Showing posts with label cooling. Show all posts
Showing posts with label cooling. Show all posts

Wednesday, February 8, 2012

Basic Information About Portable Air Conditioners

HVAC technology developments today are giving facility executives options and solutions to their HVAC system requirements that were not available in the past. Equally important, they do not have to sacrifice performance or operating costs to implement these solutions.


The growing dependency on air conditioning for building occupants and equipment cooling has given rise to an entire new generation of cooling equipment that is portable. While building air conditioning systems are very dependable, there are times when they simply aren’t available. Failure of central air conditioning or distribution equipment can shut down systems for extended periods of time. Failures in the building electrical distribution system or the utility company’s system can also shut down large building central air conditioning systems for long periods of time. High levels of electrical demand can force shutdowns of air conditioning systems for several hours.



The problem that many facility executives face is that many of their building occupants cannot afford to be without air conditioning. Computer systems rapidly overheat without air conditioning, forcing system shutdowns that may cost tens of thousands of dollars per minute. Telecommunications equipment is equally sensitive to heat; operations throughout the facility can be disrupted if sufficient air conditioning is not available.


To help protect their operations from disruptions caused by air conditioning outages, many facilities have invested in portable air conditioning units that can be rapidly moved to the required area and installed easily. Units are available in a wide range of capacities and several different configurations, allowing them to be used in practically any application. Many simply plug into standard electrical outlets. Others with larger capacities may require special or dedicated electrical connections.


Applications for portable cooling systems go well beyond those caused by equipment failures. Maintenance operations use the systems to provide cool air to personnel working in confined spaces, such as boiler interiors during shutdowns for inspection or repair. Building occupants use portable units to provide after-hours air conditioning to personnel working in spaces where the central air conditioning system has been shut down to conserve energy. The units can be used to provide supplemental air conditioning to areas where the cooling loads may temporarily exceed the capacity of the central system. Portable air conditioning units are frequently used to provide conditioned air for special events, such as those held outdoors in tents during summer months.



There are two major categories of portable cooling systems: air-to-air systems and water- or refrigerant-based systems. Most portable air-to-air systems have a capacity of one ton or less. They are rolled to the required location and plugged into a standard electrical outlet; the conditioned air is directed where it is needed. Heat from the unit’s condenser is discharged through a window to outside the facility by means of a section of flexible duct. In cases where the unit cannot be located close to a window and the portable unit is to be used for only a short period of time, the heat from the unit’s condenser can be vented above the drop ceiling through ducts. Larger air-to-air systems, typically in the range of one to five tons, can be located outside the facility with the cool air ducted through a window or other building opening.


In cases where it is not easy to duct the portable unit’s condenser heat away from the conditioned space, or where larger capacity units are required, portable cooling systems using once-through water cooling can be used. Available in capacities of up to five tons, the units are fully mobile, requiring only electrical, water supply and drain connections.



The most appropriate applications for portable cooling systems are those that are temporary, either emergency or planned. But portable cooling systems should not be used as permanent fixes for building HVAC problems. While the systems are efficient and dependable, they cannot match the performance of a properly designed and installed building system. Permanent problems are better addressed through modifications of or additions to the existing building system.

Friday, January 27, 2012

Boilers and HVAC Building Automation Systems

With the newest state-of-the-art sensors, direct digital controls and computer driven expert systems, buildings now can be completely automated and remotely controlled. This article will review what such systems and their operators can and cannot do, what new risks can be created for the boilers in such buildings, and how to reduce and control those risks.


Benefits of automation


Intelligent buildings today use a building automation system (BAS) and other systems to operate HVAC, boilers, chillers, lights, elevators, building access fire protection and other systems to achieve the twin goals of efficiency and comfort.


A BAS is defined here as a system of sensors, pilot devices, logic elements, controllers, peripheral computers, and monitoring equipment providing data to a central computer for energy-efficient control of a building’s internal environment while also providing maximum tenant comfort and equipment reliability.


BAS can deliver energy savings, comfort and maintenance/reliability benefits. These benefits cannot be achieved, however, unless the systems are properly integrated. The system designer must anticipate and overcome the risks outlined below.



Thermal shock


When boiler controls are improperly integrated with the BAS, thermal shock can occur in several ways.


The most common is low return water temperature. In a recent claim, a cast iron hot water boiler suffered a cracked section because of cold water returning from the system. The building was a single-story school, with portions of the building distant from the boiler room.


During the fall, the BAS was programmed to reduce the temperature setpoint on weekends. Water in the zones serving remote areas cooled, and when the BAS attempted to bring the building back to normal occupancy temperatures, a slug of cold water cracked the hot boiler sections.


The problem was solved by putting timers on the zone valves to prevent the simultaneous opening. Controls also were added to maintain a minimum floor through the longest loops during reduced temperature operations to maintain a minimum temperature.



In another case, a store chain reported damage to boilers and air conditioning equipment due to thermal shock when the BAS alternated between heating and cooling. This situation was made worse because all the store locations around the country were connected to a central BAS.


The central BAS computer did not adequately allow for transition from heating to cooling operation and vice versa, resulting in boiler damage and business interruption.


Another form of thermal shock can occur in systems that use a three-way bypass valve. When controlled by outdoor air temperature, these valves allow a high bypass, with reduced flow through the boiler. This reduces the temperature delivered to the loop, thereby saving energy.



The problem occurs when the control is so aggressive that the boiler water stratifies the same way water stratifies in a water heater. In situations where the boiler is called on to deliver only minimum input, the burner will cycle frequently. Since the overall temperature is low, the metal is subjected to much higher stresses than intended or designed for by the supplier.


Thermal shock also has occurred in boiler rooms having outside air inlet louvers controlled by the BAS. Cold outside air entering the boiler or equipment room will chill the boiler. If inadequate precautions are provided, thermal shock, freezing or condensation will occur.


Single-pipe heating and cooling systems area also subject to thermal shock. Single-pipe systems — one piping system for heating and cooling — sometimes are selected for low initial cost. Should both heating and cooling be called for within a short period of time, there is a good chance that chilled water will be admitted into the boiler. Serious thermal shock will result.


Two-pipe systems — using separate piping circuits for heating and cooling — do not completely eliminate this risk. If the BAS incorrectly sequences air handling units and if both heating and cooling coils are in the same unit, air cooled by the refrigeration coils will cool the heating coils. This also will cause cold water to return to the boiler.


Another more common event occurs when the BAS calls for 100 percent outside air to save cooling or heating energy. This usually occurs in shared spaces of buildings that do not require heating or cooling for comfort. Spaces such as foyers, lobbies, hallways or large conference rooms frequently receive 100 percent outside air to address indoor air quality concerns.



The heating coils in the air handling units can be subjected to low temperature. When the boiler starts or the local zone calls for heat, the cold water will shock the boiler.


In spaces requiring very strict temperature and humidity controls, simultaneous operation of the heating — temperature control — and cooling systems — to reduce humidity — is needed. Careful attention to the programming of such heat/cool operation is necessary to avoid the potential for cold water return to a hot boiler.


Condensation


When boilers cool below the dew point temperature of the combustion products, flue gas condensation will occur during the boiler warm-up, causing corrosion on fireside surfaces, breeching and stacks.


