigste Installation der septischen System. Es besteht aus ist ein wichtigsten septischen Tank, an den die sanitäre Gebäude-Drain angeschlossen ist. Von diesem verteilt ein Netz von Rohrleitungen flüssige Abfälle, die über ein großes Gebiet in den Boden verstreut ist. Den Haupttank fungiert als biologisch Aufschlüsselung der feste durch die Verwendung von Hitze und Bakterien Abfälle. Die Rohrleitungen ist in zwei Arten von Systemen, einem weinenden Bett und einem geraden Bett installiert. Der weinende Bead basiert von speziellen Sands, deren Handeln zu verteilen und zu halten, dass Bakterien und Abwasser, weiter den Aufschlüsselung Prozess erhöhen. Gerade Betten sind einfach Gräben gegraben, in denen die weinende Kachel ist über eine Kies-Basis gelegt. Auf jeden Fall erklären das Umweltministerium welche Art von septischen System zu installieren, und wo es installiert Ihnen. Denken Sie daran, suchen Sie Ihre septische System einer fairen Entfernung von Wells oder Wasser-Vorräte, die Sie installiert haben, können.



Eine andere Art des Systems, in ländlichen Gebieten, eingesetzt ist die Fäkalientank. Dies ist die einfachste der Systeme, dass es nur ein großer Tank, an den die sanitäre Drain, mit keinen Abfluss angeschlossen ist. Der größte Nachteil, diese Art der Installation ist, dass der Tank in regelmäßigen Abständen (ca. einmal pro Monat), gepumpt werden für die Entfernung zu einer zertifizierten Entsorgung-Website muss. Der einzige Vorteil für diese Art des Systems ist seine niedrige Kosten der Erstinstallation. Wartungsgebühren für das Pumpen kann so hoch wie $800,00 pro Jahr.


Interior Sondieren von Dienstleistungen


Die interior Klempnerarbeiten verteilen trinkbares Wasser und Abwasser durch ein Netz von Rohrleitungen befindet sich innerhalb des Gebäudes zu sammeln. Auch werden in diesem Dienst die von sanitärtechnischen Armaturen, wie Toiletten, Wannen und Waschbecken.


Die Rohrleitungen im Gebäude ist in zwei Unterteilungen, die Versorgungsleitungen und die Drain-Linien.


Die Versorgungsleitungen tragen Süßwasser zu den alle Lampen im Haus genutzt. Die Rohrleitungen wird in der Regel mit kupferner Röhre installiert, aber oft CPVC genutzt wird. Dieser Teil des Systems ist unter Druck das Wasser durch das System in der Regel bei ungefähr fünfzig zu neunzig Psi schieben. Das System wird in der Regel ein wichtigsten Abschaltung die kann deaktivieren das Wasser im gesamten Haus, und befindet sich enthalten waren die Zeile Dienstprogramm betritt das Gebäude. Es ist auch eine gute Idee, den Klempner Shut-Offs bei jeder Leuchte, damit für schnelle und einfache Reparatur, ohne zu deaktivieren die gesamte Versorgung des Gebäudes installiert haben.


Die Drain-Linien tragen die Abwässer vom interior Vorrichtungen und Kanalisation durch größere Durchmesser-Rohrleitungen. Diese Rohrverlegung ist in der Regel installiert ABS oder schwarz Kunststoff Linien, die zusammen geklebt werden. Abfall Wasser Linien sind rein Schwerkraft gefüttert, also es wichtig für Installateure ist weiterhin bestimmte Hang zu allen Sanitär Zeilen, um Abfall wird vom die Rohrleitungen zu gewährleisten. Jede Leuchte und Drain, eine Art von Wassersicherheitsverschluß installiert ist (eine “P” Trap genannt), die ist einfach ein Ort in der Wasser sitzen wird, um im Laufe der Kanalisation Gase in das Haus zu verhindern,. Auch, erfordert jede Leuchte ein Lueftung befindet sich auf der Kanal die Wasser fallen, um zu verhindern, dass die Linien Entwässerung vollständig aufgrund von Abzweigung Aktion. Dieses Belüftungssystem Subsystem zeichnet Luft aus einem Rohr, das durch das Dach des Gebäudes aufgewachsen ist. Durch die Grundlagencode beschloss, wird P-Traps und richtigen Entlüftung in allen Installationen benötigt.


Die interior Befestigungen sind die Elemente, die für ihren Betrieb Wasser verwenden. Dazu gehören Toiletten, Spülbecken, Wannen, Wäscherei-Möglichkeiten, Geschirrspüler, Warmwasserspeicher und manchmal Kühlschränke oder Öfen. Die meisten Spiele kommen in einer Vielzahl von Farben und Texturen, obwohl standard im Design. Ein gutes Beispiel dafür ist die Badewanne, die in drei wichtigsten Größen, fünf, fünfeinhalb und sechs Füße lang, mit einem standard Tiefe und Breite gekauft werden kann. Haus-und Wohnungseigentümer sind wegen dieser Art der Standardisierung und Voraussetzung für rechtliche Genehmigungen vor dem Verkauf aus armen Designs oder unbrauchbar Produkte geschützt. Alle Spiele mit Kanalisation verbunden sind, und die meisten heiße und kalte Verbindungen erfordern.



Heißes Wasser wird von einer großen Tank, geliefert, die erwärmt und speichert genügend Wasser für den Einsatz im Gebäude. Dieser Tank wird von einer Vielzahl von Energiequellen, einschließlich Strom, Öl, Propan oder Erdgas, betrieben und befindet sich nahe dem Eingang Service. Ein allgemeines Problem mit Vorrichtungen ist die Temperaturschwankung verursacht durch Verwendung der mehr als eine solche Vorrichtung auf einmal. Am deutlichsten ist ein Duschen Temperaturanstieg um, wenn eine Toilette geleert wird. Es gibt zwei Mittel zur Lösung dieses Problems. Die erste nutzt eine Druckregulierung Wasserhahn, die automatisch den Druck von beiden Versorgungsleitungen gleicht. Die zweite ist eine einfachere Lösung, in der die Toiletten mit Service Eingang, vor dem Anschluss an andere Vorrichtungen, einschließlich der Warmwasserbereiter verbunden sind.


Julian Arhire is a Manager with DtiCorp.com - DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Sunday, May 22, 2011

Revenue Productivity For HVAC Businesses

Revenue productivity is lost daily due to several factors such as poor scheduling, excessive drive-time, techs waiting around for calls, disorganization, wasted time with parts pick-up, techs not billing correctly and a host of other issues. Knowing and charging the correct rates will impact your revenue and increase your bottom-line.

Many HVAC (Heating, Ventilating, and Air Conditioning) companies put in place systematic approaches to overcome the loss of billing time, and in the end most find it hard to keep a full-court press on due to a lack in manpower or just plain lack of focus. But in all the systems that are implemented and tested one huge approach is almost always overlooked - pricing.

It is clear that poor revenue for your HVAC (Heating, Ventilating, and Air Conditioning) business contributes to poor profit performance, but it is the linkage of poor revenue and improper pricing that makes it disastrous for your HVAC (Heating, Ventilating, and Air Conditioning) business. Poor revenue coupled with improper pricing leads to cash flow problems which creates a waterfall of other problems that can lead to business shut-down.

As stated in the opening, addressing revenue productivity is a critical factor for your HVAC (Heating, Ventilating, and Air Conditioning) business.

Simply defined, revenue is calculated by dividing the number of hours billed by the number of hours paid and showing the result as a percentage. Look at the below examples:

4 Hours Billed ÷ 8 Hours Paid =.5 or 50%

25 Hours Billed ÷ 40 Hours Paid =.625 or 62.5%

92 Hours Billed ÷ 160 Hours Paid =.575 or 57.5%

Industry data shows that the average HVAC (Heating, Ventilating, and Air Conditioning) company's revenue productivity is below 50%.

Think about this: your billable hourly rate is $70, your technicians productivity is 50%, you pay him 8 hours for the day. This effectively drops down your hourly rate to $35 against the 8 hours paid.

$70 Hourly Rate x.5 or 50% Productivity = $35 Hourly Rate

Once you know what your revenue for HVAC business is you need to revisit your pricing to determine if your rates are right for your business. Choosing the correct hourly rate will overcome poor revenue performance for HVAC business, help produce positive cash flow and increase your profits from the opportunities you have and the work you do.