Corrosion is another leading cause of boiler accidents. Much of the corrosion can be avoided if the BAS is programmed to maintain boiler temperature at or slightly above the flue gas dew point.


Boiler start-up


When a boiler is first started from a cold condition, both the metal and water are cold. If the boiler is designed to adjust firing rates in response to load changes, it is very important to heat the boiler slowly.


The metal structure must be allowed to gradually absorb the stresses that develop as the metal expands with temperature. Most boiler manufacturers include low fire hold into their boiler controls to provide boiler warm-up. BAS programming must not compromise this protection by premature transfer to high firing.


Multiple boilers (Modular)



For buildings with multiple or modular boilers, the hazards discussed above are more difficult to handle. In such cases, BAS programming must recognize the practical limits of boiler operation for all units.


Other concerns


In addition to the mechanical aspects already discussed, there can be other concerns with control system integrity. A BAS is comprised of sensors, pilot devices, logic elements, controllers, peripheral computers and monitoring equipment. All of these devices are sensitive to some of the following conditions.


Electrical transients


A number of claims have recently been reported involving failure of electrical and electronic devices caused by electrical transients. Common disruptions stem from lighting, internal power fluctuations, harmonics and electric utility problems. Without proper protection, an otherwise harmless power fluctuation can result in damage to the boilers if the BAS fails.


Major utility power problems are infrequent. Lighting arresters, surge protection and current controls have made power in the United States very reliable. One source of localized disturbances is not uncommon, however.


Short duration voltage collapse — a few cycles — can occur when utilities attempt to regulate power factors by compensating for inductive loads with large capacitor banks. When the capacitor bank is engaged, the current inrush causes the voltage to sag, which can cause localized disturbances in the power system.


Boiler/BAS Solutions


CONSIDER THESE RECOMMENDATIONS to address common boiler problems related to BAS:



Thermal shock



  • Prevent cold water return by installing three-way mixing valves as a way of limiting the boiler inlet water temperature.

  • Consider a small blending pump to prevent temperature stratification in the boiler.

  • Control the low fire hold to warm the boiler according to boiler manufacturer guidelines.

  • Avoid high fire cut-off when zones are satisfied to avoid rapid temperature change.

  • Don’t overlook the air side as a potential source of thermal shock.



Condensation



  • Avoid control logic that will increase the frequency of boiler cycling.

  • Avoid contact of humid outside air on cool boiler surfaces, or keep the boiler warm.

  • Maintain minimum boiler temperature at or above flue gas dew point.


Electrical transients



  • Properly ground not only the BAS but also all other equipment. Follow the manufacturer’s instructions.

  • Isolate AC power connection to electronics using isolation transformers or equivalent devices.


  • Maintain minimum boiler temperature at or above flue gas dew point.



Recommendations


This article has covered areas of concern when integrating heating and cooling equipment with automatic building controls. BAS control programs must recognize the operating limitations of all controlled equipment, as well as the customary energy optimization, HVAC comfort, and building security objectives.



Building designers and owners and maintenance and engineering managers should always follow the recommended practice of the equipment manufacturers. BAS have the ability to control and monitor equipment and alarms from remote locations. Many states have laws requiring boiler operators to be on site in certain situations.


The ability of the BAS to sound alarms based on preset conditions with actions implemented from a remote location should not replace the actions taken by qualified operators on the scene.

Tuesday, January 24, 2012

What Are The Rooftop HVAC Units?

When rooftop units were first introduced some 40 years ago, they were considered by system designers and building owners to be a bare bones, low cost, simple solution to low-rise building HVAC needs. Low cost was the primary driving force for both manufacturers and users. But while they were popular with designers and owners, many maintenance managers considered them nightmares: difficult to service, prone to breakdowns, inadequately protected from the elements.


Today, everything has changed. Gone is the concept of one size fits all. Buyers have more options, including practically all of the same features found in other types of building HVAC systems, from economizers for energy conservation and prewired interfaces for building automation systems to heat wheels and other heat recovery devices. No longer can the systems be labeled as bare bones.


What has contributed to this change has been a shift in focus from first costs to life-cycle costs by both manufacturers and users. The result has been the development of new rooftop systems that include features to make them more efficient and easier to maintain.


The typical rooftop unit today comes in one of two configurations: single-zone or VAV. Single-zone systems remain the more widely used. They are low-pressure systems that provide a constant volume of airflow to a single zone controlled by a single thermostat. Since they do not include controls for multiple zones, this type of rooftop unit is best suited for use in the areas with fairly uniform heating and cooling loads.



The VAV configuration is gaining popularity, primarily as a result of its ability to serve multiple areas, each with different heating and cooling loads. The typical VAV rooftop unit supplies air at a constant temperature to a distribution system that includes VAV boxes to regulate airflow into each different area. The VAV configuration makes the units more flexible while improving their operating efficiency.


Rooftop units are available today in a wide range of capacities and configurations. The most common cooling configuration uses a DX system, with air or water cooling. Operating efficiencies for air-cooled units range between 1.0 and 1.5 kW per ton, and between 0.80 and 1.0 kW per ton for water-cooled units, including all fan and pump energy use. Units can also be configured to use externally generated chilled water. Today’s typical rooftop unit is 30 percent more efficient than those of earlier generations.


Rooftop units can use hot water, steam, natural gas or propane for heating, with capacities ranging from 40,000 to more than 2 million Btu for natural gas and propane units, and up to 4 million Btu for steam units.


Some of the most common complaints about rooftop units have come from maintenance personnel. Early generation systems simply were not easy to maintain. Access panels were held in place with sheet metal screws. Panels often were not replaced properly and screws were lost, exposing the interior of the unit to the elements. With time, the protective finishes on the exposed panels broke down, resulting in rusting and further exposure of unit components to the elements. Removable panels were often dropped during removal or reinstallation, resulting in damage to the building’s roof. But perhaps the most serious drawback was that the units were not designed to make maintenance easy. As a result, proper maintenance was rarely performed.


New rooftop unit designs facilitate maintenance. Exterior panels are protected by an epoxy finish that resists the elements, practically eliminating rusting problems. Machine screws have been replaced with hinged panels and latches, allowing easier access and more secure fastening of panels. Electronic diagnostic panels have been included in some system designs to ease system setup and troubleshooting. The net result is that rooftop systems offer the same advantages as earlier generation systems — including low first costs, factory assembly and ease of installation — without sacrificing performance or efficiency.


Rooftop units are suited for use in practically any low-rise application, such as in retail and institutional facilities. They are particularly well suited for applications where flexibility is required, such as frequent reconfiguration of interior spaces and functions.

Wednesday, January 18, 2012

Fresh Look At Ductless HVAC Systems

While many types of HVAC systems are advancing, some advances are overlooked because they have occurred in some of the less glamorous types of HVAC systems: rooftop units, split ductless systems and portable AC units. The result of these gains is that facility executives have more options today when it comes to selecting systems and components to meet building needs. But having more options is good only if the most appropriate option is selected for a particular application. Simply rushing into using new HVAC technology without first understanding the appropriateness of that technology for a given application is a recipe for disaster. Inappropriate system selection can result in poor IAQ, poor system performance, high energy use, increased user complaints and maintenance headaches.