$140 Hourly Rate x.5 or 50% Productivity = $70 Hourly Rate

Life is Too Short Not to be Profitable!








DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.


Saturday, May 21, 2011

New HVAC Information For Homeowners


Consistent temperature: Since new homes have a consistent thermal mass and insulation level, measurements have proven that the temperature difference from floor to ceiling in a new home is only about two degrees. Wood framed houses can show a temperature difference of up to eight degrees.

Even temperature: Because of the high thermal mass of concrete (about 5 times that of a conventional wood framed wall), the temperature of a new home is very stable. This means the temperature of the building remains even, instead of overheating when the furnace turns on or getting cold when the air conditioner kicks in.

No cold or hot spots: The uninsulated portion of wood frame walls adds up to about 25% of the total exposed area. The new homes incorporate insulation that is almost completely uninterrupted. This translates to no cool or warm areas you may feel when walking along framed walls in winter or summer.

Fewer drafts: New homes are unlike a wood frame home which is built with rigid pieces that leave thousands of tiny air gaps. Recent studies comparing old constructed wood framed homes with new homes prove that wood frame homes have air losses of close to five times that of homes built with new style walls. Preliminary reports suggest an air loss difference of over twelve times that of new technology.

Indoor Air Quality: Issues associated with declining general health such as asthma, bronchitis and allergies, are significantly reduced or even eliminated in the indoor living environment. Utilizing new air cleaning technology, the indoor air contaminants may be reduced by up to 99%, providing a much more comfortable living environment to the occupants. Considering that much of the population is aging into retirement, so do health concerns, indoor air quality has become a significant factor in modern building construction.

There are four main considerations to indoor air quality that are addressed by the new homes: (1) filtration of contaminants, (2) humidity control, (3) supply of fresh air, and (4) removal of used or stale air. These aspects of air quality need special consideration in modern methods of construction, as the building envelope is almost a perfect seal, effectively performing as a building wrapped in a plastic bag.

Filtration of Contaminants: Utilizing a new air cleaner, new technologies allow the supplied air to be cleaned so effectively, as to remove up to 99% of all the potential contaminants. This includes pollen spores affecting allergies, smoke and chemicals that produce cancers and diseases over long term exposure, as well as larger particles such as dust, which aggravate bronchial passages.

Humidity Control: Key in preventing and providing a more comfortable living environment, it is already known how high humidity environments promote healthy lungs and airways. Typical treatment for respiratory ailments include the use of steam or highly humidified air to aid in the healing and health of an individual. Current methods of home construction do not allow for high levels of humidity, without the associated issues of mold and mildew growth. By utilizing building components which do not support the growth of mold and mildew, and through the use of non-biodegradable components, we can now effectively build a structure which is not only structurally unaffected by high humidity levels, but this type of construction also limits the growth of mold and mildew. In essence, we provide a much more comfortable living environment, without adding undue stress on the structure, which would normally result in major repair considerations after only a few years.

Fresh air supply/Stale air exhaust: Heat recovery technology is simplistic in design, yet highly effective in reducing air change losses while providing proper, not just adequate, air changes. Again the key issue on this is to allow for a much higher indoor air quality and comfort level. Stale air is drawn from the key contaminant areas such as basements, kitchens, laundry rooms and baths. These areas tend to allow contaminants such as smog, smoke, paints, cleaners and other chemicals, combustion gases from appliances and even the offgassing of the components associated with the building process such as carpets or new furniture, which would normally stockpile in these locations.








DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.


Monday, May 16, 2011

10 Steps to Increase Your HVAC Business

All HVAC (Heating, Ventilating, and Air Conditioning) businesses have "profit ability", that is the ability to make a profit. But the ones that make profits have solid profit strategies and practices, coupled with consistent focus on pricing performance.

Step # 1. Maximize Your Current Opportunity by Charging the Correct Price.

• Know all your HVAC costs.

• Have a profit plan.

• Know your break-even (bottom-line price).

• Build value in your offering (sales process).

Most HVAC companies leave money on the table by not having proper control or management of their pricing. Invest some time in the management of your pricing and your bottom-line will soar. Having set prices in place allows you to maximize revenue productivity and your "profit ability", and even helps in deflecting pricing objections.

Step # 2. Maximize Revenue Productivity by Setting Benchmarks for Key Performance Indicators.