Ductless HVAC Systems


Ductless HVAC systems, like rooftop systems, have been widely promoted by some for their low first costs and their ability to provide a quick and easy solution to building HVAC problems. And like rooftop units, they have been widely criticized by maintenance personnel as being difficult to maintain. Ductless HVAC systems, like all other HVAC systems, have their applications and their limitations. Properly applied, they can provide flexibility and improve comfort in a cost-effective way. Improperly applied, they can cause maintenance headaches, contribute to IAQ problems and cause comfort problems for building occupants.


Ductless HVAC systems come in a number of different configurations. Most are two- or four-pipe fan coil units that can provide both heating and cooling. More recently, units have been introduced that are essentially ductless heat pumps, with one portion of the unit mounted in the conditioned space, and the other mounted outside the facility.



The systems offer several advantages that go beyond low first costs. With no central air handler, less mechanical equipment space is required. Lower ceilings can be used since the units require no ductwork. With individual thermostats controlling each unit, spaces can be easily zoned. With all operating components, such as the fan, the thermostat, and the heating and cooling coils located in a single unit, modifications can be readily made to the HVAC system to match changes made in space configuration or use. For these reasons, split ductless systems are frequently found in educational and healthcare facilities, computer rooms, lobbies and building entryways.


The biggest drawback of ductless systems is their inability to supply the occupied space with fresh air. Some fan coil system designs did include a small outdoor air intake, but ongoing problems with the freezing of coils led many maintenance departments to block off these intakes. Split ductless systems do not supply the conditioned space with fresh air. Fresh air to these areas must be provided by a separate system.


Maintenance requirements are an important issue with ductless systems. Because the systems are so simple in their design, and the components so relatively small, maintenance requirements can easily be overlooked. But in spite of their simple design, ductless systems require regular maintenance. Filters must be changed. Condensate pans must be checked and cleaned. Fans and belts must be inspected. Controls must be tested. The problem for many maintenance managers is that the cost of performing the required maintenance may offset any cost advantage offered by the system. But overlooking the maintenance requirements will decrease system performance, shorten equipment life and adversely impact indoor air quality.


Nevertheless, there are good applications for ductless HVAC systems. Because each ductless unit is controlled by its own thermostat, conventional fan-coil-based ductless systems provide an unlimited level of zone control, ideal for applications where individual room control is required. Split ductless systems are also suitable for meeting the HVAC needs of spaces having unusually high cooling loads, such as rooms housing telecommunications or computer equipment.

Monday, January 2, 2012

Five Factors To Energy Efficiency

One of the most popular ways of improving building energy efficiency today is through a lighting systems upgrade. New, energy-efficient lighting systems offer the potential of reducing lighting energy requirements by 35 to 50 percent, with additional savings being realized in reduced air conditioning costs as lower lighting system energy use translates into reduced cooling loads.


When considering energy-efficient lighting systems, facility executives can select from a wide range of options, including fluorescent lamps, compact fluorescent lamps, electronic ballasts, efficient fixture designs and automatic lighting controls. While each of these components is important to the overall operating efficiency of the system, none is more important than the ballast selected. Selecting the proper ballast can make the difference between a lighting system that is simply more efficient than the one it replaced, or one that is highly energy efficient.



All lighting system upgrades today involve replacement of the ballasts. In most cases, the upgrade involves moving from the older magnetic ballast to one of the newer electronic ballasts. Electronic ballasts offer improved operating efficiency over magnetic ballasts, reducing ballast energy requirements by an average of 35 percent. But not all electronic ballasts are created equal. Manufacturers have developed a number of different ballast designs with different characteristics for use in different applications. There are five major ways in which ballast selection will impact the energy performance of the lighting system. To achieve optimal performance from the new lighting system, ballasts must be carefully selected to match the needs of the space.



  1. Electronic Ballast Efficiency

    Simply stated, electronic ballasts are significantly more energy efficient than their magnetic counterparts. As a result, the manufacture of magnetic ballasts will most likely be curtailed for general purpose lighting applications.The improvement in energy efficiency achieved by electronic ballasts comes as a result of several factors, including lower internal losses and higher operating frequencies. Magnetic ballasts suffer from core losses that are inherent in the design and operation of the ballast. Electronic ballasts operate without the need for windings and magnetic fields, thus eliminating magnetic losses completely.


    Electronic ballasts also operate at a higher frequency than magnetic ballasts. Magnetic ballasts operate at line frequency, 60 Hz. This means that the arc that excites the phosphors on the inside surface of the fluorescent tube is triggered 60 times each second. Electronic ballasts operate at frequencies ranging from 20 to 60 kHz. At these higher operating frequencies, the arc excites the phosphors for a longer period of time, resulting in the generation of 10 to 15 percent more light for the same energy use.


    Operating at a higher frequency also eliminates one of the most common complaints associated with fluorescent lamps: flicker. With the arc being triggered at 60 times per second with magnetic ballasts, some people can detect a flicker in the light output of the lamps. Electronic ballasts, with their higher operating frequency, completely eliminate this flicker. While the lamps are still switching on and off with the arc, the higher operating frequency makes it impossible for the eye to detect.



  2. Ballast Factor


    One of the most frequently overlooked yet important items when selecting lighting system components is the ballast factor. The ballast factor is a measurement that rates the relative light output of a ballast with respect to the light output of the same lamp operated by a reference ballast. The higher the ballast factor, the higher the light output of the lamps. The lower the ballast factor, the lower the light output of the lamp and the lower the energy use of the system. The ballast factor is dependent on both the ballast selected and the lamp installed.The ballast factor of the units selected for a particular installation will significantly impact the total light output and energy use of the lighting system. While magnetic ballasts were available in a narrow range of ballast factors, between 0.925 and 0.975, electronic ballasts are available in a wide range of ballast factors — from as low as 0.73 to as high as 1.2. This allows facility executives to select ballasts that provide a wide range of light output.


    Consider a lighting system upgrade where fixtures with magnetic ballasts and T-12 lamps are replaced on a one-for-one basis. If the lighting levels in the existing system were adequate, simply replacing the fixtures with ones using electronic ballasts with a ballast factor of 1.0 and T-8 lamps would reduce energy use, but it would result in an increase in lighting levels. Selecting a ballast with a ballast factor of 0.88 would reduce lighting system energy use even further while maintaining the original lighting levels within the space. A higher ballast factor would increase overall lighting levels, while a lower ballast factor would reduce lighting levels and energy use.


    It should be noted that ballast factor can impact lamp life. High ballast factors generally shorten lamp life and accelerate lamp lumen depreciation. In system designs, these factors must be evaluated against the cost of having to alter the layout of the lighting fixtures.


    By selecting a ballast with the proper ballast factor rating for the lamps that will be used allows facility executives to control both light output and lighting system energy use.



  3. Dimming

    With magnetic ballasts, dimming was an option, but it was not cost effective in most applications. Dimming controllers for magnetic ballasts were bulky, expensive and not very effective. Most systems could not reduce light output much below 50 percent of full brightness. Dimming tended to increase the problems associated with lamp flicker. Many systems required lamps to be started at full brightness, then dimmed to the desired level. As a result, most applications that required dimming yet wanted the efficiency of fluorescent lamp operation installed two separate lighting systems — one fluorescent and one incandescent.Dimming electronic ballasts have eliminated the problems associated with trying to dim magnetic ballasts. Controllers are small and inexpensive. Light output can be controlled to as low as 5 or 10 percent of full brightness. Flicker at low light levels is eliminated due to the high operating frequency of the ballasts. Costing approximately 35 to 50 percent more than conventional electronic ballasts, this new generation of electronic ballasts has made fluorescent lamp dimming practical, efficient and affordable.


    Most dimming electronic ballasts are controlled by a 0-10 volt DC signal from the controller. Some models make use of AC line-phase controller signals, eliminating the need for special control wiring.


    Dimming electronic ballasts can be used in any application where dimming is desirable, such as in meeting rooms. While use of dimming ballasts in these applications will save energy by eliminating the need for a separate incandescent system, the real potential for energy savings comes from applications that can make use of natural light.



    In spaces with even moderate areas of exterior glass, natural light is available for use in lighting the space. To be used effectively though, there must be a way to automatically sense the total light level in the space and adjust the light output of the fluorescent fixtures as the amount of natural light varies. Dimming electronic ballasts give facility executives that capability.


    The typical dimming system uses a sensor to measure the overall lighting level in the space. The sensor, connected to the dimming controller, regulates the light output of the fluorescent fixtures to keep the total light levels constant. A single controller can be connected to all dimming ballasts, or multiple controllers can be connected to individual banks of ballasts based on their distance from the glass. The result will be a decrease in lighting energy requirements of 35 to 75 percent for the typical office application.



  4. Rapid-Start vs. Instant-Start

    Electronic ballasts, like the older magnetic ballasts, are available in two basic types: rapid-start and instant-start. Selection of the ballast type impacts overall energy use because of differences in the operation of the ballasts.All fluorescent lamps need a means of starting the lamps as well as regulating their operation once started. Rapid-start lamps have two circuits. One circuit controls normal operation of the lamp, and the second provides a low voltage to the lamp’s electrodes. This low voltage heats the electrodes to between 70 and 100 degrees Celsius in a few seconds, allowing the lamp to light. Once lit, most rapid-start ballasts continue to supply the voltage to the electrodes, resulting in an energy use of two to three watts per 40 watt lamp.


    Instant-start ballasts do not heat the lamp’s electrodes to start them. Instead, they temporarily apply a high voltage to the lamp that strikes the arc. Once the lamp is lit, the high voltage is turned off. As a result, energy requirements are reduced. This improvement in energy performance comes with a penalty. The use of high voltage to start the arc accelerates erosion of the emissive coating on the lamp’s cathode, decreasing lamp life. Compared to rapid-start ballasts, instant-start ballasts have a lamp life that is approximately 25 percent shorter. The more frequently the lamp is started, the shorter the lamp life.


    The decision to use a rapid-start or instant-start ballast is usually made based on the application. Applications that are switched more frequently, such as those in areas controlled by occupancy sensors, are better suited for rapid-start ballasts. Applications where lights burn for longer times per start can benefit from the energy savings produced by instant-start ballasts, without significantly reducing relamping intervals.


    A third type of electronic ballast is becoming more common: the programmed-start ballast. Programmed-start ballasts offer the energy efficiency of instant-start ballasts without sacrificing lamp life.


    Programmed-start ballasts apply a low voltage to the lamp’s electrodes for starting, like instant-start ballasts. Unlike instant-start ballasts, programmed-start ballasts turn off that voltage once the lamp is lit. By turning off the voltage, these ballasts achieve the energy efficiency of instant-start ballasts, while providing the lamp life of rapid-start ballasts. While programmed-start ballasts are relatively new, they are projected to replace most rapid-start units.




  5. Power Factor

    Power factor is the ratio of active power in a circuit to apparent power. In purely resistive loads, the power factor in the circuit is 1.0. But as electrical loads are added to the circuit that are inductive, such as those from induction motors and ballasts, there is a phase shift in the circuit between the current and the voltage, and the power factor decreases. In most commercial and institutional facilities, the overall power factor is typically between 0.85 and 0.97. In industrial applications, particularly those having a large number of induction motors, it can fall to 0.75 or lower.Power factor impacts the current-carrying capacity of a circuit and the cost of electricity. Depending on the rate structure in effect for the facility, low power factor can carry a significant penalty, costing facilities thousands of dollars each month.


    Power factor is important when considering electronic ballasts because they can cause reductions in overall power factor by distorting the current wave shape. These distortions are measured by the unit’s total harmonic distortion (THD). The higher the THD, the greater the ballast’s impact on power factor. Correcting this distortion is difficult and expensive. Although the load drawn by a single electronic ballast is very low, given the number of ballasts that may be installed in a particular facility, their overall impact on system power factor can be significant and costly.


    Electronic ballasts that limit THD and therefore the impact on power factor tend to cost more than those with a higher THD, but their additional first costs can be quickly recovered, particularly in applications with a high-cost penalty for low power factor and a high lighting load. High THD generated by electronic ballasts and other sources can also cause problems within other electrical equipment in the facilities, such as the overheating of induction motors and interference in office equipment.


    For most applications, limiting electronic ballast THD to values of less than 20 percent will avoid problems with other equipment and low power factor. Electronic ballasts are available with THD ratings of below 10 percent for specialized applications.

Thursday, December 22, 2011

Introducing BigHVAC.com – The HVAC Directory

Miami, FL – BigHVAC.com (http://www.bighvac.com) is the leading HVAC business search engine and directory network serving all local HVAC business users and advertisers. BigHVAC.com helps business decision makers quickly find what they need to manage and grow their businesses, and enables advertisers to reach these users wherever they are across the country.


BigHVAC.com is a place for consumers, contractors and manufactures to locate HVAC services and products. A place for consumers to make an informed purchasing decision. A place for everyone to better understand their HVAC system and what they can do to improve system efficiency.


The HVAC Directory offers both free and paid listings under a number of categories. BigHVAC.com will simplify the way the HVAC industry is searched for relevant results.



Why register your business on BigHVAC.com?


1. Because you can build your HVAC listing the way you want it and edit your listing as you need to.

2. Because it’s free.

3. It’s a great way to help build or promote your HVAC company & brand.

4. Because it’s a way to generate HVAC leads and referrals and you owe nothing for these.

5. Because more and more people are going to the Internet for resources and referrals.

6. Because more links pointing to your website are good for Search Engine Optimization (SEO).

7. Because BigHVAC.com is a dedicated and focused Directory for HVAC contractors.


8. Because promotes Local HVAC contractors and services.


You can check the Directory (using the Zip code search) to verify that your business is not already listed in BigHVAC.com. If you have a business listed on the directory and want to manage it, click on the link at the bottom of your listing, then click on the link to upgrade your account. This will save time in getting your account created. You may then decide when you login to keep the free account and add your content, or upgrade to the enhanced listing service.  You will receive an email verification to the email address you registered; you must click on it and then you’ll be able to add content to your listing. If you do not get the email verification you need to check your spam folder.


This form must be filled out for all free and paid listings in which after the account is created you can then choose which type of listing you’ll be interested in. The mandatory fields are marked with the asterisk.


Who should be listed on HeatingGuide.com?