• Determine Key Benchmarks that drive business revenues (top & bottom-line).


• What gets measured gets accomplished.

• Expect 50% more from everyone (stretch plan).

• Provide necessary training and tools for profit success.

• Display benchmarks and performances.

• Reward for excellence.

Managing by benchmarks is a key component to your "profit ability". Knowing your numbers, especially your profit targets, gives you a clear roadmap to follow and helps you to stay on course when your profit vision gets blurry.

Step # 3. Maximize Your Current Customer Relations.

• Follow-up after Sale.

• Send monthly offerings.

• Send a personal note to top 20% of customers.

• Provide referrals to your customers for other non-competing services (builds value in you as a resource).

• Send Thank-you notes.

• Remember special dates/events (B/day, Holiday, promotion, etc...).

The initial cost to attract and capture a customer takes a big chunk out of your profits, so keeping your customers is a huge step in your "profit ability" factor. Having a plan in place to keep your customers fresh and attracted to you allows you to re-coup your initial investment in that customer. Studies have shown that it costs up to six times more to capture a new customer than it is to keep a customer- make an investment into keeping your customers, your bottom-line will love it.

Step #4. Leverage Your Customer Base

• Harvest all of the possible opportunities from your existing customers.

• Build an opportunity database with that information and market from it.


• Extend your HVAC product / service line to up-sell and cross-sell.

• Customize your offerings so that you differentiate yourself from the competition.

• Get and use testimonials.

• Get customer feedback on everything.

Your "profit ability" skyrockets when you can create repeat sales to your existing customers. Several different studies have shown that the longer you extend the selling lifecycle of your customer base the greater the increase of your overall profits. Have a plan in place that creates irresistible offers to your customers so that you can sell to them over and over again.

Step #5. Make Your Whole HVAC Business a Salesforce.

• Provide incentives to everyone in your business to sell.

• Make your customers become part of your salesforce by providing Outrageous value and service that they "BUZZ" to everyone about you.

• Reward everyone for referrals.

• Make your suppliers a sales resource for you by referring their products and services to others.

• Make it fun to sell for you.

Imagine what would happen to your "profit ability" if you got everyone involved harvesting opportunities and then converting them into leads and sales. The burden of having a huge sales force can be lessened by turning non-revenue producers into revenue producers simply by creating a selling environment throughout your business. Making this happen will have a huge impact on your profits.

Step #6. Have a Plan to Attract the Correct and Best

• Employees (Rank Best to Worst).

• Customers (Best fit).

• Vendors (products).

• Partners (banker, lawyer, accountant, etc...).


• Opportunities (networking).

• Marketing.

• Ideas.

Don't settle for second best, it costs you profits. Always look to improve the people and ideas you surround yourself with until you find the best possible fit for you and your "profit ability". The people around you are the conduit to your success; they provide the power and energy that connects your success to profits.

Step #7. Make Your HVAC Business Agile

• Automate as much as possible

• Outsource what you can

• Keep overhead as low as possible without sacrificing quality and customer experience

• Don't get it unless it is "YES" to this question; "Will it help me generate revenue and profits?"

• Cross-train employees

It is much easier to acquire costs than it is to shed costs. Make sure that you position your business to run lean and mean. Don't overburden the "profit ability" of your business with unnecessary overhead. Picture a wagon-train; you want more horses in your business than wagons.

Step #8. Keep Changing and Growing

• Stay in touch with current HVAC market conditions and adapt to changing needs.

• Challenge assumptions from within your industry (Be a Leader).

• Experiment with new ideas, processes and products.

• Never stop asking questions.

• Never stop learning.


• Grow from mistakes.

Never assume when it comes to making a profit. Profit slippage easily occurs when you take your "profit ability" for granted, or you become lazy in learning, stubborn with change and happy with status quo. Profits are fleeting moments that will slip away if you loose focus and stop growing.

Step #9. Share Your Success

• Have a profit sharing plan.

• Say "Thank-you" and mean it.

• Give to your community.

• Have a balance in your life.

Don't be greedy; give the people around you personal "profit ability" and watch your "profit ability" skyrocket.

Step #10. Always Deliver More Than You Promised

Keep all your promises.

• Always follow-up.

• Take care of problems.

Your words and actions can increase or decrease your "Profit Ability"!








DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.