-   HVAC Contractors

-   Air Conditioning Contractors

-   Geothermal Heating and Cooling Contractors

-   Heating and Cooling Contractors

-   HVAC Equipment and Supplies Contractors

-   HVAC Suppliers

-   Solar Heating and Cooling Contractors

-   Plumbing Contractors

-   Heating Companies

-   Air Conditioning Companies

-  Distributors of HVAC Supplies


About us: The BigHVAC.com (http://www.bighvac.com) Directory is the premier resource for finding local professional HVAC contractors online. The website offers the nation’s buyers a source where they can find the HVAC products and services that they need. The website access information from over 35,000 North American companies, and has over 2 million listings included in different categories. The website also serves as an ad network, and is one of North America’s leading business to business locations. A search will allow users to find specific HVAC companies or services. The homepage features a list of HVAC categories that users can select from. If you are an HVAC residential, commercial or industrial contractor we invite you to include your profile for free in the HVAC Directory.

Monday, November 14, 2011

9 Ways To Beat High Heating Costs This Winter

The increase in heating costs will have a huge impact on facilities’ operations, and there’s no immediate end in sight. High prices may wane later in the winter if it’s severe. If there’s a high demand, prices may lower but not until after January 1, and more likely after the first quarter.



Any FM (facility manager) who locked in a gas price at least a year ago is a hero, but heroes are rare. Most companies are on six-month to one-year purchase contracts and wait until the beginning of the heating contract, or mid summer, to buy. Unfortunately, prices started going up around the beginning of the second quarter this year. If they’ve made commitments to purchase a minimum amount of gas, they’re stuck and must take that load.


Stuck, however, does not necessarily mean helpless. There are still measures facility managers can take to stay within their heating budget this year, and other actions to take that may lower their costs in the future.


1) Know what the facility uses


The first step to lower utility bills is becoming an informed consumer. Once FMs have the tools in place to monitor and benchmark their facilities’ utility usage, they’ll be in a better position to negotiate rates, adjust business operations, or fix faulty equipment. Putting such tools in place can instantly save a company five percent or more on its utility bills.


Energy management software can detect facilities operations that trigger unnecessary over-peak demands, such as all of the elevators going on at once. In addition to monitoring energy use, however, it can forecast loads so operations can be changed before energy peaks occur. The software can be used to adjust equipment scheduling, adjust set points at peak demands, and in extreme times reschedule business tasks.



The software is particularly useful to companies with multiple sites, helping FMs focus on the equipment or operations that most need maintenance to increase efficiency, reduce maintenance and downtime, and maximize staff and budget resources. Even if you’re paying more for energy, it’s still important to get the most you can out of it and keep the company performing smoothly.


2) Have an expert look at the bill


Companies are saying, ‘We need this or that gadget to control how much energy we use.’ Not saying the hardware isn’t necessary, but unless you strategically examine your whole energy expenditure, one-year business needs, and your objectives for how to spend energy dollars, you won’t have an overall solution. Ask the customer to step back and look at their energy use from a higher level to come up with a strategic energy plan that fits in with their business.


The place to start is simply by gathering monthly utility data and information about the site or sites. Then an energy plan skeleton can be created and fleshed out with issues like the company’s rate class. Often companies are in a contract rate or paying for a base demand they don’t know they’re paying for. Their contract may require a minimum monthly purchase of 200 kilowatts, and we find they haven’t used 200 kilowatts in months. Or they have a contract based on a load factor they simply don’t have. So we find a rate that might save them 10 to 20 percent. These are solutions that can be found quickly and deliver savings for years.



The next step is to look through the historical billing data for mistakes made by the utilities to get clients’ refunds. Because of number of customers utility companies have, they make tons of mistakes. Once the facility has an advantageous rate tariff and billing errors have been caught it’s essential to have a monitoring program in place. Tariff structures and rates can change. The facility also may make an advantageous change to its load shape. These potential changes make the energy plan a living document.


Having energy use, rate, and historical billing information puts the energy customers in an incredible negotiating position, especially in a deregulated market where they can get a much better price. They can also get an agreement that includes risk and operational requirements that fit their facilities much better.


3) Take advantage of deregulation


Bundling electricity with natural gas purchases is another way for FMs to lower their utility costs. It can help to lock down a lower, more flatlined price because the customer is committing a bigger piece of their utilities purchase to single provider. In return, the utility company can provide protection from price fluctuations over a specified cap set in the contract.


You’ll see more energy bundling in the long-term. It will be a few years, however, before there are more choices from energy companies who supply both. Natural gas is nationally deregulated and a known commodity play, whereas electricity choices are dependent on state-by-state regulations and facility managers can make better decisions on buying both commodities to provide a hedge on fluctuations.


4) Buy gas at a fixed rate


If the price of oil is significantly higher, people will see higher prices no matter what. The biggest thing energy users can do to avoid price fluctuations, with natural gas prices higher than ever, is lock in a fixed rate for 6 or 12 months.



With a little pre-planning, FMs can lock in costs so they won’t be exposed to unexpected surges. It’s locking in certainty. You won’t get a rock bottom price, but you can protect your business from unexplained rises.


An energy service company (ESCO) should be able to provide a competitive analysis with recommendations, showing the effects on the energy budget of riding the market versus locking in a price. Just before the heating season starts is not a good time to lock in because prices are highest then. After the winter surge is better.


5) Get help


Whether FMs buy fuel at a fixed price or ride the market, few understand and follow the energy industry well enough to get the best energy deals without some expert help. Such varied events as warm weather, a Mideast peace conference, or a promise to dip into the strategic oil reserve can have an impact on far-reaching contract decisions.


There are too many variables and no one solution. Energy consultants can find a best solution for each individual customer, in terms of the marketplace, month, week, type of client, and their load characteristic.


FMs may not be sophisticated enough to play the markets 18 months out. It will take times like this to prepare them for the future. We don’t deny there are a few who can lock in a low rate far in advance, but less than 10 percent watch the market closely and understand the futures game well enough to make purchase decisions 18 months in advance.


6) Consider alternative options



Under deregulation FMs may want to generate their own electricity when prices are soaring, the utility pays companies to shed load, or the utility offers an interruptible load rate. FMs can partner with an electric company that not only can generate electricity on-site but sell the thermal load of that generation at a reduced rate. Inventories of heating oil remain more than 15 percent below 2009, but oil isn’t the only game in town. Facilities can improve their load characteristics by using a combination of fuels. A facility currently dependent on electric heating, for instance, could consider installing natural gas-fired compressors. Using more gas could improve their gas load profile, lower gas costs, and lower the electricity bill.


7) Be aware of the facility’s entire energy picture


We suggest looking beyond the heating bill to find savings. You have energy expenses including oil, gas, electricity, service, and upcoming capital maintenance that could include energy-efficient equipment. If those remain individual pieces, the facilities manager doesn’t grasp the true opportunities. Look at all the pieces and combine them.


For instance, ESCOs can offer a percent off the facility’s heating and electricity bill if the FM will offer a contract to make the facility more energy-efficient. Energy also can be delivered at a greatly discounted rate under a shared savings contract, financing package or BTU contract.


8) Give facility systems a tune-up


While negotiating, FMs can discuss operations and infrastructure with their ESCOs. From a year-out perspective, they should consider the demand-side measures that can be put in place. Many ESCOs and architects have internal and outsourced partners ready to provide retrofits and HVAC service as needed.



Mechanical service can include cleaning ducts and filters, installing high-efficiency motors, and checking the settings on air handlers and boilers. Computers and other equipment in offices generate heat, which may lower the heating needs for those areas. Other options are installing heat recovery systems or preheating incoming cold air. Brown recommends finding an ESCO that offers turnkey services ranging from facility improvements to financial solutions that lower overall costs. You want an energy company that can do more than just offer energy. If you get the lowest price at the gas station, great, but if your car is tuned so it’s using less gas, you’re even better off.


9) Consume efficiently


We see facility executives paying more attention to individual lighting controls, zoned air conditioning, and employee awareness. These days managers are asking employees to take their work and laptops home so the building can be idle after regular business hours. HVAC is either turned down at six o’clock or charged to a cost center. Individual meters are making departments more accountable. And lighting retrofits can include individual automated controls to turn down the lights when employees leave their cubicles, or slide switches that control the lights over each computer.


While some controls can be turned down or operation schedules changed, most corporate facilities are unwilling to lower their temperature set points. You have to keep heating costs in perspective: we don’t recommend energy savings that reduce comfort.




Julian Arhire is a Manager with DtiCorp.com - DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Wednesday, July 6, 2011

The Best Path To Lighting And HVAC Efficiency

The building's chiller is the single biggest user of electricity in a typical facility. Add in the heating system, and the energy used to distribute the heating and cooling to the building, and it is no surprise that most successful energy management programs have focused on lighting and HVAC.

Fortunately, facility executives have many options when it comes to conserving energy in lighting and HVAC systems. By applying new lighting technology, facility executives can cut lighting energy use by an average of 30 to 50 percent, while improving the performance of the lighting system. Lamps with electronic ballasts, lighting controls, high efficiency replacements for incandescent lamps - all are being widely used in lighting system upgrade programs.

Similar improvements are being made in the operation of HVAC systems. New technologies allow facility executives to reduce the energy use of their HVAC systems by 25 to 50 percent, without sacrificing comfort or indoor air quality. High efficiency chillers, direct digital controls, energy management systems - these and other new technologies are being widely applied in building HVAC system upgrades.

Individual Projects or an Integrated Plan?

One of the biggest questions facility executives face when looking at upgrading lighting and HVAC systems is how much should they do. Some technologies offer a fast payback. Other technologies, while reducing energy use and improving the quality of the services provided to the facility, have much longer paybacks, often two or three times longer. Should facility executives focus only on those items that offer a rapid payback, or should they only be concerned with the payback for the overall upgrade program? While the available level of funding can be a limiting factor, other factors must also be considered.

Start with the reasons why the upgrade program is being implemented. Energy conservation, while a driving factor, is not the only issue. The primary purpose of any lighting or HVAC system is to meet the needs of building occupants. When looking to upgrade existing systems, facility executives must focus on the quantity and quality of light and space conditioning needed to meet those needs. Unfortunately, limiting system upgrades to items with a quick payback usually fails to take into account occupant needs. And when occupant needs are overlooked, facility executives risk jeopardizing productivity and morale to the point where tenants may move or the energy management measures that were implemented may be defeated by the occupants.

Another problem with limiting system upgrades to components with quick paybacks is the effect it has on overall system performance. Implementing quick payback projects tends to produce a series of upgrade patches.

But simply replacing the lamps does not address the issue of how much light is actually needed in the space. If the space is overlit, additional energy could have been saved by examining the lighting requirements, changing the number of fixtures installed, using a ballast with a lower ballast factor or installing lighting controls. Similarly, the original chiller may have been oversized for normal operation. Additional savings could have been achieved by installing a smaller chiller, or two smaller chillers whose operation can be staged to match the building load, or by installing a variable speed drive on the new chiller. Even more energy could have been saved by installing a high efficiency cooling tower.

Finally, programs that are implemented in a patchwork fashion are more expensive and more disruptive to building occupants. When the entire system is upgraded, all work in a given area can be performed at the same time. When the system upgrade is implemented as separate components at different times, occupants will be disrupted and finishes disturbed each time a new project is initiated.

For these reasons industry experts recommend that lighting and HVAC upgrades be implemented on a system-wide basis rather than on an individual project basis.

One at a Time?

The next question that the facility executive faces is how to implement the upgrade. Should the lighting system be upgraded before or after the HVAC system, or should those systems be upgraded at the same time? Again, funding may dictate how the program is implemented, but the close interconnections between lighting and HVAC systems suggest that the best approach to upgrading is to upgrade both at the same time.

The strongest interconnection between lighting and HVAC systems is energy use. Lighting systems introduce heat into the conditioned space. For every kilowatt of energy used by the lighting system during the air conditioning season, the HVAC system must remove one kilowatt of heat, or slightly more than 3,400 Btu. The higher the lighting load, the higher the load on the building's chillers.

Not only does this increase the cooling energy requirement for the building, but also it increases the size of the chiller required to cool the building.

A comprehensive lighting upgrade program will reduce the load on the building's chiller, lowering its energy use. If the load reduction is large enough and if the HVAC system is being upgraded at the same time, it may be possible to replace the chiller with a smaller unit, saving both installation and operating costs.

A second link between the lighting and HVAC systems is a result of the type of work that must be performed during the system upgrade construction. During a lighting system upgrade, ceilings are removed and replaced, and overhead wiring is installed and connected to new wall- mounted controls. During an HVAC system upgrade, ceilings are removed and replaced, overhead ductwork and distribution units are installed, and control wiring is run between overhead units and wall-mounted thermostats. If lighting and HVAC system upgrades are not performed at the same time, many of the construction demolition and replacement tasks must be performed twice.

A third interconnection is relatively new and is increasing in importance as facility executives move towards interoperability in building automation systems. In the past, lighting and HVAC systems were treated as independent systems despite their energy connection. Neither system could communicate with or share operating information with the other.

New building automation system designs are replacing these independent control systems with ones that are fully interoperable. In an interoperable system, conditions and control actions in one system can be shared with other components in the building automation system. For example, when the lighting system's occupancy sensors determine that a space is unoccupied and turn off the lighting system, a signal can be sent to the HVAC system directing it to reduce the airflow to that space to a minimum setting.

By performing the upgrades to the lighting and HVAC systems at the same time, facility executives can take advantage of opportunities arising from these interconnections, opportunities to further improve system performance while reducing energy use. Unfortunately, when upgraded separately, many of these opportunities are not available.

Paying for Upgrades

Upgrading lighting and HVAC systems generally is an expensive undertaking. While most well-designed and properly implemented system upgrades will pay for themselves through energy savings in five to eight years, depending on the scope of the upgrade, not all organizations can afford to pay for the upgrades up front. Rather than cut back the scope of the upgrade project, facility executives have the option of entering into a performance contract with an energy service organization.

The concept of an energy performance contract is straightforward. An outside contractor, vendor or utility pays for the energy upgrade up front, and recovers its investment over a set period of time by being paid back from the energy cost savings generated by the upgrade. There are two basic types of energy performance contracts: guaranteed savings and shared savings.

Types of Contracts

The guaranteed savings contract establishes a fixed level of energy savings from which the contractor will be reimbursed for expenses. If the energy modifications fail to achieve this guaranteed level of energy savings, the contractor absorbs the loss. If the level of savings exceeds the guaranteed level, the facility keeps the difference. Guaranteed savings contracts tend to be used more on long-term, high-dollar projects when the facility executives wants to minimize risks to the facility.

The shared savings contract establishes how the energy savings produced by the system upgrades will be divided between the contractor and the facility. How the savings are split between the contractor and facility varies from contract to contract, but most set the split at a given rate, such as 50-50 or 30-70. Shared savings contracts are more commonly used in short-term, low-dollar projects.

Energy performance contracts offer a number of advantages. Facilities do not have to invest capital up front to implement system upgrades. Regardless of the initial cost, entire upgrade programs can be implemented quickly. Both the guaranteed savings and the shared savings contracts generate a positive cash flow from their initiation. Facilities do not have to carry debt as a result of the upgrade.

They do, however, have their challenges. Energy performance contracts are more complex than other contracts, particularly if the process is being bid. All will include early termination penalties that levy costs against the facility in the event that the contract is terminated early. But the biggest challenge and the biggest risk of performance contracts comes from projecting future energy use for the facility based on its historical use. To do this, a baseline must be established. Energy use data must be collected for a three- to five-year period and normalized to correct for such factors as variations in weather, area changes within the facility, changes in use of the facility and past energy conservation efforts. Without this normalized baseline data, facility executives would not be able to determine the savings that are the result of contractor's upgrades.

Finally, facility executives must carefully evaluate both the contractor and the upgrades the contractor is proposing to perform to determine that the energy savings will not come at the expense of a quality working environment for building occupants or the long-term health of the facility and its systems.




Julian Arhire is a Manager with DtiCorp.com - DtiCorp.com carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more.

Monday, November 29, 2010

21 New Honeywell TP970 Pneumatic Thermostats From DtiCorp.com

Fort Lauderdale, FL – Popular Honeywell online retailer DtiCorp.com (http://www.DtiCorp.com) is introducing 21 brand new Honeywell TP970 pneumatic thermostats. Two-pipe, single setpoint, pneumatic thermostats used to provide proportional control of pneumatic valves and damper actuators in heating and air conditioning systems. Replacement kits are available for Johnson, Powers, Robertshaw, Barber-Colman, and older Honeywell two-pipe pneumatic thermostats.


Features:


- Honeywell’s best pneumatic thermostat-TP970 series.

- Shock-resistant, suspension-mounted thermostats provide dependable performance and responsiveness year in and year out.

- Pilot operated for high capacity.

- Direct Acting (DA) and Reverse Acting (RA) models are available.


- Wide throttling range models for Zero Energy Band (ZEB) operation are available.

- Adapter plate in Convertastat and Modernization kits covers existing thermostat wall mark.

- Backplate has molded air connections-no separate fittings needed.

- Universal locking cover with satin chrome finish and horizontal, vertical, or blank window options.

- Typical Wide Throttling Range Application.


Specifications:


- The TP970 and TP9600 are single-temperature, pilot-bleed, two-pipe thermostats. The TP970A and TP9600A are used for heating (Direct Acting [DA]), the TP970B and the TP9600B for cooling (Reverse Acting [RA]), and the TP970C and D for heating/cooling. There are TP970A and B models with Limited

Control Range (LCR) for energy conservation. The TP970C and D have a wide throttling range capability, allowing an adjustable Zero Energy Band (ZEB) between heating and cooling operations.


- The TP971A-E and TP9610A,B are two-temperature, pilotbleed, two-pipe thermostats for DAY/NITE operation, with automatic switchover from mainline pressure. The TP971C is a three-pipe thermostat for unit ventilator DAY/NITE application.


- The TP972A and TP9620A are single-temperature,pilotbleed, two-pipe thermostats with cooling/heating cycles and automatic switchover from mainline pressure. The TP972A2143 is designed specifically for replacing Johnson cooling/heating thermostats

- The TP973A, B and TP9630A,B are one- or two-pipe bleedtype thermostats for heating or cooling applications.

- The TP974A is a pneumatic space temperature sensor for either one- or two-pipe applications. It is suitable as a remote temperature indicator or as the sensor for a receiver controller.

- The TP978 is a dual-element bleed-type thermostat used in dual one-pipe applications, suitable for use with variable volume systems. These thermostats may be used to control separate heating and cooling actuators in sequence, with a Zero Energy Band (ZEB) for energy conservation. The heating setpoint is limited to 73F (23C) maximum, and the cooling setpoint is limited to 77F (25C) minimum. Heating and cooling are available in both DA and RA configurations. Except for the TP978E, there are no upgraded replacements for the TP978.

- The TP979 contains two cooling/heating, DAY/NITE thermostats. They are one- or two-temperature, two-pipe thermostats for independent proportioning control of heating and cooling.


Pneumatic Cover Kits (Order Cover Separately)


- 14004406-910 Satin Chrome Kit works with TP970, TP971, TP972, TP973, TP974


- 14004406-910C Satin Chrome Kit works with TP970, TP971, TP972, TP973, TP974

- 14004406-910H Satin Chrome Kit works with HP970, HP971, HP972


- 14004407-910 Beige Kit works with TP970, TP971, TP972, TP973, TP974

- 14004407-910C Beige Kit works with TP970, TP971, TP972, TP973, TP974

- 14004787-910 Bright Chrome Kit works with TP970, TP971, TP972, TP973, TP974

- 14004878-910 White Kit works with TP970, TP971, TP972, TP973, TP974

- 14004910-001 works with TP9600

- 14004910-004 works with TP9600



Models available:


1. TP970A2004 Pneumatic Thermostat Direct Acting, Heating

2. TP970A2012 Pneumatic Thermostat Direct Acting, Heating


3. TP970A2020 Pneumatic Thermostat Direct Acting, Heating

4. TP970A2038 Pneumatic Thermostat Direct Acting, Heating

5. TP970A2053 Pneumatic Thermostat Direct Acting, Heating

6. TP970A2145 Pneumatic Thermostat Direct Acting, Heating

7. TP970A2152 Pneumatic Thermostat Direct Acting, Heating


8. TP970A2234 Pneumatic Thermostat Direct Acting, Heating

9. TP970A2242 Pneumatic Thermostat Direct Acting, Heating

10. TP970A2259 Pneumatic Thermostat Direct Acting, Heating

11. TP970A2283 Pneumatic Thermostat Direct Acting, Heating


12. TP970A2309 Pneumatic Thermostat Direct Acting, Heating

13. TP970A2317 Pneumatic Thermostat Direct Acting, Heating

14. TP970B2002 Pneumatic Thermostat Reverse Acting, Cooling

15. TP970B2010 Pneumatic Thermostat Reverse Acting, Cooling


16. TP970B2077 Pneumatic Thermostat Reverse Acting, Cooling

17. TP970B2150 Pneumatic Thermostat Reverse Acting, Cooling

18. TP970B2166 Pneumatic Thermostat Reverse Acting, Cooling

19. TP970B2182 Pneumatic Thermostat Reverse Acting, Cooling

20. TP970B2216 Pneumatic Thermostat Reverse Acting, Cooling


21. TP970C2000 Pneumatic Thermostat Direct Acting



About Us: DtiCorp.Com (http://www.DtiCorp.com) carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more. Our online catalog is easy to navigate and search, and all products have a picture and a description. If a customer has any questions about a product, they can call 800-757-5999 and speak with one of our product experts. Our mission is to offer the best prices anywhere to our customers.



Julian Arhire

Manager DtiCorp.com

Phone: 954.298.2515

Fax: 954.206.0767

Web: http://www.DtiCorp.com

Tuesday, November 23, 2010

DtiCorp.com Is Introducing 29 Honeywell Two-Way Globe Valves

Fort Lauderdale, FL – Popular Honeywell online retailer DtiCorp.com (http://www.DtiCorp.com) is introducing 29 brand new Honeywell V5011 Two-Way Globe Valves. The V5011 is a two-way threaded globe valve that controls steam, water, and glycol solutions (up to 50 percent concentration) in heating or cooling HVAC applications. The valve is used in two-position and modulating control systems. The valve is not suitable for combustible gas service.



Features:


- Sizes range from 1/2 to 2 inches.

- Direct and reverse acting

- High pressure steam models with stainless steel trim

- Spring-loaded, self-adjusting packing.

- Stainless steel stem prevents corrosion.

- Valve designs provide equal percentage characteristics of flow for close control of water, and linear characteristic of flow for close control of steam or chilled water.

- Valves utilize direct mounting, electric or pneumatic linear valve actuators; Q5001 linkage with Modutrol Motor; or Q5020/Q5022A linkages with direct coupled rotary actuators to operate the valve.

- Not suitable for combustible gases.



Specifications:


- Pipe Connections: Internal NPT-threaded connections.

Seat: Stainless steel, replaceable (except V5011N3xxx 3/4 in. to 1-1/4 in. which have an integral brass seat).

- ANSI Body Class: 150 psi.

- Stem: Stainless steel.

- Plug: Brass on V5011N1xxx and V5011N3xxx for water; stainless steel on V5011N2xxx for steam.

- Stroke: 3/4 in. (20 mm).

- Approximate Leakage Rate: 0.05 percent Cv.

- Pattern: 2-way, straight-through.


- Body Material: Red brass.

- Packing: Spring-loaded, carbon fiber reinforced PTFE V-rings.

- Rangeability: 50:1 per VDI/VDE 2173.

- Pressure-Temperature Ratings:

- Water: 36°F to 248°F, 217 psi (15 bar).

248°F to 337°F, 185 psi (12.8 bar).

- Maximum Water Differential Pressure: 230 psid (15.8 bar).

- Steam: 100 psi (6.9 bar) at 337°F (V5011N2xxx).

- Maximum Differential for Quiet Water Service: 20 psid.


- Valve Flow Characteristics:

- Water: Equal percentage (V5011N1xxx, V5011N3xxx).

- Steam: Linear (V5011N2xxx).

- Valve Design Life: 250,000 full cycles at maximum rated temperature.

- Mounting: The preferred valve mounting position is with the stem vertical. For steam applications, mount with the stem at a 45 degree angle. Do not mount the valve with the stem more than 90 degrees from the vertical (pointing lower than horizontal). Scale and foreign material can collect, scoring the stem and causing packing leakage. Protect the stem from damage due to bending or scratching.


Models available:


1. V5011F1105 Two-way, Globe, 2 1/2 in, (Female) NPT, 63 Cv, Water or Glycol

2. V5011F1113 Two-way, Globe, 3 in, (Female) NPT, 100 Cv, Water or Glycol


3. V5011G1111 Two-way, Globe, 2 1/2 in, (Female) NPT, 63 Cv, Steam

4. V5011G1129 Two-way, Globe, 3 in, (Female) NPT, 100 Cv, Steam

5. V5011N1008 Two-way, Globe, 1/2 in, (Female) NPT, 0.73 Cv, Water or Glycol

6. V5011N1016 Two-way, Globe, 1/2 in, (Female) NPT, 1.16 Cv, Water or Glycol

7. V5011N1024 Two-way, Globe, 1/2 in, (Female) NPT, 1.85 Cv, Water or Glycol

8. V5011N1032 Two-way, Globe, 1/2 in, (Female) NPT, 2.9 Cv, Water or Glycol

9. V5011N1040 Two-way, Globe, 1/2 in, (Female) NPT, 4.7 Cv, Water or Glycol

10. V5011N1057 Two-way, Globe, 3/4 in, (Female) NPT, 7.3 Cv, Water or Glycol

11. V5011N1065 Two-way, Globe, 1 in, (Female) NPT, 11.7 Cv, Water or Glycol


12. V5011N1073 Two-way, Globe, 1 1/4 in, (Female) NPT, 18.7 Cv, Water or Glycol

13. V5011N1081 Two-way, Globe, 1 1/2 in, (Female) NPT, 29.3 Cv, Water or Glycol

14. V5011N1099 Two-way, Globe, 2 in, (Female) NPT, 46.8 Cv, Water or Glycol

15. V5011N2006 Two-way, Globe, 1/2 in, (Female) NPT, 0.73 Cv, Water or Glycol or Steam

16. V5011N2014 Two-way, Globe, 1/2 in, (Female) NPT, 1.16 Cv, Water or Glycol or Steam

17. V5011N2022 Two-way, Globe, 1/2 in, (Female) NPT, 1.85 Cv, Water or Glycol or Steam

18. V5011N2030 Two-way, Globe, 1/2 in, (Female) NPT, 2.9 Cv, Water or Glycol or Steam

19. V5011N2048 Two-way, Globe, 1/2 in, (Female) NPT, 4.7 Cv, Water or Glycol or Steam

20. V5011N2055 Two-way, Globe, 3/4 in, (Female) NPT, 7.3 Cv, Water or Glycol or Steam


21. V5011N2063 Two-way, Globe, 1 in, (Female) NPT, 11.7 Cv, Water or Glycol or Steam

22. V5011N2071 Two-way, Globe, 1 1/4 in, (Female) NPT, 18.7 Cv, Water or Glycol or Steam

23. V5011N2089 Two-way, Globe, 1 1/2 in, (Female) NPT, 29.3 Cv, Water or Glycol or Steam

24. V5011N2097 Two-way, Globe, 2 in, (Female) NPT, 46.8 Cv, Water or Glycol or Steam

25. V5011N3004 Two-way, Globe, 1/2 in, (Female) NPT, 2.9 Cv, Water or Glycol

26. V5011N3012 Two-way, Globe, 1/2 in, (Female) NPT, 4.7 Cv, Water or Glycol

27. V5011N3020 Two-way, Globe, 3/4 in, (Female) NPT, 7.3 Cv, Water or Glycol

28. V5011N3038 Two-way, Globe, 1 in., (Female) NPT, 11.7 Cv, Water or Glycol

29. V5011N3046 Two-way, Globe, 1-1/4 in, (Female) NPT, 18.7 Cv, Water or Glycol



About Us: DtiCorp.Com (http://www.DtiCorp.com) carries more than 35,000 HVAC products, including industrial, commercial and residential parts and equipment from Honeywell, Johnson Contols, Robertshaw, Jandy, Grundfos, Armstrong and more. Our online catalog is easy to navigate and search, and all products have a picture and a description. If a customer has any questions about a product, they can call 800-757-5999 and speak with one of our product experts. Our mission is to offer the best prices anywhere to our customers.


Julian Arhire

Manager DtiCorp.com

Phone: 954.484.2929

Fax: 954.206.0767

Web: http://www.DtiCorp.com